Others · 2 buildings · 361 unitsRERA P52100029394

Vtp Sierra Phase-2

Deedo IDDP-PUN-8E7X

Completion was pushed back 4 months, to Apr 2027; no MahaRERA orders on record; 98% of its units are booked.

Sus, Pune 411021 · Promoter: Prasanna Developers

DeliveryExtended 4 moPromised Dec 2026 · now due Apr 2027RegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales98% booked353 of 361 units · as the promoter reported to MahaRERA
Vtp Sierra Phase-2 project report cardPDF: delivery, regulatory orders, people on record, every tower and the registered deals — for your bank or lawyerSee what's inside · from ₹1,499

Completion was pushed back 4 months, to Apr 2027

  • This projectRegistered 29 May 2021, completion promised 31 Dec 2026, revised to 30 Apr 2027.

1 extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales, rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

2 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52100029394
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210002939429 May 202131 Dec 202630 Apr 2027Prasanna DevelopersProject page
Documents155

2 documents held by Deedo, 153 filings listed on MahaRERA's project page

Extension certificate

Registration certificate

Finance

  • PAN CardCOMPANY PAN CARD.pdf · uploaded 24 Apr 2021Source

Legal

  • Otherletter.pdf · uploaded 24 Apr 2021Source
  • Otherarbitration deed.pdf · uploaded 24 Apr 2021Source
  • Otherarbitration deed1.pdf · uploaded 24 Apr 2021Source
  • Declaration Form BFORMB.pdf · uploaded 24 Apr 2021Source
  • Legal Title reportLegal report in format.pdf · uploaded 17 May 2021Source
Show all 155 documentsShow fewer documents

Legal

  • Legal Title reportAddendum.pdf · uploaded 22 Dec 2021Source
  • Legal Title reportL.pdf · uploaded 7 Jan 2022Source

Migrated

  • 1 PAN CardCOMPANY PAN CARD.pdf · uploaded 24 Apr 2021Source
  • 1 Details of encumbrancesENCUMBRANCE.pdf · uploaded 24 Apr 2021Source
  • 1 Copy of Layout Approval (in case of layout)layout plan1.pdf · uploaded 24 Apr 2021Source
  • 1 Building Plan Approval / NA Order for plotted developmentlayout plan1.pdf · uploaded 24 Apr 2021Source
  • 1 Commencement Certificates / NA Order for plotted developmentccc.pdf · uploaded 24 Apr 2021Source
  • 1 Declaration in FORM BFORMB.pdf · uploaded 24 Apr 2021Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form3.pdf · uploaded 24 Apr 2021Source
  • 1 Proforma of Allotment letteraos.pdf · uploaded 24 Apr 2021Source
  • 2 Proforma of Allotment letterALLOTMENT LETTER VTP SIERRA 2.pdf · uploaded 24 Apr 2021Source
  • 1 Otherletter.pdf · uploaded 24 Apr 2021Source
  • 2 Otherarbitration deed.pdf · uploaded 24 Apr 2021Source
  • 3 Otherarbitration deed1.pdf · uploaded 24 Apr 2021Source
  • 1 Copy of the legal title reportLegal report in format.pdf · uploaded 17 May 2021Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Quality Assurance Certificate Phase 2_compressed.pdf · uploaded 10 Aug 2021Source
  • 1 Disclosure of sold/ booked inventorySold-booked inventory - Sierra Ph-2_compressed.pdf · uploaded 10 Aug 2021Source
  • 2 Details of encumbrancesEncumbrance_Sierra.pdf · uploaded 23 Oct 2021Source
  • 2 Disclosure of sold/ booked inventorySierra Phase 2_Signed.pdf · uploaded 26 Oct 2021Source
  • 1 Declaration about Commencement CertificateVTP_SIERRA.pdf · uploaded 16 Nov 2021Source
  • 3 Details of encumbrancesSierra Updated Encumbrance.pdf · uploaded 22 Nov 2021Source
  • 2 Copy of the legal title reportAddendum.pdf · uploaded 22 Dec 2021Source
  • 3 Copy of the legal title reportL.pdf · uploaded 7 Jan 2022Source
  • 3 Disclosure of sold/ booked inventorySierra 2.pdf · uploaded 13 Jan 2022Source
  • 1 CERSAI detailsCERSAI_Search_Report.pdf · uploaded 22 Mar 2022Source
  • 4 Disclosure of sold/ booked inventorySierra 2.pdf · uploaded 11 Apr 2022Source
  • 2 CERSAI detailsSierra 1, 2.pdf · uploaded 14 Apr 2022Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Sierra 2.pdf · uploaded 19 Apr 2022Source
  • 5 Disclosure of sold/ booked inventorySierra 2_compressed.pdf · uploaded 6 Jul 2022Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Sierra Phase 2_compressed.pdf · uploaded 20 Jul 2022Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 - SIERRA PHASE 2.pdf · uploaded 28 Jan 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)FORM 5 Sierra Phase 2 2122.pdf · uploaded 1 Mar 2023Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2_ Sierra Ph-2 (Signed) - 31122021.pdf · uploaded 9 Mar 2023Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 SIERRA 2 31122022.pdf · uploaded 10 Mar 2023Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Sierra Phase 2_compressed.pdf · uploaded 16 Mar 2023Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 SIERRA 2 31122022.pdf · uploaded 24 Mar 2023Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)VTP SIERRA PHASE - 2 FORM 2.pdf · uploaded 25 Mar 2023Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 SIERRA 2 31032022.pdf · uploaded 28 Mar 2023Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 SIERRA PHASE 2 31 12 2022_compressed.pdf · uploaded 28 Mar 2023Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 SIERRA PHASE 2 28022022_compressed.pdf · uploaded 28 Mar 2023Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 SIERRA PHASE 2 31 12 2022_compressed (1).pdf · uploaded 28 Mar 2023Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 Sierra 2 31032023.pdf · uploaded 29 Apr 2023Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 SIERRA PHASE 2 31032023.pdf · uploaded 29 Apr 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)FORM 2A SIERRA PH 2 31032022.pdf · uploaded 26 Jul 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)FORM 2A SIERRA PH 2 31032023.pdf · uploaded 26 Jul 2023Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 SIERRA PH 2 30062023.pdf · uploaded 1 Aug 2023Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 SIERRA 2 31032023_removed_compressed.pdf · uploaded 1 Aug 2023Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 SIERRA PHASE 2 30062023_compressed.pdf · uploaded 19 Aug 2023Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 SIERRA PHASE 2 31032023.pdf · uploaded 24 Aug 2023Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)SIERRA PHASE -2 JUNE-23_rotated.pdf · uploaded 24 Aug 2023Source
  • 6 Disclosure of sold/ booked inventorySIERRA PHASE 2 30092022.pdf · uploaded 13 Sep 2023Source
  • 7 Disclosure of sold/ booked inventorySIERRA PHASE 2 31122022.pdf · uploaded 13 Sep 2023Source
  • 8 Disclosure of sold/ booked inventorySIERRA PHASE 2 31032023.pdf · uploaded 13 Sep 2023Source
  • 9 Disclosure of sold/ booked inventorySIERRA PHASE 2 30062023.pdf · uploaded 13 Sep 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)FORM 5 SIERRA PHASE 2 2022-23.pdf · uploaded 26 Sep 2023Source
  • 4 Details of encumbrancesSierra 2 - FE.pdf · uploaded 17 Oct 2023Source
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 SIERRA PHASE 2 30092023.pdf · uploaded 19 Oct 2023Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 SIERRA PHASE 2 30092023.pdf · uploaded 20 Oct 2023Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 SIERRA PHASE 2 30092023.pdf · uploaded 30 Oct 2023Source
  • 10 Disclosure of sold/ booked inventoryINVENTORY SIERRA PHASE 2 30092023.pdf · uploaded 30 Oct 2023Source
  • 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 SIERRA PHASE 2 30112023.pdf · uploaded 22 Jan 2024Source
  • 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 SIERRA PHASE 2 31122023.pdf · uploaded 22 Jan 2024Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 SIERRA PHASE 2 30112023.pdf · uploaded 22 Jan 2024Source
  • 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 SIERRA PHASE 2 30112023.pdf · uploaded 22 Jan 2024Source
  • 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 SIERRA PHASE 2 31122023.pdf · uploaded 22 Jan 2024Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 SIERRA PHASE 2 31122023.pdf · uploaded 5 Feb 2024Source
  • 11 Disclosure of sold/ booked inventoryINVENTORY - SIERRA PHASE 2 31122023.pdf · uploaded 8 Mar 2024Source
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 SIERRA PHASE 2 30092022.pdf · uploaded 22 Mar 2024Source
  • 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 SIERRA PHASE 2 31032022.pdf · uploaded 22 Mar 2024Source
  • 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 SIERRA PHASE 2 30062022.pdf · uploaded 22 Mar 2024Source
  • 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 SIERRA PHASE 2 30092022.pdf · uploaded 22 Mar 2024Source
  • 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 SIERRA PHASE 2 31032024.pdf · uploaded 4 Apr 2024Source
  • 14 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 SIERRA PHASE 2 31032024.pdf · uploaded 27 Apr 2024Source
  • 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 SIERRA PHASE 2 31032024.pdf · uploaded 30 Apr 2024Source
  • 12 Disclosure of sold/ booked inventoryINVENTORY SIERRA PHASE 2 31032024.pdf · uploaded 8 May 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2A SIERRA PHASE 2 31032024.pdf · uploaded 16 May 2024Source
  • 2 Copy of Layout Approval (in case of layout)sierra phase 2_layout-highlighted_compressed.pdf · uploaded 5 Jul 2024Source
  • 2 Building Plan Approval / NA Order for plotted development17_54_Tower_2_.pdf · uploaded 5 Jul 2024Source
  • 3 Building Plan Approval / NA Order for plotted development18_54_Tower_2.pdf · uploaded 5 Jul 2024Source
  • 4 Building Plan Approval / NA Order for plotted development20_54_Tower_3.pdf · uploaded 5 Jul 2024Source
  • 5 Building Plan Approval / NA Order for plotted development21_54_Tower_3.pdf · uploaded 5 Jul 2024Source
  • 2 Commencement Certificates / NA Order for plotted developmentCC_.pdf · uploaded 5 Jul 2024Source
  • 2 Declaration about Commencement CertificateDeclaration_CC_Vtp_Sierra_Phase_2_.pdf · uploaded 5 Jul 2024Source
  • 13 Disclosure of sold/ booked inventorySIERRA PHASE 2 30062024.pdf · uploaded 6 Jul 2024Source
  • 15 CA Certificate on Project Cost & Fund withdrawal (Form 3)Sierra Phase 2_Form 3_Jun24_compressed.pdf · uploaded 22 Jul 2024Source
  • 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 SIERRA PH 2 30062024.pdf · uploaded 27 Jul 2024Source
  • 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 SIERRA PH 2 10072024.pdf · uploaded 27 Jul 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)FORM 5 - SIERRAPHASE2.pdf · uploaded 7 Oct 2024Source
  • 2 Disclosure of sold/ booked inventorySIERRA PH2.pdf · uploaded 14 Oct 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 SIERRA PH 2 3092024.pdf · uploaded 16 Oct 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 SIERRA PHASE 1 30092024.pdf · uploaded 16 Oct 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 SIERRA PHASE 2 30092024.pdf · uploaded 16 Oct 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 SIERRA PHASE 2 10102024.pdf · uploaded 18 Oct 2024Source
  • 1 Declaration about all RERA Designated Bank Accounts (Format A)Format A- sierra Phase 2 (2).pdf · uploaded 26 Oct 2024Source
  • 2 Declaration about all RERA Designated Bank Accounts (Format A)Declaration Annexure A VTP Sierra Phase 2_.pdf · uploaded 26 Oct 2024Source
  • 3 Declaration about all RERA Designated Bank Accounts (Format A)FORMAT A SIERRA PHASE 2.pdf · uploaded 28 Oct 2024Source
  • 4 Declaration about all RERA Designated Bank Accounts (Format A)ANNEXURE A DECLARATION CUM UNDERTAKING SIERRA PHASE 2.pdf · uploaded 28 Oct 2024Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 SIERRA PHASE 2 REVISED.pdf · uploaded 5 Dec 2024Source
  • 3 Disclosure of sold/ booked inventoryInventory sierra phase 2_30092024 revised.pdf · uploaded 5 Dec 2024Source
  • 1 Disclosure of sold/ booked inventorySIERRA PHASE 2 31122024.pdf · uploaded 14 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 SIERRA PHASE 2 31122024.pdf · uploaded 20 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 VTP SIERRA PHASE 2 31122024.pdf · uploaded 20 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 SIERRA PHASE 2 31122024.pdf · uploaded 29 Jan 2025Source
  • 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)FORMAT B- SIERRA PHASE 2.pdf · uploaded 14 Feb 2025Source
  • 1 Disclosure of sold/ booked inventorySIERRA PH2 31032025.pdf · uploaded 7 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Sierra Phase 2.pdf · uploaded 19 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Sierra Phase 2.pdf · uploaded 19 Apr 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Sierra Phase 2.pdf · uploaded 21 Apr 2025Source
  • Form 1Form 1 Sierra Ph II 31032025.pdf · uploaded 22 May 2025Source
  • Form 2Form 2 Sierra Phase 2.pdf · uploaded 22 May 2025Source
  • Form 3Form 3 Sierra Phase 2.pdf · uploaded 22 May 2025Source
  • Disclosure of Sold and Booked InventorySIERRA PH2 31032025.pdf · uploaded 22 May 2025Source
  • Form 2A (FY 2024-2025)FORM 2A SIEERA PHASE 2.pdf · uploaded 24 Jun 2025Source
  • Form 5 (FY 2024-2025)FORM 5 SIERRA PHASE 2.pdf · uploaded 22 Sep 2025Source
  • Withdrawal Update Form 1FORM 1 SIERRA PHASE 2.pdf · uploaded 17 Oct 2025Source
  • Withdrawal Update Form 2FORM 2 SIERRA PH 2 10072024.pdf · uploaded 17 Oct 2025Source
  • Withdrawal Update Form 3FORM 3 SIERRA PHASE 2_compressed.pdf · uploaded 17 Oct 2025Source
  • Withdrawal Update Form 1FORM-1 SIERRA PHASE 2 31122025.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 2FORM-2 SIERRA PHASE 2.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 3form 3 phase 2_11zon.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 1FORM-1 SIERRA PHASE 2.pdf · uploaded 20 Apr 2026Source
  • Withdrawal Update Form 2VTP SIERRA_RERA FORM-2 SIERRA PHASE 2.pdf · uploaded 20 Apr 2026Source
  • Withdrawal Update Form 3FORM-3 SIERRA PHASE 2.pdf · uploaded 20 Apr 2026Source
  • Form 2A (FY 2025-2026)VTP SIERRA PHASE 2.pdf · uploaded 18 Jun 2026Source
  • Withdrawal Update Form 1FORM-1 SIERRA PHASE 2.pdf · uploaded 20 Jul 2026Source
  • Withdrawal Update Form 2Form 2 Signed - VTP Sierra Ph2.pdf · uploaded 20 Jul 2026Source
  • Withdrawal Update Form 3FORM 3 - SIERRA PHASE 2.pdf · uploaded 20 Jul 2026Source
  • Form 5 (FY 2025-2026)Form 5_Prasanna Developers sierra phase 2.pdf · uploaded 24 Sep 2026Source

Technical

  • Documentlayout plan1.pdf · uploaded 24 Apr 2021Source
  • Documentlayout plan1.pdf · uploaded 24 Apr 2021Source
  • Documentsierra phase 2_layout-highlighted_compressed.pdf · uploaded 5 Jul 2024Source
  • Document17_54_Tower_2_.pdf · uploaded 5 Jul 2024Source
  • Document18_54_Tower_2.pdf · uploaded 5 Jul 2024Source
  • Document20_54_Tower_3.pdf · uploaded 5 Jul 2024Source
  • Document21_54_Tower_3.pdf · uploaded 5 Jul 2024Source
  • Others17 54.pdf · uploaded 15 Apr 2026Source
  • Others18 54.pdf · uploaded 15 Apr 2026Source
  • Others20 54.pdf · uploaded 15 Apr 2026Source
  • Others21 54.pdf · uploaded 15 Apr 2026Source

Technical (Architect)

  • DocumentFORM 1 SIERRA PH 2 3092024.pdf · uploaded 16 Oct 2024Source
  • DocumentFORM 1 SIERRA PHASE 2 31122024.pdf · uploaded 20 Jan 2025Source
  • DocumentForm 1 Sierra Phase 2.pdf · uploaded 21 Apr 2025Source
  • DocumentFORM-1 SIERRA PHASE 2.pdf · uploaded 20 Jul 2026Source

Technical (Engineer)

  • DocumentFORM 2 SIERRA PHASE 2 10102024.pdf · uploaded 18 Oct 2024Source
  • DocumentFORM 2 SIERRA PHASE 2 31122024.pdf · uploaded 29 Jan 2025Source
  • DocumentForm 2 Sierra Phase 2.pdf · uploaded 19 Apr 2025Source
  • DocumentForm 2 Signed - VTP Sierra Ph2.pdf · uploaded 20 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvals43/1, 44/1

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Unit types
2BHK, 3BHK, Shop361 units in all
Address
S. NO. 4 (PART), 43/1, 44/1, 44/2, 45/1, 45/2, 46/1, 46/2, 7 (PART), Baner sus road, SusPIN 411021
Village
Sus, Mulshi taluka
Designated bank account
85
Developed in phases
Yes

Survey, CTS, gat or plot numbers

43/144/144/245/145/246/146/27 (PART)S. NO. 4 (PART)

Boundaries

North
Drive way and Tower 4
South
Tower 1
East
Drive way and podium open space
West
Drive way and 30m wide road

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking361 units

353 of 361 units booked (98%), as the promoter reported to MahaRERA

2BHK · 252 units3BHK · 104 unitsShop · 5 units
BuildingTypeCarpet areaUnitsBooked
Tower 22BHK53.09 sq m · 571 sq ft4848
Tower 22BHK57.46 sq m · 618 sq ft5252
Tower 22BHK57.83 sq m · 622 sq ft5249
Tower 23BHK75 sq m · 807 sq ft5252
Tower 2Shop79.18 sq m · 852 sq ft10
Tower 2Shop83.41 sq m · 898 sq ft10
Tower 2Shop161.6 sq m · 1,739 sq ft10
Tower 2Shop172.4 sq m · 1,856 sq ft11
Show all 12 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
Tower 2Shop202.3 sq m · 2,178 sq ft11
Tower 32BHK65.32 sq m · 703 sq ft4847
Tower 32BHK69.7 sq m · 750 sq ft5252
Tower 33BHK84.64 sq m · 911 sq ft5251

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals48

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectVk Arch—
Chartered accountantSPAK & Co—
EngineerMukesh Jadhav—
EngineerVinayak Boga—
Registered real estate agent360 Realtors LLP—
Registered real estate agentANAROCK Property Consultants Pvt. Ltd.—
Registered real estate agentAshish Shrikrishna Khamkar—
Registered real estate agentBasil Realty & Infra Solution LLP—
Show all 48 professionalsShow fewer professionals
RoleNameRegistration no.
Registered real estate agentBharatkumar Ashokrao Taur—
Registered real estate agentBharat Shankar Tawar proprietor of Sai real estate solution—
Registered real estate agentBig Deal Properties (India) Pvt. Ltd—
Registered real estate agentBrickfolio Solutions Private Limited—
Registered real estate agentBullmen Realty India Private Limited—
Registered real estate agentChasing Spaces Private Limited—
Registered real estate agentClearspace Prop-Tech India Private Limited—
Registered real estate agentDgcon Consulting Services Private Limited—
Registered real estate agentFirstdoor Realty LLP—
Registered real estate agentFirstkey Realtors Private Limited—
Registered real estate agentHiren Natvarlal Trivedi—
Registered real estate agentHomesfy Realty Limited—
Registered real estate agentInvestoxpert Advisors Private Limited—
Registered real estate agentKamaal Khan—
Registered real estate agentKey Mansions Private Limited—
Registered real estate agentKingsFort Developers Private Limited—
Registered real estate agentKprbsk Realtors Private Limited—
Registered real estate agentKrishna Kumar Panday—
Registered real estate agentKumra & Bindal Consultants Private Limited—
Registered real estate agentLivnest Technologies Private Limited—
Registered real estate agentMagicstone Spaces LLP—
Registered real estate agentParesh Sureshrao Mamidwar—
Registered real estate agentPearlquest Associates Pvt Ltd—
Registered real estate agentProIndia Realty Private Limited—
Registered real estate agentPropBiz Advisors Private Limited—
Registered real estate agentPropengine Realtech Private Limited—
Registered real estate agentProperty Chef Consulting Services—
Registered real estate agentPropertypistol Realty Private Limited—
Registered real estate agentPropnivesh Private Limited—
Registered real estate agentRahri Services Pvt Ltd—
Registered real estate agentRahul Kumar Singh—
Registered real estate agentRealty Assistant Private Limited—
Registered real estate agentRockwellroyal Homes Private Limited—
Registered real estate agentSantosh Pande—
Registered real estate agentSauraj Tiwari—
Registered real estate agentShailesh Prakash Deshmukh—
Registered real estate agentSmc Real Estate Advisors Private Limited—
Registered real estate agentSpacewalk Advisors LLP—
Registered real estate agentSquare Yards Consulting Private Limited—
Registered real estate agentWillow Stone Realty Private Limited—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology