SamarthNagar
Certificate SignedVadgaonsheri, Pune 411014 |Promoter: Arihant Associates
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Buildings
- 2
- Unit types
- 2BHK214 units in all
- Address
- 39 1 2 1, 39 1 2 2, 39 2 1A, 39 1 1 2, 39 2 1, Somnathnagar Road, VadgaonsheriPIN 411014
- Designated bank account
- 76
- Developed in phases
- Yes
Location
Coordinates as published by MahaRERA
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion promised for 30 Mar 2026
The latest completion date on record passed 7 months ago.
- Registered
- 3 Nov 2020
- Promised
- 30 Mar 2026
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100026884 | 3 Nov 2020 | 30 Mar 2026 | 30 Mar 2026 | Arihant Associates | Project page |
2 buildings
Buildings and wings named in the registration
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
93 of 214 units booked (43%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| F1 F 2 | 2BHK | 54.82 sq m · 590 sq ft | 4 | 2 |
| F1 F 2 | 2BHK | 59.1 sq m · 636 sq ft | 14 | 3 |
| F1 F 2 | 2BHK | 59.12 sq m · 636 sq ft | 12 | 6 |
| F1 F 2 | 2BHK | 59.45 sq m · 640 sq ft | 14 | 5 |
| F1 F 2 | 2BHK | 59.46 sq m · 640 sq ft | 13 | 7 |
| F1 F 2 | 2BHK | 59.47 sq m · 640 sq ft | 14 | 4 |
| F1 F 2 | 2BHK | 59.48 sq m · 640 sq ft | 12 | 5 |
| F1 F 2 | 2BHK | 59.72 sq m · 643 sq ft | 13 | 6 |
Show all 18 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| F1 F 2 | 2BHK | 59.73 sq m · 643 sq ft | 15 | 6 |
| G1 G2 | 2BHK | 54.82 sq m · 590 sq ft | 4 | 0 |
| G1 G2 | 2BHK | 59.1 sq m · 636 sq ft | 13 | 5 |
| G1 G2 | 2BHK | 59.12 sq m · 636 sq ft | 11 | 6 |
| G1 G2 | 2BHK | 59.45 sq m · 640 sq ft | 12 | 11 |
| G1 G2 | 2BHK | 59.46 sq m · 640 sq ft | 12 | 4 |
| G1 G2 | 2BHK | 59.47 sq m · 640 sq ft | 13 | 5 |
| G1 G2 | 2BHK | 59.48 sq m · 640 sq ft | 12 | 6 |
| G1 G2 | 2BHK | 59.72 sq m · 643 sq ft | 11 | 7 |
| G1 G2 | 2BHK | 59.73 sq m · 643 sq ft | 15 | 5 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
2 documents held by Deedo, 241 filings listed on MahaRERA's project page
Finance
Show all 243 documentsShow fewer documents
Legal
- Declaration Form BNew Form B-3_compressed.pdf · uploaded 20 Oct 2020Source
- Declaration Form BNew Form B-4_compressed.pdf · uploaded 20 Oct 2020Source
- Declaration Form BFORM B ARIHANT.pdf · uploaded 20 Feb 2025Source
- Declaration Form BBLANK PAGE.pdf · uploaded 28 Jul 2026Source
- Declaration Form BAFFIDAVIT CUM DECLARATION ARIHANT ASSOCIATES.pdf · uploaded 28 Jul 2026Source
- Declaration Form BSALE DEED 1.pdf · uploaded 28 Jul 2026Source
- Declaration Form BSALE DEED 2.pdf · uploaded 28 Jul 2026Source
- Declaration Form BA Final Rera Search Report of Arihant Associates.pdf · uploaded 12 Aug 2026Source
Migrated
- 1 PAN CardPAN OF CO.pdf · uploaded 17 Oct 2020Source
- 1 Copy of the legal title reportTitle Search Report of Ms Arihant Associates pdf.pdf · uploaded 17 Oct 2020Source
- 1 Commencement Certificates / NA Order for plotted developmentcommencement certificate-1.pdf · uploaded 20 Oct 2020Source
- 2 Commencement Certificates / NA Order for plotted developmentcommencement certificate-2.pdf · uploaded 20 Oct 2020Source
- 3 Commencement Certificates / NA Order for plotted developmentcommencement certificate-3.pdf · uploaded 20 Oct 2020Source
- 4 Commencement Certificates / NA Order for plotted developmentcommencement certificate-4.pdf · uploaded 20 Oct 2020Source
- 1 Declaration in FORM BNew Form B-1_compressed.pdf · uploaded 20 Oct 2020Source
- 2 Declaration in FORM BNew Form B-2_compressed.pdf · uploaded 20 Oct 2020Source
- 3 Declaration in FORM BNew Form B-3_compressed.pdf · uploaded 20 Oct 2020Source
- 4 Declaration in FORM BNew Form B-4_compressed.pdf · uploaded 20 Oct 2020Source
- 1 Proforma of Allotment letterAllotment Letter.pdf · uploaded 20 Oct 2020Source
- 2 Proforma of Allotment letterDraft_Agreement_for_Sale-Arihant_Associates.pdf · uploaded 20 Oct 2020Source
- 1 Details of encumbrances2 No Encumbrances Letter.pdf · uploaded 23 Oct 2020Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)10 New Architect Certificate_compressed.pdf · uploaded 23 Oct 2020Source
- 1 Copy of Layout Approval (in case of layout)1 Scan_0665-01-page-.pdf · uploaded 26 Oct 2020Source
- 1 Building Plan Approval / NA Order for plotted development2 Scan_0665-02-page-001.pdf · uploaded 26 Oct 2020Source
- 2 Building Plan Approval / NA Order for plotted development3 Scan_0665-04-page-001.pdf · uploaded 26 Oct 2020Source
- 3 Building Plan Approval / NA Order for plotted development4 Scan_0665-03-page-001.pdf · uploaded 26 Oct 2020Source
- 4 Building Plan Approval / NA Order for plotted development6 Scan_0665-05-page-001.pdf · uploaded 26 Oct 2020Source
- 5 Building Plan Approval / NA Order for plotted development6 Scan_0665-060666-01-page-001.pdf · uploaded 26 Oct 2020Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA-Certificate.pdf · uploaded 26 Oct 2020Source
- 1 Disclosure of sold/ booked inventoryDISCOLSURE OF SOLD BOOKED INVENTORY (BUILDING WISE).pdf · uploaded 24 May 2021Source
- 2 Disclosure of sold/ booked inventoryDISCOLSURE OF SOLD BOOKED INVENTORY (BUILDING WISE).pdf · uploaded 24 May 2021Source
- 1 Declaration about Commencement CertificateDeclaration of CC 30 SEPT 2021.pdf · uploaded 6 Oct 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)FORM 2A Quality Assurance Certificate MARCH 2021.pdf · uploaded 6 Oct 2021Source
- 5 Commencement Certificates / NA Order for plotted developmentCommencement Certificate Revised.pdf · uploaded 3 Jan 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5 Arihant Associates FY 2020-2021.pdf · uploaded 3 Jan 2022Source
- 2 Copy of Layout Approval (in case of layout)LAYOUT PLAN 1_5.pdf · uploaded 8 Jan 2022Source
- 6 Building Plan Approval / NA Order for plotted developmentBUILDING PLAN 2_5.pdf · uploaded 8 Jan 2022Source
- 7 Building Plan Approval / NA Order for plotted developmentBUILDING PLAN 3_5.pdf · uploaded 8 Jan 2022Source
- 8 Building Plan Approval / NA Order for plotted developmentBUILDING PLAN 4_5.pdf · uploaded 8 Jan 2022Source
- 9 Building Plan Approval / NA Order for plotted developmentBUILDING PLAN 5-5.pdf · uploaded 8 Jan 2022Source
- 2 Declaration about Commencement CertificateDeclaration of CC_Dec 2021.pdf · uploaded 8 Jan 2022Source
- 3 Disclosure of sold/ booked inventoryCorrigendum Disclosure of Inventory 05012022.pdf · uploaded 8 Jan 2022Source
- 3 Declaration about Commencement CertificateDECLARATION ABOUT COMMENCEMENT CERTIFICATE 31-03-22.pdf · uploaded 27 Apr 2022Source
- 1 CERSAI detailsCERSAI_Search_Report_200235626912_For_Asset_Based_Search_22_04_2022_13_26_57_165.pdf · uploaded 27 Apr 2022Source
- 4 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD - BOOKED INVENTORY 31-03-22.pdf · uploaded 27 Apr 2022Source
- 5 Disclosure of sold/ booked inventoryCorrigendum Disclosure of Inventory UNTIL 15TH OCTOBER 2022.pdf · uploaded 21 Oct 2022Source
- 2 CERSAI detailsCERSAI_Search_Report_200250443327_For_Asset_Based_Search_21_10_2022_20_29_03_287.pdf · uploaded 21 Oct 2022Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 31-12-22.pdf · uploaded 20 Jan 2023Source
- 6 Disclosure of sold/ booked inventoryCorrigendum Disclosure of Inventory 15-01-23.pdf · uploaded 20 Jan 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)F3.pdf · uploaded 20 Jan 2023Source
- 3 CERSAI detailsCERSAI_Search_Report_200258248461_For_Asset_Based_Search_21_01_2023_17_19_27_526.pdf · uploaded 21 Jan 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 05-01-23 (1).pdf · uploaded 23 Jan 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 01-04-23.pdf · uploaded 21 Apr 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 01-04-23.pdf · uploaded 21 Apr 2023Source
- 7 Disclosure of sold/ booked inventoryCorrigendum Disclosure of Inventory 01-04-23.pdf · uploaded 21 Apr 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 20-04-2023 (2)_compressed.pdf · uploaded 24 Apr 2023Source
- 3 Copy of Layout Approval (in case of layout)PLAN-01-09 (3)_compressed (1).pdf · uploaded 28 Apr 2023Source
- 10 Building Plan Approval / NA Order for plotted developmentPLAN-02-09_compressed.pdf · uploaded 28 Apr 2023Source
- 11 Building Plan Approval / NA Order for plotted developmentPLAN-03-09_compressed.pdf · uploaded 28 Apr 2023Source
- 12 Building Plan Approval / NA Order for plotted developmentPLAN-04-09_compressed.pdf · uploaded 28 Apr 2023Source
- 13 Building Plan Approval / NA Order for plotted developmentPLAN-05-09_compressed.pdf · uploaded 28 Apr 2023Source
- 14 Building Plan Approval / NA Order for plotted developmentPLAN-06-09_compressed.pdf · uploaded 28 Apr 2023Source
- 15 Building Plan Approval / NA Order for plotted developmentPLAN-07-09_compressed.pdf · uploaded 28 Apr 2023Source
- 16 Building Plan Approval / NA Order for plotted developmentPLAN-08-09_compressed.pdf · uploaded 28 Apr 2023Source
- 17 Building Plan Approval / NA Order for plotted developmentPLAN-09-09_compressed.pdf · uploaded 28 Apr 2023Source
- 6 Commencement Certificates / NA Order for plotted developmentCC-0027-23 DT 05-04-2023_compressed.pdf · uploaded 28 Apr 2023Source
- 4 Declaration about Commencement CertificateDeclaration of CC.pdf · uploaded 28 Apr 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)FORM 2A 01-04-22.pdf · uploaded 28 Apr 2023Source
- 4 CERSAI detailsCERSAI_Search_Report_200267205954_For_Asset_Based_Search_28_04_2023_10_36_33_980.pdf · uploaded 28 Apr 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)FORM 5.pdf · uploaded 28 Apr 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 01-07-2023.pdf · uploaded 19 Jul 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 30-6-23.pdf · uploaded 19 Jul 2023Source
- 8 Disclosure of sold/ booked inventoryCorrigendum Disclosure of Inventory 01-07-23.pdf · uploaded 19 Jul 2023Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 17-07-23_compressed.pdf · uploaded 19 Jul 2023Source
- 2 PAN CardARIHANT ASSOCIATES PAN NEW.pdf · uploaded 20 Jul 2023Source
- 5 CERSAI detailsCERSAI_Search_Report_200275069995_For_Asset_Based_Search_21_07_2023_12_53_30_533.pdf · uploaded 21 Jul 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 01-10-23.pdf · uploaded 20 Oct 2023Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 01-10-23.pdf · uploaded 20 Oct 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A 01-04-23.pdf · uploaded 20 Oct 2023Source
- 9 Disclosure of sold/ booked inventoryCorrigendum Disclosure of Inventory 01-10-23.pdf · uploaded 20 Oct 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)FORM 5 01-10-23.pdf · uploaded 20 Oct 2023Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 01-01-24.pdf · uploaded 18 Jan 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 31-12-23.pdf · uploaded 18 Jan 2024Source
- 10 Disclosure of sold/ booked inventoryCorrigendum Disclosure of Inventory 31-12-23.pdf · uploaded 18 Jan 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 17-01-24_compressed.pdf · uploaded 18 Jan 2024Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 01-04-24.pdf · uploaded 20 Apr 2024Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 31-03-24.pdf · uploaded 20 Apr 2024Source
- 11 Disclosure of sold/ booked inventoryCorrigendum Disclosure of Inventory 31-03-24.pdf · uploaded 20 Apr 2024Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 22-04-24.pdf · uploaded 25 Apr 2024Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 20-07-24.pdf · uploaded 22 Jul 2024Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 01-07-24.pdf · uploaded 26 Jul 2024Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 30-06-24.pdf · uploaded 26 Jul 2024Source
- 12 Disclosure of sold/ booked inventoryCorrigendum Disclosure of Inventory 30-06-24.pdf · uploaded 26 Jul 2024Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 20-07-24.pdf · uploaded 26 Jul 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 30-09-24.pdf · uploaded 18 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 16-10-24_ ca.pdf · uploaded 18 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 30-09-24.pdf · uploaded 18 Oct 2024Source
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentPART OCCUPANCY CERTIFICATE.pdf · uploaded 18 Oct 2024Source
- 2 Disclosure of sold/ booked inventoryCorrigendum Disclosure of Inventory 30-09-24.pdf · uploaded 18 Oct 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 30-09-24 (2).pdf · uploaded 19 Oct 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 30-09-24 (2).pdf · uploaded 19 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)FORM 5 21-10-24.pdf · uploaded 21 Oct 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 30-09-24 arihant.pdf · uploaded 22 Oct 2024Source
- 3 Disclosure of sold/ booked inventoryCorrigendum Disclosure of Inventory 30-09-24 (2)_compressed.pdf · uploaded 22 Oct 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A - 30-09-24.pdf · uploaded 22 Oct 2024Source
- 1 Declaration about Commencement CertificateFORMAT D Arihant (1).pdf · uploaded 7 Dec 2024Source
- 2 Declaration about Commencement CertificateDeclaration of CC_Circular 21-11-24 (1).pdf · uploaded 7 Dec 2024Source
- 1 CERSAI detailsCersai_Arihant Associates.pdf · uploaded 7 Dec 2024Source
- 1 Other – TechnicalCC Validation Mail (1).pdf · uploaded 7 Dec 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 31-12-24.pdf · uploaded 20 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 14-10-25_compressed.pdf · uploaded 20 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 31-12-24.pdf · uploaded 20 Jan 2025Source
- 1 Disclosure of sold/ booked inventorySold Disclosure_Dec 24.pdf · uploaded 20 Jan 2025Source
- 1 Declaration about all RERA Designated Bank Accounts (Format A)Format A-Client Letter head _Declaration about RERA Designated Bank Accounts.pdf · uploaded 3 Feb 2025Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsDeclaration of Promoter Interest_ Partner wise separate disclosure required HEMLATA PAGARIYA.pdf · uploaded 3 Feb 2025Source
- 2 Disclosure of Interest in Other Real Estate OrganizationsDeclaration of Promoter Interest_ Partner wise separate disclosure required SANTOSH KATARIYA.pdf · uploaded 3 Feb 2025Source
- 3 Disclosure of Interest in Other Real Estate OrganizationsDeclaration of Promoter Interest_ Partner wise separate disclosure required SUNITA KATARIYA.pdf · uploaded 3 Feb 2025Source
- 4 Disclosure of Interest in Other Real Estate OrganizationsDeclaration of Promoter Interest_ Partner wise separate disclosure required CHANDRAKANT PAGARIYA.pdf · uploaded 4 Feb 2025Source
- 1 Declaration in FORM BFORM B ARIHANT.pdf · uploaded 20 Feb 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 31-03-25.pdf · uploaded 18 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 17-04-25.pdf · uploaded 18 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 31-03-25.pdf · uploaded 18 Apr 2025Source
- 1 Disclosure of sold/ booked inventoryCorrigendum Disclosure of Inventory 31-03-25.pdf · uploaded 18 Apr 2025Source
- Form 1FORM 1 31-12-24.pdf · uploaded 12 Jun 2025Source
- Form 2FORM 2 31-12-24.pdf · uploaded 12 Jun 2025Source
- Form 3FORM 3 14-10-25_compressed.pdf · uploaded 12 Jun 2025Source
- Disclosure of Sold and Booked InventorySold Disclosure_Dec 24.pdf · uploaded 12 Jun 2025Source
- Form 1FORM 1 05-01-23.pdf · uploaded 16 Jun 2025Source
- Form 1FORM 1 01-04-23.pdf · uploaded 16 Jun 2025Source
- Form 1Form 1 01-07-2023.pdf · uploaded 16 Jun 2025Source
- Form 1FORM 1 01-10-23.pdf · uploaded 16 Jun 2025Source
- Form 1FORM 1 01-01-24.pdf · uploaded 16 Jun 2025Source
- Form 1FORM 1 01-04-24.pdf · uploaded 16 Jun 2025Source
- Form 1FORM 1 01-07-24.pdf · uploaded 16 Jun 2025Source
- Form 1Form 1 30-09-24.pdf · uploaded 16 Jun 2025Source
- Form 1FORM 1 31-03-25.pdf · uploaded 16 Jun 2025Source
- Form 2FORM 2 31-12-22.pdf · uploaded 16 Jun 2025Source
- Form 2FORM 2 01-04-23.pdf · uploaded 16 Jun 2025Source
- Form 2FORM 2 30-6-23.pdf · uploaded 16 Jun 2025Source
- Form 2FORM 2 01-10-23.pdf · uploaded 16 Jun 2025Source
- Form 2FORM 2 31-12-23.pdf · uploaded 16 Jun 2025Source
- Form 2FORM 2 31-03-24.pdf · uploaded 16 Jun 2025Source
- Form 2FORM 2 30-06-24.pdf · uploaded 16 Jun 2025Source
- Form 2FORM 2 30-09-24.pdf · uploaded 16 Jun 2025Source
- Form 2FORM 2 31-03-25.pdf · uploaded 16 Jun 2025Source
- Form 3FORM 3 13-01-23.pdf · uploaded 16 Jun 2025Source
- Form 3FORM 3 20-04-2023.pdf · uploaded 16 Jun 2025Source
- Form 3FORM 3 17-07-23.pdf · uploaded 16 Jun 2025Source
- Form 3Form 3 21-10-23.pdf · uploaded 16 Jun 2025Source
- Form 3FORM 3 17-01-24_compressed.pdf · uploaded 16 Jun 2025Source
- Form 3FORM 3 22-04-24.pdf · uploaded 16 Jun 2025Source
- Form 3FORM 3 20-07-24.pdf · uploaded 16 Jun 2025Source
- Form 3FORM 3 16-10-24.pdf · uploaded 16 Jun 2025Source
- Form 3Form 3 17-04-25.pdf · uploaded 16 Jun 2025Source
- Disclosure of Sold and Booked InventoryCorrigendum Disclosure of Inventory 15-01-23.pdf · uploaded 16 Jun 2025Source
- Disclosure of Sold and Booked InventoryCorrigendum Disclosure of Inventory 01-04-23.pdf · uploaded 16 Jun 2025Source
- Disclosure of Sold and Booked InventoryCorrigendum Disclosure of Inventory 01-07-23.pdf · uploaded 16 Jun 2025Source
- Disclosure of Sold and Booked InventoryCorrigendum Disclosure of Inventory 01-10-23.pdf · uploaded 16 Jun 2025Source
- Disclosure of Sold and Booked InventoryCorrigendum Disclosure of Inventory 31-12-23.pdf · uploaded 16 Jun 2025Source
- Disclosure of Sold and Booked InventoryCorrigendum Disclosure of Inventory 31-03-24.pdf · uploaded 16 Jun 2025Source
- Disclosure of Sold and Booked InventoryCorrigendum Disclosure of Inventory 30-06-24.pdf · uploaded 16 Jun 2025Source
- Disclosure of Sold and Booked InventoryCorrigendum Disclosure of Inventory 30-09-24_compressed.pdf · uploaded 16 Jun 2025Source
- Disclosure of Sold and Booked InventoryCorrigendum Disclosure of Inventory 31-03-25.pdf · uploaded 16 Jun 2025Source
- Withdrawal Update Form 1FORM 1 01-07-24.pdf · uploaded 25 Jul 2025Source
- Withdrawal Update Form 2FORM 2_30th june 2025.pdf · uploaded 25 Jul 2025Source
- Withdrawal Update Form 3FORM 3_30th June 2025_compressed (1).pdf · uploaded 25 Jul 2025Source
- Withdrawal Update Form 1FORM 1 01-07-24.pdf · uploaded 1 Sep 2025Source
- Withdrawal Update Form 2FORM 2_30th june 2025.pdf · uploaded 1 Sep 2025Source
- Withdrawal Update Form 3FORM 3_30th June 2025_compressed (1).pdf · uploaded 1 Sep 2025Source
- Form 5 (FY 2024-2025)Form 5 signed.pdf · uploaded 29 Sep 2025Source
- Withdrawal Update Form 1FORM 1 30-09-25 2.pdf · uploaded 29 Oct 2025Source
- Withdrawal Update Form 2FORM 2 30-09-25 2.pdf · uploaded 29 Oct 2025Source
- Withdrawal Update Form 3FORM 3_30th June 2025_compressed (1).pdf · uploaded 29 Oct 2025Source
- Form 2A (FY 2020-2021)form 2a arihant associates 2020-21.pdf · uploaded 10 Nov 2025Source
- Form 2A (FY 2021-2022)form 2a Arihant associates 21-22.pdf · uploaded 10 Nov 2025Source
- Form 2A (FY 2022-2023)form 2a arihant associates 2022-23.pdf · uploaded 10 Nov 2025Source
- Form 2A (FY 2023-2024)Form 2A F.Y 23-24.pdf · uploaded 13 Nov 2025Source
- Form 2A (FY 2024-2025)Form 2A F.Y 24-25.pdf · uploaded 13 Nov 2025Source
- Withdrawal Update Form 1FORM 1 Arihant dec 25.pdf · uploaded 20 Jan 2026Source
- Withdrawal Update Form 2FORM 2 Arihant dec 25.pdf · uploaded 20 Jan 2026Source
- Withdrawal Update Form 3Form 3 Arihant dec 25.pdf · uploaded 20 Jan 2026Source
- Withdrawal Update Form 1FORM 1 31-03-26.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 2Form 2 Arihant march 2026.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 3Form 3 Arihant final.pdf · uploaded 20 Apr 2026Source
- Form 2A (FY 2025-2026)Form 2A 2025-2026 (1).pdf · uploaded 21 Aug 2026Source
- Form 5 (FY 2020-2021)Form 5 2020 2021.pdf · uploaded 21 Aug 2026Source
- Form 5 (FY 2021-2022)FORM 5 2021 2022.pdf · uploaded 21 Aug 2026Source
- Form 5 (FY 2022-2023)FORM 5 2022 2023.pdf · uploaded 21 Aug 2026Source
- Form 5 (FY 2023-2024)FORM 5 2023 2024.pdf · uploaded 21 Aug 2026Source
- Occupational CertificateOCCUPANCY CERTIFICATE ALL MERGED.pdf · uploaded 21 Aug 2026Source
- Occupational CertificateForm 4 Arihant Associates.pdf · uploaded 21 Aug 2026Source
- Occupational CertificateSS OF VERIFICATION EMAIL.pdf · uploaded 21 Aug 2026Source
Technical
- Document1 Scan_0665-01-page-.pdf · uploaded 26 Oct 2020Source
- Document2 Scan_0665-02-page-001.pdf · uploaded 26 Oct 2020Source
- Document3 Scan_0665-04-page-001.pdf · uploaded 26 Oct 2020Source
- Document4 Scan_0665-03-page-001.pdf · uploaded 26 Oct 2020Source
- Document6 Scan_0665-05-page-001.pdf · uploaded 26 Oct 2020Source
- Document6 Scan_0665-060666-01-page-001.pdf · uploaded 26 Oct 2020Source
- DocumentLAYOUT PLAN 1_5.pdf · uploaded 8 Jan 2022Source
- DocumentBUILDING PLAN 2_5.pdf · uploaded 8 Jan 2022Source
- DocumentBUILDING PLAN 3_5.pdf · uploaded 8 Jan 2022Source
- DocumentBUILDING PLAN 4_5.pdf · uploaded 8 Jan 2022Source
- DocumentBUILDING PLAN 5-5.pdf · uploaded 8 Jan 2022Source
- DocumentPLAN-02-09_compressed.pdf · uploaded 28 Apr 2023Source
- DocumentPLAN-03-09_compressed.pdf · uploaded 28 Apr 2023Source
- DocumentPLAN-04-09_compressed.pdf · uploaded 28 Apr 2023Source
- DocumentPLAN-05-09_compressed.pdf · uploaded 28 Apr 2023Source
- DocumentPLAN-06-09_compressed.pdf · uploaded 28 Apr 2023Source
- DocumentPLAN-07-09_compressed.pdf · uploaded 28 Apr 2023Source
- DocumentPLAN-08-09_compressed.pdf · uploaded 28 Apr 2023Source
- DocumentPLAN-09-09_compressed.pdf · uploaded 28 Apr 2023Source
- Other – TechnicalCC Validation Mail (1).pdf · uploaded 7 Dec 2024Source
- DocumentHilighted Layout Plan Arihant.pdf · uploaded 27 Sep 2025Source
- Documentlayout_compressed.pdf · uploaded 4 Nov 2025Source
- DocumentF1 wing plan pg no 2.pdf · uploaded 19 Nov 2025Source
- DocumentF1 wing plan-pg no 3.pdf · uploaded 19 Nov 2025Source
- DocumentF2 wing plan pg no 4.pdf · uploaded 19 Nov 2025Source
- DocumentF2 wing plan pg no 5.pdf · uploaded 19 Nov 2025Source
- DocumentG1 wing plan pg no 6.pdf · uploaded 19 Nov 2025Source
- DocumentG1 wing plan pg no 7.pdf · uploaded 19 Nov 2025Source
- DocumentG2 wing plan-pg no 8.pdf · uploaded 19 Nov 2025Source
- DocumentG2 wing plan-pg no 9.pdf · uploaded 19 Nov 2025Source
- DocumentDP LAYOUT 26-09-25.pdf · uploaded 26 Mar 2026Source
- DocumentPLAN-02-02 26-09-25.pdf · uploaded 26 Mar 2026Source
Technical (Architect)
- DocumentForm 1 30-09-24.pdf · uploaded 18 Oct 2024Source
- DocumentForm 1 30-09-24 (2).pdf · uploaded 19 Oct 2024Source
- DocumentForm 1 30-09-24 arihant.pdf · uploaded 22 Oct 2024Source
- DocumentFORM 1 31-12-24.pdf · uploaded 20 Jan 2025Source
- DocumentFORM 1 31-03-25.pdf · uploaded 18 Apr 2025Source
- DocumentFORM 1 31-03-26.pdf · uploaded 16 Apr 2026Source
Technical (Engineer)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Vadgaonsheri
Survey, CTS, gat or plot numbers
Boundaries
- North
- Srv no 39 1 2 2 part
- South
- Srv no 39 2 1B
- East
- Srv no 39 2 2 39 2 3
- West
- srv no 39 2 1A part
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Jay Aeram | — |
| Chartered accountant | Bhakti Pitale | — |
| Chartered accountant | R V Porwal and Associates | — |
| Engineer | Lokesh Jain | — |
| Engineer | Strudcom consultants pvt. Ltd | — |
Source: MahaRERA project page. Contact details are not shown.