Skip to content

Mango Lakefront Tapola

Certificate Signed

Ahire, Satara 412806 |Promoter: Mv Tapola Private Limited

31 Jan 2025Registered with MahaRERAFirst of 2 registrations
31 Oct 2034Promised completionLatest across registrations
28 Feb 2035Revised completion2 of 2 registrations pushed back, by up to 4 months
90Buildings2 phases
90Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
RERA registrations
2
Phases
2
Buildings
90
Unit types
—90 units in all
Address
9/2P, MDR 138 KM 40/120, Village AhirPIN 412806
Designated bank account
200
Developed in phases
Yes

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 17.76375, 73.72346
Mango Lakefront Tapola is at latitude 17.76375, longitude 73.72346.

Also registered as

Mango Lakefront Tapola Phase 1Mango Lakefront Tapola Phase 2

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 4 months

P52700079010
Registered
31 Jan 2025
Promised
31 Oct 2034
Revised
28 Feb 2035

Completion pushed back 4 months

P52700079069
Registered
3 Feb 2025
Promised
31 Oct 2034
Revised
28 Feb 2035

2 RERA registrations

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5270007901031 Jan 202531 Oct 203428 Feb 2035Mv Tapola Private LimitedProject page
P527000790693 Feb 202531 Oct 203428 Feb 2035Mv Tapola Private LimitedProject page

90 buildings

Buildings and wings named in the registration

Show all 90 buildingsShow fewer buildings

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

90 units registered

— · 90 units
RERABuildingTypeCarpet areaUnits
P52700079069Bungalow No 10D——1
P52700079069Bungalow No 11B——1
P52700079069Bungalow No 12B——1
P52700079069Bungalow No 13B——1
P52700079069Bungalow No 14B——1
P52700079069Bungalow No 15C——1
P52700079069Bungalow No 16C——1
P52700079069Bungalow No 17D——1
Show all 90 unit rowsShow fewer unit rows
RERABuildingTypeCarpet areaUnits
P52700079069Bungalow No 18B——1
P52700079069Bungalow No 19B——1
P52700079069Bungalow No 1A——1
P52700079069Bungalow No 20B——1
P52700079069Bungalow No 21B——1
P52700079069Bungalow No 22B——1
P52700079069Bungalow No 23B——1
P52700079069Bungalow No 24B——1
P52700079069Bungalow No 25D——1
P52700079069Bungalow No 26C——1
P52700079069Bungalow No 27C——1
P52700079069Bungalow No 28C——1
P52700079069Bungalow No 29C——1
P52700079069Bungalow No 2A——1
P52700079069Bungalow No 30D——1
P52700079069Bungalow No 31C——1
P52700079069Bungalow No 32C——1
P52700079069Bungalow No 33C——1
P52700079069Bungalow No 34C——1
P52700079069Bungalow No 35C——1
P52700079069Bungalow No 36D——1
P52700079069Bungalow No 37D——1
P52700079069Bungalow No 38C——1
P52700079069Bungalow No 39C——1
P52700079069Bungalow No 3A——1
P52700079069Bungalow No 40C——1
P52700079069Bungalow No 41C——1
P52700079069Bungalow No 42C——1
P52700079010Bungalow No 43C——1
P52700079010Bungalow No 44C——1
P52700079010Bungalow No 45C——1
P52700079010Bungalow No 46C——1
P52700079010Bungalow No 47D——1
P52700079010Bungalow No 48D——1
P52700079010Bungalow No 49D——1
P52700079069Bungalow No 4A——1
P52700079010Bungalow No 50C——1
P52700079010Bungalow No 51C——1
P52700079010Bungalow No 52C——1
P52700079010Bungalow No 53C——1
P52700079010Bungalow No 54C——1
P52700079010Bungalow No 55D——1
P52700079010Bungalow No 56D——1
P52700079010Bungalow No 57C——1
P52700079010Bungalow No 58C——1
P52700079010Bungalow No 59C——1
P52700079069Bungalow No 5B——1
P52700079010Bungalow No 60C——1
P52700079010Bungalow No 61D——1
P52700079010Bungalow No 62D——1
P52700079010Bungalow No 63C——1
P52700079010Bungalow No 64C——1
P52700079010Bungalow No 65C——1
P52700079010Bungalow No 66C——1
P52700079010Bungalow No 67D——1
P52700079010Bungalow No 68D——1
P52700079010Bungalow No 69D——1
P52700079069Bungalow No 6B——1
P52700079010Bungalow No 70C——1
P52700079010Bungalow No 71C——1
P52700079010Bungalow No 72C——1
P52700079010Bungalow No 73C——1
P52700079010Bungalow No 74C——1
P52700079010Bungalow No 75B——1
P52700079010Bungalow No 76C——1
P52700079010Bungalow No 77C——1
P52700079010Bungalow No 78C——1
P52700079010Bungalow No 79C——1
P52700079069Bungalow No 7B——1
P52700079010Bungalow No 80C——1
P52700079010Bungalow No 81C——1
P52700079010Bungalow No 82C——1
P52700079010Bungalow No 83D——1
P52700079010Bungalow No 84A——1
P52700079010Bungalow No 85A——1
P52700079010Bungalow No 86A——1
P52700079010Bungalow No 87A——1
P52700079010Bungalow No 88A——1
P52700079010Bungalow No 89B——1
P52700079069Bungalow No 8B——1
P52700079010Bungalow No 90D——1
P52700079069Bungalow No 9B——1

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

2 documents held by Deedo, 178 filings listed on MahaRERA's project page

Registration certificate (2)

  • Registration certificateP52700079010 · 31 Jan 2025ViewSource
  • Registration certificateP52700079069 · 3 Feb 2025ViewSource

Finance

  • PAN CardP52700079069 · Samir PAN.pdf · uploaded 19 Nov 2024Source
  • PAN CardP52700079069 · MV tapola Pan card.pdf · uploaded 19 Nov 2024Source
  • PAN CardP52700079010 · Samir PAN.pdf · uploaded 20 Nov 2024Source
  • PAN CardP52700079010 · MV tapola Pan card.pdf · uploaded 20 Nov 2024Source
  • Other – FinanceP52700079069 · Clarification in table G - Form 3.pdf · uploaded 30 Nov 2024Source

Legal

  • Declaration Form BP52700079069 · Form B.pdf · uploaded 19 Nov 2024Source
Show all 180 documentsShow fewer documents

Legal

  • Legal Title reportP52700079010 · Legal Title Report.pdf · uploaded 20 Nov 2024Source
  • Declaration Form BP52700079010 · Form B.pdf · uploaded 20 Nov 2024Source
  • Legal Title reportP52700079069 · Legal Title Report - Format A.pdf · uploaded 5 Dec 2024Source
  • Other – LegalP52700079069 · AFS - Mango Lakefront Tapola Phase 2.pdf · uploaded 10 Dec 2024Source
  • Other – LegalP52700079010 · AFS - Mango Lakefront Tapola Phase 1.pdf · uploaded 10 Dec 2024Source
  • Other – LegalP52700079069 · Legal Title Report - Format A.pdf · uploaded 19 Dec 2024Source
  • Other – LegalP52700079069 · POA - Walne.pdf · uploaded 23 Jan 2025Source
  • Other – LegalP52700079069 · Declaration of Allotment of Bungalows to Land Owners.pdf · uploaded 24 Jan 2025Source
  • Other – LegalP52700079010 · Legal Title Report - Format A.pdf · uploaded 24 Jan 2025Source
  • Other – LegalP52700079010 · Declaration of Allotment of Bungalows to Land Owners.pdf · uploaded 24 Jan 2025Source
  • Other – LegalP52700079010 · POA - Ahir.pdf · uploaded 24 Jan 2025Source

Migrated

  • 1 PAN CardP52700079069 · MV tapola Pan card.pdf · uploaded 19 Nov 2024Source
  • 2 PAN CardP52700079069 · Samir PAN.pdf · uploaded 19 Nov 2024Source
  • 1 a Details of encumbrances concerned to FinanceP52700079069 · Declaration of Encumbrances - Finance.pdf · uploaded 19 Nov 2024Source
  • 2 a Details of encumbrances concerned to FinanceP52700079069 · Declaration of Encumbrances - Legal.pdf · uploaded 19 Nov 2024Source
  • 1 Copy of Layout Approval (in case of layout)P52700079069 · Walne Approved Plan 1-6.pdf · uploaded 19 Nov 2024Source
  • 2 Copy of Layout Approval (in case of layout)P52700079069 · Walne Approved Plan 2-6.pdf · uploaded 19 Nov 2024Source
  • 3 Copy of Layout Approval (in case of layout)P52700079069 · Walne Approved Plan 3-6.pdf · uploaded 19 Nov 2024Source
  • 4 Copy of Layout Approval (in case of layout)P52700079069 · Walne Approved Plan 4-6.pdf · uploaded 19 Nov 2024Source
  • 5 Copy of Layout Approval (in case of layout)P52700079069 · Walne Approved Plan 5-6.pdf · uploaded 19 Nov 2024Source
  • 6 Copy of Layout Approval (in case of layout)P52700079069 · Walne Approved Plan 6-6.pdf · uploaded 19 Nov 2024Source
  • 1 Declaration in FORM BP52700079069 · Form B.pdf · uploaded 19 Nov 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52700079069 · Form 1.pdf · uploaded 19 Nov 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52700079069 · Form 3.pdf · uploaded 19 Nov 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52700079069 · Form 2.pdf · uploaded 19 Nov 2024Source
  • 1 Commencement Certificates / NA Order for plotted developmentP52700079069 · CC-walne.pdf · uploaded 19 Nov 2024Source
  • 1 CERSAI detailsP52700079069 · CERSAI Undertaking.pdf · uploaded 19 Nov 2024Source
  • 1 Declaration about all RERA Designated Bank Accounts (Format A)P52700079069 · Declaration about RERA designated Bank Account.pdf · uploaded 19 Nov 2024Source
  • 1 b Details of encumbrances concerned to LegalP52700079069 · Declaration of Encumbrances - Finance.pdf · uploaded 19 Nov 2024Source
  • 2 b Details of encumbrances concerned to LegalP52700079069 · Declaration of Encumbrances - Legal.pdf · uploaded 19 Nov 2024Source
  • 1 PAN CardP52700079010 · MV tapola Pan card.pdf · uploaded 20 Nov 2024Source
  • 2 PAN CardP52700079010 · Samir PAN.pdf · uploaded 20 Nov 2024Source
  • 1 Copy of the legal title reportP52700079010 · Legal Title Report.pdf · uploaded 20 Nov 2024Source
  • 1 a Details of encumbrances concerned to FinanceP52700079010 · Declaration of Encumbrances - Finance.pdf · uploaded 20 Nov 2024Source
  • 2 a Details of encumbrances concerned to FinanceP52700079010 · Declaration of Encumbrances - Legal.pdf · uploaded 20 Nov 2024Source
  • 5 Copy of Layout Approval (in case of layout)P52700079010 · Ahir Approved Plan 5-5.pdf · uploaded 20 Nov 2024Source
  • 4 Copy of Layout Approval (in case of layout)P52700079010 · Ahir Approved Plan 4-5.pdf · uploaded 20 Nov 2024Source
  • 3 Copy of Layout Approval (in case of layout)P52700079010 · Ahir Approved Plan 3-5.pdf · uploaded 20 Nov 2024Source
  • 2 Copy of Layout Approval (in case of layout)P52700079010 · Ahir Approved Plan 2-5.pdf · uploaded 20 Nov 2024Source
  • 1 Copy of Layout Approval (in case of layout)P52700079010 · Ahir Approved Plan 1-5.pdf · uploaded 20 Nov 2024Source
  • 1 Declaration in FORM BP52700079010 · Form B.pdf · uploaded 20 Nov 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52700079010 · Form 1.pdf · uploaded 20 Nov 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52700079010 · Form 3.pdf · uploaded 20 Nov 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52700079010 · Form 2.pdf · uploaded 20 Nov 2024Source
  • 1 Commencement Certificates / NA Order for plotted developmentP52700079010 · CC-Ahir.pdf · uploaded 20 Nov 2024Source
  • 1 CERSAI detailsP52700079010 · CERSAI Undertaking.pdf · uploaded 20 Nov 2024Source
  • 1 Declaration about all RERA Designated Bank Accounts (Format A)P52700079010 · Declaration about RERA designated Bank Account.pdf · uploaded 20 Nov 2024Source
  • 1 b Details of encumbrances concerned to LegalP52700079010 · Declaration of Encumbrances - Finance.pdf · uploaded 20 Nov 2024Source
  • 2 b Details of encumbrances concerned to LegalP52700079010 · Declaration of Encumbrances - Legal.pdf · uploaded 20 Nov 2024Source
  • 6 Building Plan Approval / NA Order for plotted developmentP52700079069 · Walne Approved Plan 6-6.pdf · uploaded 21 Nov 2024Source
  • 1 Building Plan Approval / NA Order for plotted developmentP52700079069 · Walne Approved Plan 1-6.pdf · uploaded 21 Nov 2024Source
  • 2 Building Plan Approval / NA Order for plotted developmentP52700079069 · Walne Approved Plan 2-6.pdf · uploaded 21 Nov 2024Source
  • 3 Building Plan Approval / NA Order for plotted developmentP52700079069 · Walne Approved Plan 3-6.pdf · uploaded 21 Nov 2024Source
  • 4 Building Plan Approval / NA Order for plotted developmentP52700079069 · Walne Approved Plan 4-6.pdf · uploaded 21 Nov 2024Source
  • 5 Building Plan Approval / NA Order for plotted developmentP52700079069 · Walne Approved Plan 5-6.pdf · uploaded 21 Nov 2024Source
  • 1 Disclosure for secured/unsecured finance availed for the projectP52700079069 · Disclosure for secured unsecured finance availed.pdf · uploaded 21 Nov 2024Source
  • 1 Proforma of Allotment letterP52700079010 · Proforma of Allotment Letter.pdf · uploaded 21 Nov 2024Source
  • 4 Building Plan Approval / NA Order for plotted developmentP52700079010 · Ahir Approved Plan 4-5.pdf · uploaded 21 Nov 2024Source
  • 1 Building Plan Approval / NA Order for plotted developmentP52700079010 · Ahir Approved Plan 1-5.pdf · uploaded 21 Nov 2024Source
  • 2 Building Plan Approval / NA Order for plotted developmentP52700079010 · Ahir Approved Plan 2-5.pdf · uploaded 21 Nov 2024Source
  • 3 Building Plan Approval / NA Order for plotted developmentP52700079010 · Ahir Approved Plan 3-5.pdf · uploaded 21 Nov 2024Source
  • 5 Building Plan Approval / NA Order for plotted developmentP52700079010 · Ahir Approved Plan 5-5.pdf · uploaded 21 Nov 2024Source
  • 1 Deviation Report with respect to Allotment letterP52700079010 · Proforma of Allotment Letter - Deviation report.pdf · uploaded 21 Nov 2024Source
  • 1 Disclosure for secured/unsecured finance availed for the projectP52700079010 · Disclosure for secured unsecured finance availed.pdf · uploaded 21 Nov 2024Source
  • 1 Declaration about Commencement CertificateP52700079069 · Declaration About Commencement Certificate - Format D.pdf · uploaded 22 Nov 2024Source
  • 1 Declaration about Commencement CertificateP52700079010 · Declaration About Commencement Certificate - Format D.pdf · uploaded 22 Nov 2024Source
  • 2 Other – TechnicalP52700079010 · Declaration cum Undertaking - Annexure A.pdf · uploaded 22 Nov 2024Source
  • 3 Other – TechnicalP52700079010 · Screen shot of email with attached CC from MSRDC.pdf · uploaded 22 Nov 2024Source
  • 1 Proforma of Allotment letterP52700079069 · Proforma of Allotment Letter.pdf · uploaded 23 Nov 2024Source
  • 1 Deviation Report with respect to Allotment letterP52700079069 · Proforma of Allotment Letter - Deviation report.pdf · uploaded 23 Nov 2024Source
  • 1 Deviation Report with respect to model copy of AgreementP52700079069 · Proforma of AFS - Deviation report.pdf · uploaded 23 Nov 2024Source
  • 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)P52700079069 · Format B - Opening of RERA designated bank account.pdf · uploaded 25 Nov 2024Source
  • 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)P52700079010 · Format B - Opening of RERA designated bank account.pdf · uploaded 25 Nov 2024Source
  • 2 Other – TechnicalP52700079069 · Screenshot of email from compepative authority.pdf · uploaded 26 Nov 2024Source
  • 3 Other – TechnicalP52700079069 · Declaration cum Undertaking - Annexure A.pdf · uploaded 26 Nov 2024Source
  • 4 Other – TechnicalP52700079069 · Walne Approved Plan 1-6 BUA Highlighted.pdf · uploaded 26 Nov 2024Source
  • 1 Other – FinanceP52700079069 · Clarification in table G - Form 3.pdf · uploaded 30 Nov 2024Source
  • 5 Other – TechnicalP52700079069 · Clarification in table G - Form 3.pdf · uploaded 30 Nov 2024Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsP52700079069 · Disclosure of Interest In Other Real Estate Projects - Annexure A.pdf · uploaded 4 Dec 2024Source
  • 1 Copy of the legal title reportP52700079069 · Legal Title Report - Format A.pdf · uploaded 5 Dec 2024Source
  • 1 Proforma of Agreement for saleP52700079069 · Proforma of AFS.pdf · uploaded 5 Dec 2024Source
  • 3 Other – LegalP52700079069 · AFS - Mango Lakefront Tapola Phase 2.pdf · uploaded 10 Dec 2024Source
  • 4 Other – LegalP52700079010 · AFS - Mango Lakefront Tapola Phase 1.pdf · uploaded 10 Dec 2024Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsP52700079010 · Disclosure of interest in any other real estate organisation.pdf · uploaded 10 Dec 2024Source
  • 1 Deviation Report with respect to model copy of AgreementP52700079010 · Proforma of AFS - Deviation_Report.pdf · uploaded 13 Dec 2024Source
  • 1 Proforma of Agreement for saleP52700079010 · Proforma of AFS.pdf · uploaded 13 Dec 2024Source
  • 6 Other – TechnicalP52700079069 · Authenticity of CC from competent authority.pdf · uploaded 18 Dec 2024Source
  • 4 Other – LegalP52700079069 · Legal Title Report - Format A.pdf · uploaded 19 Dec 2024Source
  • 2 Proforma of Allotment letterP52700079069 · Proforma of Allotment Letter.pdf · uploaded 20 Dec 2024Source
  • 2 Proforma of Agreement for saleP52700079069 · Proforma of AFS.pdf · uploaded 20 Dec 2024Source
  • 1 Other – TechnicalP52700079069 · Competent authority email -Screenshot.pdf · uploaded 10 Jan 2025Source
  • 1 Other – TechnicalP52700079010 · Competent authority email -Screenshot.pdf · uploaded 10 Jan 2025Source
  • 1 Other – LegalP52700079069 · POA - Walne.pdf · uploaded 23 Jan 2025Source
  • 2 Other – LegalP52700079069 · Declaration of Allotment of Bungalows to Land Owners.pdf · uploaded 24 Jan 2025Source
  • 1 Other – LegalP52700079010 · POA - Ahir.pdf · uploaded 24 Jan 2025Source
  • 2 Other – LegalP52700079010 · Declaration of Allotment of Bungalows to Land Owners.pdf · uploaded 24 Jan 2025Source
  • 3 Other – LegalP52700079010 · Legal Title Report - Format A.pdf · uploaded 24 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52700079069 · Form 1.pdf · uploaded 11 Apr 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52700079010 · Form 1.pdf · uploaded 11 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52700079069 · Form 2.pdf · uploaded 30 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52700079010 · Form 2.pdf · uploaded 30 Apr 2025Source
  • Form 1P52700079069 · Form 1 310325.pdf · uploaded 21 Jul 2025Source
  • Form 2P52700079069 · Form 2 310325.pdf · uploaded 21 Jul 2025Source
  • Form 3P52700079069 · Form 3 310325.pdf · uploaded 21 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52700079069 · Disclosure Of Sold, Unsold, Booked Inventary 310325.pdf · uploaded 21 Jul 2025Source
  • Form 1P52700079010 · Form 1 310325.pdf · uploaded 21 Jul 2025Source
  • Form 2P52700079010 · Form 2 310325.pdf · uploaded 21 Jul 2025Source
  • Form 3P52700079010 · Form 3 310325.pdf · uploaded 21 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52700079010 · Disclosure Of Sold, Unsold, Booked Inventary 310325.pdf · uploaded 21 Jul 2025Source
  • Withdrawal Update Form 1P52700079069 · Form 1 300925.pdf · uploaded 12 Dec 2025Source
  • Withdrawal Update Form 2P52700079069 · Form 2 300925.pdf · uploaded 12 Dec 2025Source
  • Withdrawal Update Form 3P52700079069 · Form 3 300925.pdf · uploaded 12 Dec 2025Source
  • Withdrawal Update Form 1P52700079010 · Form 1 300925.pdf · uploaded 12 Dec 2025Source
  • Withdrawal Update Form 2P52700079010 · Form 2 300925.pdf · uploaded 12 Dec 2025Source
  • Withdrawal Update Form 3P52700079010 · Form 3 300925.pdf · uploaded 12 Dec 2025Source
  • Withdrawal Update Form 1P52700079069 · Form 1 - 311225.pdf · uploaded 14 Jan 2026Source
  • Withdrawal Update Form 2P52700079069 · Form 2 - 311225.pdf · uploaded 14 Jan 2026Source
  • Withdrawal Update Form 3P52700079069 · Form 3 311225.pdf · uploaded 14 Jan 2026Source
  • Withdrawal Update Form 1P52700079010 · Form 1 - 311225.pdf · uploaded 14 Jan 2026Source
  • Withdrawal Update Form 2P52700079010 · Form 2 - 311225.pdf · uploaded 14 Jan 2026Source
  • Withdrawal Update Form 3P52700079010 · Form 3 - 311225.pdf · uploaded 14 Jan 2026Source
  • Withdrawal Update Form 1P52700079069 · Form No 1 Mango Lakefront Tapola Phase 2 240426.pdf · uploaded 28 Apr 2026Source
  • Withdrawal Update Form 2P52700079069 · Form No 2 Mango Lakefront Tapola Phase 2 250426.pdf · uploaded 28 Apr 2026Source
  • Withdrawal Update Form 3P52700079069 · Form No 3 Mango Lakefront Tapola Phase 2 270426.pdf · uploaded 28 Apr 2026Source
  • Withdrawal Update Form 1P52700079010 · Form No 1 Mango Lakefront Tapola Phase 1 240426.pdf · uploaded 28 Apr 2026Source
  • Withdrawal Update Form 2P52700079010 · Form No 2 Mango Lakefront Tapola Phase 1 250426.pdf · uploaded 28 Apr 2026Source
  • Withdrawal Update Form 3P52700079010 · Form No 3 Mango Lakefront Tapola Phase 1 280426.pdf · uploaded 28 Apr 2026Source
  • Withdrawal Update Form 1P52700079069 · Form 1 - Mango Lakefront Tapola Phase 2 300626.pdf · uploaded 22 Jul 2026Source
  • Withdrawal Update Form 2P52700079069 · Form 2 - Mango Lakefront Tapola Phase 2 300626.pdf · uploaded 22 Jul 2026Source
  • Withdrawal Update Form 3P52700079069 · Form 3 - Mango Lakefront Tapola Phase 2 300626.pdf · uploaded 22 Jul 2026Source
  • Withdrawal Update Form 1P52700079010 · Form 1 - Mango Lakefront Tapola Phase 1 300626.pdf · uploaded 22 Jul 2026Source
  • Withdrawal Update Form 2P52700079010 · Form 2 - Mango Lakefront Tapola Phase 1 300626.pdf · uploaded 22 Jul 2026Source
  • Withdrawal Update Form 3P52700079010 · Form 3 - Mango Lakefront Tapola Phase 1 300626.pdf · uploaded 22 Jul 2026Source

Technical

  • DocumentP52700079069 · Walne Approved Plan 6-6.pdf · uploaded 19 Nov 2024Source
  • DocumentP52700079069 · Walne Approved Plan 5-6.pdf · uploaded 19 Nov 2024Source
  • DocumentP52700079069 · Walne Approved Plan 4-6.pdf · uploaded 19 Nov 2024Source
  • DocumentP52700079069 · Walne Approved Plan 3-6.pdf · uploaded 19 Nov 2024Source
  • DocumentP52700079069 · Walne Approved Plan 2-6.pdf · uploaded 19 Nov 2024Source
  • DocumentP52700079069 · Walne Approved Plan 1-6.pdf · uploaded 19 Nov 2024Source
  • DocumentP52700079010 · Ahir Approved Plan 5-5.pdf · uploaded 20 Nov 2024Source
  • DocumentP52700079010 · Ahir Approved Plan 4-5.pdf · uploaded 20 Nov 2024Source
  • DocumentP52700079010 · Ahir Approved Plan 3-5.pdf · uploaded 20 Nov 2024Source
  • DocumentP52700079010 · Ahir Approved Plan 2-5.pdf · uploaded 20 Nov 2024Source
  • DocumentP52700079010 · Ahir Approved Plan 1-5.pdf · uploaded 20 Nov 2024Source
  • DocumentP52700079069 · Walne Approved Plan 6-6.pdf · uploaded 21 Nov 2024Source
  • DocumentP52700079069 · Walne Approved Plan 5-6.pdf · uploaded 21 Nov 2024Source
  • DocumentP52700079069 · Walne Approved Plan 4-6.pdf · uploaded 21 Nov 2024Source
  • DocumentP52700079069 · Walne Approved Plan 3-6.pdf · uploaded 21 Nov 2024Source
  • DocumentP52700079069 · Walne Approved Plan 2-6.pdf · uploaded 21 Nov 2024Source
  • DocumentP52700079069 · Walne Approved Plan 1-6.pdf · uploaded 21 Nov 2024Source
  • DocumentP52700079010 · Ahir Approved Plan 5-5.pdf · uploaded 21 Nov 2024Source
  • DocumentP52700079010 · Ahir Approved Plan 4-5.pdf · uploaded 21 Nov 2024Source
  • DocumentP52700079010 · Ahir Approved Plan 3-5.pdf · uploaded 21 Nov 2024Source
  • DocumentP52700079010 · Ahir Approved Plan 2-5.pdf · uploaded 21 Nov 2024Source
  • DocumentP52700079010 · Ahir Approved Plan 1-5.pdf · uploaded 21 Nov 2024Source
  • Other – TechnicalP52700079010 · Screen shot of email with attached CC from MSRDC.pdf · uploaded 22 Nov 2024Source
  • Other – TechnicalP52700079010 · Declaration cum Undertaking - Annexure A.pdf · uploaded 22 Nov 2024Source
  • Other – TechnicalP52700079069 · Walne Approved Plan 1-6 BUA Highlighted.pdf · uploaded 26 Nov 2024Source
  • Other – TechnicalP52700079069 · Declaration cum Undertaking - Annexure A.pdf · uploaded 26 Nov 2024Source
  • Other – TechnicalP52700079069 · Screenshot of email from compepative authority.pdf · uploaded 26 Nov 2024Source
  • Other – TechnicalP52700079069 · Clarification in table G - Form 3.pdf · uploaded 30 Nov 2024Source
  • Other – TechnicalP52700079069 · Authenticity of CC from competent authority.pdf · uploaded 18 Dec 2024Source
  • Other – TechnicalP52700079069 · Competent authority email -Screenshot.pdf · uploaded 10 Jan 2025Source
  • Other – TechnicalP52700079010 · Competent authority email -Screenshot.pdf · uploaded 10 Jan 2025Source

Technical (Architect)

  • DocumentP52700079069 · Form 1.pdf · uploaded 11 Apr 2025Source
  • DocumentP52700079010 · Form 1.pdf · uploaded 11 Apr 2025Source
  • DocumentP52700079069 · Form 1 - Mango Lakefront Tapola Phase 2 300626.pdf · uploaded 22 Jul 2026Source
  • DocumentP52700079010 · Form 1 - Mango Lakefront Tapola Phase 1 300626.pdf · uploaded 22 Jul 2026Source

Technical (Engineer)

  • DocumentP52700079069 · Form 2.pdf · uploaded 30 Apr 2025Source
  • DocumentP52700079010 · Form 2.pdf · uploaded 30 Apr 2025Source
  • DocumentP52700079069 · Form 2 - Mango Lakefront Tapola Phase 2 300626.pdf · uploaded 22 Jul 2026Source
  • DocumentP52700079010 · Form 2 - Mango Lakefront Tapola Phase 1 300626.pdf · uploaded 22 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Ahire, Mahabaleshwar taluka

Survey, CTS, gat or plot numbers

9/2PSurvey No 84/1P

Boundaries

North
Survey No 9-1
South
Survey No 8
East
Survey No 10
West
Survey No 84-1 of village Walne

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.RERA
ArchitectSanjay Kulkarni—P52700079010
ArchitectSanjay Kulkarni—P52700079069
Chartered accountantKamdar Desai Patel Chartered Accountants—P52700079069
Chartered accountantKamdar Desai Patel Chartered Accounts—P52700079010
EngineerR C Tipnis—P52700079010
EngineerR C Tipnis—P52700079069
OtherRushi Tavsalkar—P52700079010
OtherRushi Tavsalkar—P52700079069

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology