Commercial · 1 building · 65 unitsRERA P52100031682

Eagle Era

Deedo IDDP-PUN-QWWD

It is due for completion in Dec 2026, with no extension on record; no MahaRERA orders on record; 46% of its units are booked.

Sus, Pune 411021 · Promoter: Eagle Realities

DeliveryDue Dec 2026No extension on recordRegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales46% booked30 of 65 units · as the promoter reported to MahaRERA
Eagle Era project report cardPDF: delivery, regulatory orders, people on record, every tower and the registered deals — for your bank or lawyerSee what's inside · from ₹1,499

It is due for completion in Dec 2026, with no extension on record

  • This projectRegistered 3 Nov 2021, completion promised 31 Dec 2026.

1 extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales, rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

The building

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52100031682
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P521000316823 Nov 202131 Dec 202631 Dec 2026Eagle RealitiesProject page
Documents149

2 documents held by Deedo, 147 filings listed on MahaRERA's project page

Extension certificate

Registration certificate

Finance

  • PAN CardPAN Card.pdf · uploaded 20 Oct 2021Source

Legal

  • Declaration Form BAffidicate cum Delcaration.pdf · uploaded 20 Oct 2021Source
  • Legal Title reportSearch Final.pdf · uploaded 21 Oct 2021Source

Migrated

  • 1 PAN CardPAN Card.pdf · uploaded 20 Oct 2021Source
  • 1 Copy of Layout Approval (in case of layout)MYSCAN_20210921_0001 Rera.pdf · uploaded 20 Oct 2021Source
  • 2 Copy of Layout Approval (in case of layout)MYSCAN_20210921_0002 Rera.pdf · uploaded 20 Oct 2021Source
Show all 149 documentsShow fewer documents

Migrated

  • 1 Building Plan Approval / NA Order for plotted developmentNA Order.pdf · uploaded 20 Oct 2021Source
  • 1 Commencement Certificates / NA Order for plotted developmentCommencment_compressed.pdf · uploaded 20 Oct 2021Source
  • 1 Declaration in FORM BAffidicate cum Delcaration.pdf · uploaded 20 Oct 2021Source
  • 1 Proforma of Allotment letterSale AGREEMENT-Draft.pdf · uploaded 20 Oct 2021Source
  • 1 Copy of the legal title reportSearch Final.pdf · uploaded 21 Oct 2021Source
  • 1 Details of encumbrancesEncumbrance Certificate.pdf · uploaded 21 Oct 2021Source
  • 1 Declaration about Commencement CertificateForm D.pdf · uploaded 21 Oct 2021Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch Certificate_compressed.pdf · uploaded 21 Oct 2021Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engg Certificate_compressed.pdf · uploaded 21 Oct 2021Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Form No 3.pdf · uploaded 21 Oct 2021Source
  • 1 Disclosure of sold/ booked inventorySold book data.pdf · uploaded 1 Sep 2022Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch Certificate_rera_Stage2 10102022.pdf · uploaded 12 Oct 2022Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate (1).pdf · uploaded 12 Oct 2022Source
  • 3 Copy of Layout Approval (in case of layout)Scan_3775-0.pdf · uploaded 10 Nov 2022Source
  • 4 Copy of Layout Approval (in case of layout)Scan_3775.pdf · uploaded 10 Nov 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)FORM 5 2021-22 Eagle.pdf · uploaded 17 Feb 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)architect certificate.pdf · uploaded 7 Nov 2023Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)architect certificate.pdf · uploaded 7 Nov 2023Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate.pdf · uploaded 7 Nov 2023Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate.pdf · uploaded 7 Nov 2023Source
  • 2 Disclosure of sold/ booked inventoryInventory.pdf · uploaded 7 Nov 2023Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3.pdf · uploaded 7 Nov 2023Source
  • 5 Copy of Layout Approval (in case of layout)Eagle Realities_Sus PLAN 01_compressed.pdf · uploaded 10 Nov 2023Source
  • 6 Copy of Layout Approval (in case of layout)Eagle Realities_Sus PLAN 02_compressed.pdf · uploaded 10 Nov 2023Source
  • 7 Copy of Layout Approval (in case of layout)Eagle Realities_Sus PLAN 03_compressed.pdf · uploaded 10 Nov 2023Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3.pdf · uploaded 10 Nov 2023Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)DEC 21.pdf · uploaded 16 Dec 2023Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)30 jun 2022.pdf · uploaded 16 Dec 2023Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)31 december 2022.pdf · uploaded 16 Dec 2023Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)31 march 2023.pdf · uploaded 16 Dec 2023Source
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)31_December2021.pdf · uploaded 16 Dec 2023Source
  • 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)31_march 2022.pdf · uploaded 16 Dec 2023Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)MARCH 22.pdf · uploaded 16 Dec 2023Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)JUNE 22.pdf · uploaded 16 Dec 2023Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)DEC 22.pdf · uploaded 16 Dec 2023Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)SEPT 22.pdf · uploaded 16 Dec 2023Source
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)MARCH 23.pdf · uploaded 16 Dec 2023Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)June 2023.pdf · uploaded 16 Dec 2023Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)March 2023.pdf · uploaded 16 Dec 2023Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)september 2022.pdf · uploaded 16 Dec 2023Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)December 2021.pdf · uploaded 16 Dec 2023Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)March 2022.pdf · uploaded 16 Dec 2023Source
  • 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)June 2022.pdf · uploaded 16 Dec 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)FORM 5 2022-23.pdf · uploaded 5 Jan 2024Source
  • 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect.pdf · uploaded 20 Jan 2024Source
  • 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)Eng.pdf · uploaded 20 Jan 2024Source
  • 3 Disclosure of sold/ booked inventoryInventory.pdf · uploaded 20 Jan 2024Source
  • 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3.pdf · uploaded 20 Jan 2024Source
  • 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCH CERTIFICATE.pdf · uploaded 20 Apr 2024Source
  • 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER CERTIFICATE.pdf · uploaded 20 Apr 2024Source
  • 4 Disclosure of sold/ booked inventoryEAGLE INVNTOARY.pdf · uploaded 20 Apr 2024Source
  • 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3.pdf · uploaded 20 Apr 2024Source
  • 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)Eng certificate.pdf · uploaded 27 Jul 2024Source
  • 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)From -3.pdf · uploaded 6 Aug 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)30092024 CA.pdf · uploaded 18 Oct 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGG 30092024.pdf · uploaded 18 Oct 2024Source
  • 3 Disclosure of sold/ booked inventory31122022.pdf · uploaded 18 Oct 2024Source
  • 6 Disclosure of sold/ booked inventory30092024.pdf · uploaded 18 Oct 2024Source
  • 5 Disclosure of sold/ booked inventory30062024.pdf · uploaded 18 Oct 2024Source
  • 4 Disclosure of sold/ booked inventory31032023.pdf · uploaded 18 Oct 2024Source
  • 2 Disclosure of sold/ booked inventory31032022.pdf · uploaded 18 Oct 2024Source
  • 1 Disclosure of sold/ booked inventory30062023.pdf · uploaded 18 Oct 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)2A.pdf · uploaded 18 Oct 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)2A (2).pdf · uploaded 18 Oct 2024Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A Updated FY 2022.pdf · uploaded 19 Oct 2024Source
  • 1 a Details of encumbrances concerned to Finance2 Legal Ecumbarance.pdf · uploaded 11 Nov 2024Source
  • 1 Commencement Certificates / NA Order for plotted developmentUpdated Commencement Certificate.pdf · uploaded 11 Nov 2024Source
  • 1 Declaration about Commencement CertificateDeclaration about Commencement Certificate (3).pdf · uploaded 11 Nov 2024Source
  • 1 CERSAI detailsCERSAI Declaration_page-0001.pdf · uploaded 11 Nov 2024Source
  • 1 Declaration about all RERA Designated Bank Accounts (Format A)Format A declaration about separate bank account.pdf · uploaded 11 Nov 2024Source
  • 1 b Details of encumbrances concerned to Legal2 Legal Ecumbarance.pdf · uploaded 11 Nov 2024Source
  • 1 Other – TechnicalANNEXURE - A.pdf · uploaded 11 Nov 2024Source
  • 1 Copy of Layout Approval (in case of layout)1-3.pdf · uploaded 12 Nov 2024Source
  • 1 Building Plan Approval / NA Order for plotted developmentFull Building_HPSC0934 NS New.pdf · uploaded 12 Nov 2024Source
  • 2 Building Plan Approval / NA Order for plotted developmentElevation_HPSC0935 NS New.pdf · uploaded 12 Nov 2024Source
  • 2 Declaration about all RERA Designated Bank Accounts (Format A)Format A declaration about separate bank account_page-0001.pdf · uploaded 12 Nov 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CHARTERED ACCOUNTANTS_page-0001.pdf · uploaded 8 Jan 2025Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CHARTERED ACCOUNTANTS (3)_page-0001.pdf · uploaded 8 Jan 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)FORM 5.pdf · uploaded 8 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect RERA certificate Q3.pdf · uploaded 12 Feb 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate Q3 Oct-Dec 24.pdf · uploaded 12 Feb 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA.pdf · uploaded 13 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGG.pdf · uploaded 13 Apr 2025Source
  • 1 Disclosure of sold/ booked inventorySOLD UNSOLD.pdf · uploaded 13 Apr 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM1 - ARCHITECT CERTIFICATE Q4 Jan - Mar 25.pdf · uploaded 18 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Q4 Jan - Mar 2025.pdf · uploaded 18 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate Q4 Jan-Mar 25.pdf · uploaded 18 Apr 2025Source
  • Form 1FORM 1.pdf · uploaded 22 Jul 2025Source
  • Form 2FORM 2.pdf · uploaded 22 Jul 2025Source
  • Form 3CA.pdf · uploaded 22 Jul 2025Source
  • Disclosure of Sold and Booked InventorySOLD.pdf · uploaded 22 Jul 2025Source
  • Form 5 (FY 2024-2025)sign form 5 done.pdf · uploaded 1 Oct 2025Source
  • Form 1Architect Certificate.pdf · uploaded 8 Oct 2025Source
  • Form 2ENG.pdf · uploaded 8 Oct 2025Source
  • Form 3CA.pdf · uploaded 8 Oct 2025Source
  • Disclosure of Sold and Booked InventoryEagle Era Sold Unsold List.pdf · uploaded 8 Oct 2025Source
  • Form 2A (FY 2024-2025)form2a.pdf · uploaded 19 Dec 2025Source
  • Withdrawal Update Form 1Eagle Architect Certificate.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 2Eagle Engineer Certificate.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 3FORM 3.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 1Eagle Architect Certificate.pdf · uploaded 6 Feb 2026Source
  • Withdrawal Update Form 2Eagle Engineer Certificate.pdf · uploaded 6 Feb 2026Source
  • Withdrawal Update Form 3FORM 3.pdf · uploaded 6 Feb 2026Source
  • Withdrawal Update Form 1Eagle Architect Cert..pdf · uploaded 20 Apr 2026Source
  • Withdrawal Update Form 1Eagle Architect Cert..pdf · uploaded 20 Apr 2026Source
  • Withdrawal Update Form 2Eagle Engg. Cert..pdf · uploaded 20 Apr 2026Source
  • Withdrawal Update Form 2Eagle Engg. Cert..pdf · uploaded 20 Apr 2026Source
  • Withdrawal Update Form 3Eagle C A Cert..pdf · uploaded 20 Apr 2026Source
  • Withdrawal Update Form 3Eagle C A Cert..pdf · uploaded 20 Apr 2026Source
  • Form 2A (FY 2025-2026)FORM 2A.pdf · uploaded 6 May 2026Source
  • Occupational CertificateFULL OCCUPANCY CERTIFICATE.pdf · uploaded 13 Jul 2026Source
  • Occupational CertificateGmail Verification of Completion Certificate.pdf · uploaded 13 Jul 2026Source
  • Withdrawal Update Form 1Eagle Architect Certificate Q1.pdf · uploaded 15 Jul 2026Source
  • Withdrawal Update Form 1Eagle Architect Certificate Q1.pdf · uploaded 15 Jul 2026Source
  • Withdrawal Update Form 2Eagle Engg. Cert..pdf · uploaded 15 Jul 2026Source
  • Withdrawal Update Form 2Eagle Engineer Certificate Q1.pdf · uploaded 15 Jul 2026Source
  • Withdrawal Update Form 3Eagle CA Certificate Q1.pdf · uploaded 15 Jul 2026Source
  • Withdrawal Update Form 3Eagle CA Certificate Q1.pdf · uploaded 15 Jul 2026Source

Technical

  • DocumentMYSCAN_20210921_0001 Rera.pdf · uploaded 20 Oct 2021Source
  • DocumentMYSCAN_20210921_0002 Rera.pdf · uploaded 20 Oct 2021Source
  • DocumentNA Order.pdf · uploaded 20 Oct 2021Source
  • DocumentScan_3775-0.pdf · uploaded 10 Nov 2022Source
  • DocumentScan_3775.pdf · uploaded 10 Nov 2022Source
  • DocumentEagle Realities_Sus PLAN 01_compressed.pdf · uploaded 10 Nov 2023Source
  • DocumentEagle Realities_Sus PLAN 02_compressed.pdf · uploaded 10 Nov 2023Source
  • DocumentEagle Realities_Sus PLAN 03_compressed.pdf · uploaded 10 Nov 2023Source
  • Other – TechnicalANNEXURE - A.pdf · uploaded 11 Nov 2024Source
  • Document1-3.pdf · uploaded 12 Nov 2024Source
  • DocumentFull Building_HPSC0934 NS New.pdf · uploaded 12 Nov 2024Source
  • DocumentElevation_HPSC0935 NS New.pdf · uploaded 12 Nov 2024Source
  • Documentplan 1.pdf · uploaded 19 Feb 2026Source
  • DocumentFull Building_HPSC0934 NS New.pdf · uploaded 19 Feb 2026Source
  • DocumentElevation_HPSC0935 NS New.pdf · uploaded 19 Feb 2026Source

Technical (Architect)

  • DocumentArchitect RERA certificate Q3.pdf · uploaded 12 Feb 2025Source
  • DocumentFORM1 - ARCHITECT CERTIFICATE Q4 Jan - Mar 25.pdf · uploaded 18 Apr 2025Source
  • DocumentEagle Architect Certificate Q1.pdf · uploaded 15 Jul 2026Source

Technical (Engineer)

  • DocumentENGG 30092024.pdf · uploaded 18 Oct 2024Source
  • DocumentEngineers Certificate Q3 Oct-Dec 24.pdf · uploaded 12 Feb 2025Source
  • DocumentENGG.pdf · uploaded 13 Apr 2025Source
  • DocumentEngineer Certificate Q4 Jan-Mar 25.pdf · uploaded 18 Apr 2025Source
  • DocumentEagle Engineer Certificate Q1.pdf · uploaded 15 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvals28/3/4 28/3/5

As registered with MahaRERA and published on its project page

Project type
Commercial
Status on MahaRERA
Certificate Signed
Unit types
Office space, Shop65 units in all
Address
28/3/4 28/3/5, Next To Vivgyor School, SusPIN 411021
Village
Sus, Mulshi taluka
Designated bank account
76
Developed in phases
No

Survey, CTS, gat or plot numbers

28/3/4 28/3/5

Boundaries

North
Part Of S No 28 P
South
Part Of 28 P
East
18 Mtr Road
West
Part Of S No 28 P

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking65 units

30 of 65 units booked (46%), as the promoter reported to MahaRERA

Office space · 56 unitsShop · 9 units
TypeCarpet areaUnitsBooked
Office space22.38 sq m · 241 sq ft10
Office space27.9 sq m · 300 sq ft22
Office space27.9 sq m · 300 sq ft31
Office space33.11 sq m · 356 sq ft377
Office space33.11 sq m · 356 sq ft1111
Office space99.35 sq m · 1,069 sq ft10
Office space135.77 sq m · 1,461 sq ft10
Shop27.9 sq m · 300 sq ft11
Shop33.11 sq m · 356 sq ft88

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals5

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectNlesh Saswade—
Chartered accountantANUPAMA shetty—
Chartered accountantGanesh Gapatand Associates—
EngineerRk Randhave—
Engineersuhel sanjay moholkar—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology