Others · 3 buildings · 515 unitsRERA P52100028378

VTP Sierra Phase1

It is due for completion in Jun 2027, with no extension on record; no MahaRERA orders on record; 91% of its units are booked.

Sus, Pune 411045 · Promoter: Prasanna Developers

DeliveryDue Jun 2027No extension on recordRegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales91% booked471 of 515 units · as the promoter reported to MahaRERA
VTP Sierra Phase1 project report cardPDF: delivery, regulatory orders, people on record, every tower and the registered deals — for your bank or lawyerSee what's inside · from ₹1,499

It is due for completion in Jun 2027, with no extension on record

  • This projectRegistered 22 Feb 2021, completion promised 30 Jun 2027.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales, rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

3 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52100028378
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210002837822 Feb 202130 Jun 202730 Jun 2027Prasanna DevelopersProject page
Documents161

1 document held by Deedo, 160 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardCOMPANY PAN CARD.pdf · uploaded 15 Feb 2021Source

Legal

  • Legal Title reportTITLE SEARCH 1.pdf · uploaded 15 Feb 2021Source
  • Legal Title reportTITLE SEARCH 2.pdf · uploaded 15 Feb 2021Source
  • Declaration Form BForm B VTP Sierra (Notarized).pdf · uploaded 15 Feb 2021Source
  • Otherletter for order.pdf · uploaded 17 Feb 2021Source
  • Otherarbitrator order_compressed.pdf · uploaded 17 Feb 2021Source
  • Otherdevelopment agreement_compressed-1-16.pdf · uploaded 26 Feb 2021Source
Show all 161 documentsShow fewer documents

Legal

  • Legal Title reportFormat A Title Report.pdf · uploaded 24 Nov 2021Source
  • Legal Title reportL.pdf · uploaded 7 Jan 2022Source

Migrated

  • 1 PAN CardCOMPANY PAN CARD.pdf · uploaded 15 Feb 2021Source
  • 1 Copy of the legal title reportTITLE SEARCH 1.pdf · uploaded 15 Feb 2021Source
  • 2 Copy of the legal title reportTITLE SEARCH 2.pdf · uploaded 15 Feb 2021Source
  • 1 Details of encumbrancesEncumbrance (2).pdf · uploaded 15 Feb 2021Source
  • 1 Copy of Layout Approval (in case of layout)proposed layout for phase1.pdf · uploaded 15 Feb 2021Source
  • 1 Building Plan Approval / NA Order for plotted developmentproposed layout for phase1.pdf · uploaded 15 Feb 2021Source
  • 1 Declaration in FORM BForm B VTP Sierra (Notarized).pdf · uploaded 15 Feb 2021Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA certificate phase1.pdf · uploaded 15 Feb 2021Source
  • 1 Proforma of Allotment letterALLOTMENT LETTER VTP SIERRA.pdf · uploaded 15 Feb 2021Source
  • 2 Proforma of Allotment letterVTPSIERRA AOS.pdf · uploaded 15 Feb 2021Source
  • 1 Commencement Certificates / NA Order for plotted developmentNA Order Sus_compressed (1).pdf · uploaded 17 Feb 2021Source
  • 2 Commencement Certificates / NA Order for plotted developmentcc.pdf · uploaded 17 Feb 2021Source
  • 1 Otherletter for order.pdf · uploaded 17 Feb 2021Source
  • 2 Otherarbitrator order_compressed.pdf · uploaded 17 Feb 2021Source
  • 3 Otherdevelopment agreement_compressed-1-16.pdf · uploaded 26 Feb 2021Source
  • 3 Proforma of Allotment letterAOS_compressed (1).pdf · uploaded 30 Mar 2021Source
  • 1 Declaration about Commencement CertificateFORMAT-D-CC Declaration.pdf · uploaded 9 Aug 2021Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Quality Assurance Certificate Phase 1_compressed.pdf · uploaded 10 Aug 2021Source
  • 1 Disclosure of sold/ booked inventorySold-booked inventory - Sierra Ph-1_compressed.pdf · uploaded 10 Aug 2021Source
  • 2 Details of encumbrancesEncumbrance_Sierra.pdf · uploaded 23 Oct 2021Source
  • 2 Disclosure of sold/ booked inventorySierra Phase 1_Signed.pdf · uploaded 26 Oct 2021Source
  • 3 Details of encumbrancesSierra Updated Encumbrance.pdf · uploaded 22 Nov 2021Source
  • 3 Copy of the legal title reportFormat A Title Report.pdf · uploaded 24 Nov 2021Source
  • 4 Details of encumbrancesAddendum.pdf · uploaded 22 Dec 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Prasanna Form 5- Sierra Phase 1.pdf · uploaded 30 Dec 2021Source
  • 4 Copy of the legal title reportL.pdf · uploaded 7 Jan 2022Source
  • 3 Disclosure of sold/ booked inventorySierra 1_compressed.pdf · uploaded 13 Jan 2022Source
  • 1 CERSAI detailsCERSAI_Search_Report.pdf · uploaded 22 Mar 2022Source
  • 4 Disclosure of sold/ booked inventorySierra 1_compressed.pdf · uploaded 11 Apr 2022Source
  • 2 CERSAI detailsSierra 1, 2.pdf · uploaded 14 Apr 2022Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Sierra 1.pdf · uploaded 19 Apr 2022Source
  • 5 Disclosure of sold/ booked inventorySierra 1_compressed.pdf · uploaded 6 Jul 2022Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Sierra Phase 1_compressed.pdf · uploaded 20 Jul 2022Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 - SIERRA PHASE 1.pdf · uploaded 28 Jan 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)FORM 5 Sierra Phase 1 2122.pdf · uploaded 1 Mar 2023Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2_ Sierra Ph-1 (Signed) - 31122021.pdf · uploaded 9 Mar 2023Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 SIERRA 1 31122022.pdf · uploaded 10 Mar 2023Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Sierra Phase 1_compressed.pdf · uploaded 16 Mar 2023Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 SIERRA 1 31122022.pdf · uploaded 24 Mar 2023Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)VTP SIERRA PHASE - 1 FORM 2.pdf · uploaded 25 Mar 2023Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 SIERRA 1 31032022_compressed.pdf · uploaded 28 Mar 2023Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 SIERRA PH 1 28022022_compressed.pdf · uploaded 28 Mar 2023Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 SIERRA PHASE 1 31 12 2022_compressed.pdf · uploaded 28 Mar 2023Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 Sierra 1 31032023.pdf · uploaded 29 Apr 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)FORM 2A SIERRA PH 1 31032022.pdf · uploaded 26 Jul 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)FORM 2A SIERRA PH 1 31032023.pdf · uploaded 26 Jul 2023Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 SIERRA PH 1 30062023.pdf · uploaded 1 Aug 2023Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 SIERRA PHASE 1 31032023_removed_compressed.pdf · uploaded 1 Aug 2023Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 SIERRA PHASE 1 30062023.pdf · uploaded 19 Aug 2023Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 SIERRA PHASE 1 31032023.pdf · uploaded 24 Aug 2023Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)SIERRA PHASE 1 JUNE-23_rotated.pdf · uploaded 24 Aug 2023Source
  • 6 Disclosure of sold/ booked inventorySIERRA PHASE 1 30092022.pdf · uploaded 13 Sep 2023Source
  • 7 Disclosure of sold/ booked inventorySIERRA PHASE 1 31122022.pdf · uploaded 13 Sep 2023Source
  • 8 Disclosure of sold/ booked inventorySIERRA PHASE 1 31032023.pdf · uploaded 13 Sep 2023Source
  • 9 Disclosure of sold/ booked inventorySIERRA PHASE 1 30062023.pdf · uploaded 13 Sep 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)FORM 5 SIERRA PHASE 1 2022-23.pdf · uploaded 26 Sep 2023Source
  • 5 Details of encumbrancesSierra 1 - FE.pdf · uploaded 17 Oct 2023Source
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 SIERRA PHASE 1 30092023.pdf · uploaded 19 Oct 2023Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 SIERRA PHASE 1 30092023.pdf · uploaded 20 Oct 2023Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 SIERRA PHASE 1 30092023.pdf · uploaded 30 Oct 2023Source
  • 10 Disclosure of sold/ booked inventoryINVENTORY SIERRA PHASE 1 30092023.pdf · uploaded 30 Oct 2023Source
  • 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 SIERRA PHASE 1 31122023.pdf · uploaded 22 Jan 2024Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 SIERRA PHASE 1 31122023.pdf · uploaded 22 Jan 2024Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 SIERRA PHASE 1 31122023.pdf · uploaded 5 Feb 2024Source
  • 11 Disclosure of sold/ booked inventoryINVENTORY SIERRA PHASE 1 31122023.pdf · uploaded 8 Mar 2024Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 SIERRA PHASE 1 31032022.pdf · uploaded 22 Mar 2024Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 SIERRA PHASE 1 30092022.pdf · uploaded 22 Mar 2024Source
  • 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 SIERRA PHASE 1 31032022.pdf · uploaded 22 Mar 2024Source
  • 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 SIERRA PHASE 1 30062022.pdf · uploaded 22 Mar 2024Source
  • 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 SIERRA PHASE 1 30092022.pdf · uploaded 22 Mar 2024Source
  • 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 SIERRA PHASE 1 31032024.pdf · uploaded 4 Apr 2024Source
  • 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 SIERRA PHASE 1 31032024.pdf · uploaded 27 Apr 2024Source
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 SIERRA PHASE 1 31032024.pdf · uploaded 30 Apr 2024Source
  • 12 Disclosure of sold/ booked inventoryINVENTORY SIERRA PHASE 1 31032024.pdf · uploaded 8 May 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2A SIERRA PHASE 1 31032024.pdf · uploaded 16 May 2024Source
  • 2 Copy of Layout Approval (in case of layout)SIERRA PHASE 1_Layout_highlighted_compressed.pdf · uploaded 5 Jul 2024Source
  • 2 Building Plan Approval / NA Order for plotted development15_54Tower11st to 26 floor plan.pdf · uploaded 5 Jul 2024Source
  • 3 Building Plan Approval / NA Order for plotted development14_54_Tower_1_GR_Mezz.pdf · uploaded 5 Jul 2024Source
  • 4 Building Plan Approval / NA Order for plotted development23_54_Tower_4_.pdf · uploaded 5 Jul 2024Source
  • 5 Building Plan Approval / NA Order for plotted development24_54_Tower_4_.pdf · uploaded 5 Jul 2024Source
  • 6 Building Plan Approval / NA Order for plotted development30_54_Tower_6_.pdf · uploaded 5 Jul 2024Source
  • 7 Building Plan Approval / NA Order for plotted development31_54_Tower_6_.pdf · uploaded 5 Jul 2024Source
  • 3 Commencement Certificates / NA Order for plotted developmentCC_.pdf · uploaded 5 Jul 2024Source
  • 2 Declaration about Commencement CertificateDeclaration_CC_Vtp_Sierra_Phase_1.pdf · uploaded 5 Jul 2024Source
  • 13 Disclosure of sold/ booked inventorySIERRA PHASE 1 30062024.pdf · uploaded 6 Jul 2024Source
  • 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)Sierra Phase 1_Form 3_Jun24_compressed-compressed.pdf · uploaded 22 Jul 2024Source
  • 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 SIERRA PH 1 30062024.pdf · uploaded 27 Jul 2024Source
  • 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 SIERRA PH 1 10072024.pdf · uploaded 27 Jul 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)FORM 5 - SIERRAPHASE1.pdf · uploaded 7 Oct 2024Source
  • 2 Disclosure of sold/ booked inventorySIERRA PH1.pdf · uploaded 14 Oct 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 SIERRA PHASE 1 30092024.pdf · uploaded 16 Oct 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 SIERRA PHASE 1 30092024.pdf · uploaded 16 Oct 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 SIERRA PHASE 1 30092024.pdf · uploaded 16 Oct 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 SIERRA PHASE 1 10102024.pdf · uploaded 18 Oct 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 SIERRA PHASE 1 10102024.pdf · uploaded 18 Oct 2024Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)VTP Sierra Phase 1_Form 3_Sep24_11zon.pdf · uploaded 26 Oct 2024Source
  • 1 Declaration about all RERA Designated Bank Accounts (Format A)Format A- sierra Phase 1.pdf · uploaded 26 Oct 2024Source
  • 2 Declaration about all RERA Designated Bank Accounts (Format A)DECLARATION SIERRA PHASE 1_rotated (1).pdf · uploaded 26 Oct 2024Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_Vtp sierra phase1_08102024.pdf · uploaded 28 Oct 2024Source
  • 3 Disclosure of sold/ booked inventoryrevised inventory sierra phase 1.pdf · uploaded 28 Oct 2024Source
  • 3 Declaration about all RERA Designated Bank Accounts (Format A)FORMAT A SIERRA PHASE 1.pdf · uploaded 28 Oct 2024Source
  • 4 Declaration about all RERA Designated Bank Accounts (Format A)1 Declaration-cum-undertaking for change of bank account (Annexure A).pdf · uploaded 28 Oct 2024Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 SIERRA PHASE 1REVISED.pdf · uploaded 5 Dec 2024Source
  • 4 Disclosure of sold/ booked inventoryInventory sierra phase 1_30092024 revised.pdf · uploaded 5 Dec 2024Source
  • 1 Disclosure of sold/ booked inventorySIERRA PHASE 1 31122024.pdf · uploaded 14 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 SIERRA PHASE 1 31122024.pdf · uploaded 20 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 SIEERA PHASE 1 31122024.pdf · uploaded 20 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 SIERRA PHASE 1 31122024.pdf · uploaded 29 Jan 2025Source
  • 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)Bank Letter VTP Sierra Ph 1.pdf · uploaded 17 Mar 2025Source
  • 1 Disclosure of sold/ booked inventorySIERRA PH1 31032025.pdf · uploaded 7 Apr 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Sierra Phase 1.pdf · uploaded 19 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Sierra Phase 1.pdf · uploaded 19 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Sierra Phase 1.pdf · uploaded 19 Apr 2025Source
  • Form 1Form 1 Sierra Phase 1.pdf · uploaded 22 May 2025Source
  • Form 2Form 2 Sierra Phase 1.pdf · uploaded 22 May 2025Source
  • Form 3Form 3 Sierra Phase 1.pdf · uploaded 22 May 2025Source
  • Disclosure of Sold and Booked InventorySIERRA PH1 31032025.pdf · uploaded 22 May 2025Source
  • Form 2A (FY 2024-2025)FORM 2A SIEERA PHASE 1.pdf · uploaded 24 Jun 2025Source
  • Form 5 (FY 2024-2025)FORM 5 SIERRA PHASE 1.pdf · uploaded 22 Sep 2025Source
  • Withdrawal Update Form 1FORM 1 SIERRA PHASE 1.pdf · uploaded 17 Oct 2025Source
  • Withdrawal Update Form 2FORM 2 Sierra Phase 1 30092025.pdf · uploaded 17 Oct 2025Source
  • Withdrawal Update Form 3FORM 3 SIERRA PHASE 1_compressed.pdf · uploaded 17 Oct 2025Source
  • Withdrawal Update Form 1FORM-1 SIERRA PHASE 1 31122025.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 2FORM-2 SIERRA PHASE 1.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 3form 3 phase 1_11zon.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 1FORM-1 SIERRA PHASE 1.pdf · uploaded 20 Apr 2026Source
  • Withdrawal Update Form 2VTP SIERRA_RERA FORM-2 SIERRA PHASE 1.pdf · uploaded 20 Apr 2026Source
  • Withdrawal Update Form 3FORM-3 SIERRA PHASE 1.pdf · uploaded 20 Apr 2026Source
  • Form 2A (FY 2025-2026)VTP SIERRA PHASE 1.pdf · uploaded 18 Jun 2026Source
  • Withdrawal Update Form 1FORM-1 SIERRA PHASE 1.pdf · uploaded 20 Jul 2026Source
  • Withdrawal Update Form 2Form 2 Signed - VTP Sierra Ph1.pdf · uploaded 20 Jul 2026Source
  • Withdrawal Update Form 3FORM-3 SIEERA PHASE 1.pdf · uploaded 20 Jul 2026Source
  • Form 5 (FY 2025-2026)Form 5_Prasanna Developers Sierra Ph 1.pdf · uploaded 24 Sep 2026Source

Technical

  • Documentproposed layout for phase1.pdf · uploaded 15 Feb 2021Source
  • Documentproposed layout for phase1.pdf · uploaded 15 Feb 2021Source
  • DocumentSIERRA PHASE 1_Layout_highlighted_compressed.pdf · uploaded 5 Jul 2024Source
  • Document15_54Tower11st to 26 floor plan.pdf · uploaded 5 Jul 2024Source
  • Document14_54_Tower_1_GR_Mezz.pdf · uploaded 5 Jul 2024Source
  • Document23_54_Tower_4_.pdf · uploaded 5 Jul 2024Source
  • Document24_54_Tower_4_.pdf · uploaded 5 Jul 2024Source
  • Document30_54_Tower_6_.pdf · uploaded 5 Jul 2024Source
  • Document31_54_Tower_6_.pdf · uploaded 5 Jul 2024Source

Technical (Architect)

  • DocumentFORM 1 SIERRA PHASE 1 30092024.pdf · uploaded 16 Oct 2024Source
  • DocumentFORM 1 SIERRA PHASE 1 31122024.pdf · uploaded 20 Jan 2025Source
  • DocumentForm 1 Sierra Phase 1.pdf · uploaded 19 Apr 2025Source
  • DocumentFORM-1 SIERRA PHASE 1.pdf · uploaded 20 Jul 2026Source

Technical (Engineer)

  • DocumentFORM 2 SIERRA PHASE 1 10102024.pdf · uploaded 18 Oct 2024Source
  • DocumentFORM 2 SIERRA PHASE 1 10102024.pdf · uploaded 18 Oct 2024Source
  • DocumentFORM 2 SIERRA PHASE 1 31122024.pdf · uploaded 29 Jan 2025Source
  • DocumentForm 2 Sierra Phase 1.pdf · uploaded 19 Apr 2025Source
  • DocumentForm 2 Signed - VTP Sierra Ph1.pdf · uploaded 20 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvals43 1, 44 1

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Unit types
2BHK, Shop, 3BHK515 units in all
Address
S.No.4 part, 43 1, 44 1, 44 2, 45 1, 45 2, 46 1, 46 2, Baner Sus Road, SusPIN 411045
Village
Sus, Mulshi taluka
Designated bank account
85
Developed in phases
Yes

Survey, CTS, gat or plot numbers

43 144 144 245 145 246 146 2S.No.4 part

Boundaries

North
Compound wall
South
9 m wide Road
East
part of same layout
West
30m wide road

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking515 units

471 of 515 units booked (91%), as the promoter reported to MahaRERA

2BHK · 378 unitsShop · 7 units3BHK · 130 units
BuildingTypeCarpet areaUnitsBooked
Tower 12BHK53.09 sq m · 571 sq ft10097
Tower 12BHK57.46 sq m · 618 sq ft5251
Tower 12BHK61.84 sq m · 666 sq ft5252
Tower 1Shop33.93 sq m · 365 sq ft10
Tower 1Shop84.61 sq m · 911 sq ft10
Tower 1Shop99.33 sq m · 1,069 sq ft10
Tower 1Shop103.69 sq m · 1,116 sq ft10
Tower 1Shop107.85 sq m · 1,161 sq ft10
Show all 17 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
Tower 1Shop109.08 sq m · 1,174 sq ft10
Tower 1Shop110.54 sq m · 1,190 sq ft10
Tower42BHK61.11 sq m · 658 sq ft4845
Tower42BHK64.95 sq m · 699 sq ft2626
Tower43BHK83.43 sq m · 898 sq ft2626
Tower43BHK91.31 sq m · 983 sq ft5251
Tower 62BHK64.95 sq m · 699 sq ft4839
Tower 62BHK70.06 sq m · 754 sq ft5242
Tower 63BHK101.03 sq m · 1,087 sq ft5242

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals1

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
EngineerVinayak Boga—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology