Swanandi Blossom Phase 1

Certificate Signed

Ravet, Pune 412101 |Promoter: Nandkumar Bhalchandra Bhondave

29 Jul 2024Registered with MahaRERA
31 Dec 2028Promised completion
30 Apr 2029Revised completionPushed back 4 months
5Buildings
206Units registered26 booked (13%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Buildings
5
Unit types
2BHK, 3BHK, Office space, Shop, Mhada206 units in all
Address
Sr No 206/2a (P), C.t.s No 271(P), 267(P), 269(P), 270(P), 339(P), Near Sant Tukaram Maharaj Bridge, Bhondve CornerPIN 412101
Designated bank account
76
Developed in phases
Yes

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 18.64376, 73.75211
Swanandi Blossom Phase 1 is at latitude 18.64376, longitude 73.75211.

Registered transactions

79 registered documents matched to this project. Consideration is the value declared in the document; the Index II opens inside Deedo.

All 79 records
Registered transactions in this project
RegisteredUnitTypeConsideration₹ / sq.ftDocument
11 Oct 2026
Bldg सी · Unit 1103
Primary sale≈ ₹1.07 Cr≈ ₹11,182
24 Sep 2026
Bldg सी · Unit 1704
Primary sale≈ ₹1.1 Cr≈ ₹11,526
24 Sep 2026
Bldg ए · Unit 902
Primary sale≈ ₹79 L≈ ₹11,511
16 Sep 2026
Bldg बी · Unit 1803
Primary sale≈ ₹78 L≈ ₹11,365
11 Sep 2026
Title transfer≈ ₹10,000—
8 Sep 2026
Bldg सी · Unit 2503
Primary sale≈ ₹98 L≈ ₹10,241
6 Sep 2026
Bldg ए · Unit 1102
Primary sale≈ ₹71 L≈ ₹10,345
13 Aug 2026
Bldg बी · Unit 1601
Primary sale≈ ₹70 L≈ ₹9,602
13 Aug 2026
Bldg सी · Unit 1803
Primary sale≈ ₹1.08 Cr≈ ₹11,286
12 Aug 2026
Bldg बी · Unit 1604
Primary sale≈ ₹82 L≈ ₹11,155
27 Jul 2026
Bldg ए · Unit 1502
Primary sale≈ ₹62 L≈ ₹9,034
27 Jul 2026
Bldg बी · Unit 2203
Primary sale≈ ₹73 L≈ ₹10,637
26 Jul 2026
Bldg सी · Unit 2402
Primary sale≈ ₹61 L≈ ₹8,888
26 Jul 2026
Bldg बी · Unit 1903
Primary sale≈ ₹78 L≈ ₹11,365
16 Jul 2026
Bldg बी · Unit 2503
Primary sale≈ ₹78 L≈ ₹11,365
16 Jul 2026
Bldg बी · Unit 2303
Primary sale≈ ₹74 L≈ ₹10,782
16 Jul 2026
Bldg ए · Unit 1002
Primary sale≈ ₹73 L≈ ₹10,637
16 Jul 2026
Bldg बी · Unit 2603
Primary sale≈ ₹78 L≈ ₹11,365
16 Jul 2026
Bldg बी · Unit 1703
Primary sale≈ ₹62 L≈ ₹9,034
16 Jul 2026
Bldg सी · Unit 502
Primary sale≈ ₹77 L≈ ₹11,219
29 Jun 2026
Bldg बी · Unit 1003
Primary sale≈ ₹77 L≈ ₹11,219
25 Jun 2026
Bldg बी · Unit 1503
Primary sale≈ ₹79 L≈ ₹11,511
23 Jun 2026
Bldg सी · Unit 102
Primary sale≈ ₹58 L≈ ₹8,451
23 Jun 2026
Bldg ए · Unit 1503
Primary sale≈ ₹88 L≈ ₹9,045
18 Jun 2026
Bldg बी · Unit 1203
Primary sale≈ ₹78 L≈ ₹11,365
17 Jun 2026
Bldg सी · Unit 602
Primary sale≈ ₹70 L≈ ₹10,200
12 Jun 2026
Bldg सी · Unit 2304
Primary sale≈ ₹87 L≈ ₹9,116
12 Jun 2026
Bldg सी · Unit 1804
Primary sale≈ ₹87 L≈ ₹9,116
9 Jun 2026
Bldg बी · Unit 2403
Primary sale≈ ₹80 L≈ ₹11,657
6 Jun 2026
Bldg सी · Unit 2504
Primary sale≈ ₹79 L≈ ₹10,836
31 May 2026
Bldg बी · Unit 1303
Primary sale≈ ₹78 L≈ ₹11,365
22 May 2026
Bldg सी · Unit 603
Primary sale≈ ₹1.06 Cr≈ ₹11,077
22 May 2026
Bldg बी · Unit 1603
Primary sale≈ ₹78 L≈ ₹11,365
15 May 2026
Bldg बी · Unit 1403
Primary sale≈ ₹77 L≈ ₹11,219
9 May 2026
Bldg बी · Unit 2501
Primary sale≈ ₹65 L≈ ₹8,916
27 Apr 2026
Bldg सी · Unit 1101
Primary sale≈ ₹79 L≈ ₹10,747
25 Apr 2026
Bldg सी · Unit 2802
Primary sale≈ ₹75 L≈ ₹10,928
19 Apr 2026
Bldg सी · Unit 2202
Primary sale≈ ₹76 L≈ ₹11,074
19 Apr 2026
Bldg सी · Unit 1904
Primary sale≈ ₹1.06 Cr≈ ₹11,107
19 Apr 2026
Bldg सी · Unit 2501
Primary sale≈ ₹80 L≈ ₹10,883
6 Apr 2026
Bldg सी · Unit 1601
Primary sale≈ ₹79 L≈ ₹10,747
6 Apr 2026
Bldg सी · Unit 202
Primary sale≈ ₹76 L≈ ₹11,074
31 Mar 2026
Bldg सी · Unit 902य
Primary sale≈ ₹76 L≈ ₹11,074
30 Mar 2026
Bldg ए · Unit 2703
Primary sale≈ ₹1 Cr≈ ₹10,278
30 Mar 2026
Bldg सी · Unit 1401
Primary sale≈ ₹1.05 Cr≈ ₹11,094
29 Mar 2026
Bldg सी · Unit 1402
Primary sale≈ ₹76 L≈ ₹11,074
29 Mar 2026
Bldg सी · Unit 604
Primary sale≈ ₹79 L≈ ₹10,836
29 Mar 2026
Bldg सी · Unit 1501
Primary sale≈ ₹1.08 Cr≈ ₹11,411
29 Mar 2026
Bldg सी · Unit 601
Primary sale≈ ₹80 L≈ ₹10,883
14 Mar 2026
Bldg बी · Unit 1103
Primary sale≈ ₹77 L≈ ₹11,219

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 4 months

Registered
29 Jul 2024
Promised
31 Dec 2028
Revised
30 Apr 2029

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210007716729 Jul 202431 Dec 202830 Apr 2029Nandkumar Bhalchandra BhondaveProject page

5 buildings

Buildings and wings named in the registration

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

26 of 206 units booked (13%), as the promoter reported to MahaRERA

2BHK · 31 units3BHK · 65 unitsOffice space · 70 unitsShop · 4 unitsMhada · 36 units
BuildingTypeCarpet areaUnitsBooked
Wing - A Orchid2BHK63.75 sq m · 686 sq ft82
Wing - A Orchid2BHK68.08 sq m · 733 sq ft10
Wing - A Orchid2BHK68.1 sq m · 733 sq ft10
Wing - A Orchid3BHK87.72 sq m · 944 sq ft81
Wing - A Orchid3BHK88.11 sq m · 948 sq ft92
Wing - A Orchid3BHK88.91 sq m · 957 sq ft94
Wing B - Sunflower2BHK63.75 sq m · 686 sq ft80
Wing B - Sunflower2BHK68.08 sq m · 733 sq ft10
Show all 30 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
Wing B - Sunflower2BHK68.1 sq m · 733 sq ft10
Wing B - Sunflower3BHK87.72 sq m · 944 sq ft70
Wing B - Sunflower3BHK88.11 sq m · 948 sq ft50
Wing B - Sunflower3BHK88.91 sq m · 957 sq ft60
Wing -C Rose2BHK63.75 sq m · 686 sq ft91
Wing -C Rose2BHK68.08 sq m · 733 sq ft10
Wing -C Rose2BHK68.1 sq m · 733 sq ft10
Wing -C Rose3BHK87.72 sq m · 944 sq ft80
Wing -C Rose3BHK88.11 sq m · 948 sq ft60
Wing -C Rose3BHK88.91 sq m · 957 sq ft71
Wing M1 - CommOffice space29.93 sq m · 322 sq ft385
Wing M1 - CommOffice space30.61 sq m · 329 sq ft194
Wing M1 - CommOffice space47.64 sq m · 513 sq ft63
Wing M1 - CommOffice space53.62 sq m · 577 sq ft10
Wing M1 - CommOffice space58.18 sq m · 626 sq ft63
Wing M1 - CommShop116.6 sq m · 1,255 sq ft10
Wing M1 - CommShop117.24 sq m · 1,262 sq ft10
Wing M1 - CommShop121.05 sq m · 1,303 sq ft10
Wing M1 - CommShop121.74 sq m · 1,310 sq ft10
Wing - M MhadaMhada48.05 sq m · 517 sq ft120
Wing - M MhadaMhada49.83 sq m · 536 sq ft120
Wing - M MhadaMhada50 sq m · 538 sq ft120

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

1 document held by Deedo, 149 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardNBBPAN.pdf · uploaded 11 Jul 2024Source
  • OthersFinance Encumbrance.pdf · uploaded 28 Oct 2025Source

Legal

  • Other – Legal7-12.pdf · uploaded 11 Jul 2024Source
  • Other – LegalPurchase deed 2419-2023_organized_11zon.pdf · uploaded 11 Jul 2024Source
  • Legal Title reportSearch Report.pdf · uploaded 11 Jul 2024Source
  • Declaration Form BForm B Pro 1.pdf · uploaded 11 Jul 2024Source

Migrated

  • 1 PAN CardNBBPAN.pdf · uploaded 11 Jul 2024Source
Show all 150 documentsShow fewer documents

Migrated

  • 1 Copy of the legal title reportSearch Report.pdf · uploaded 11 Jul 2024Source
  • 1 a Details of encumbrances concerned to FinanceNO ENCUMBRANCES CONCERNED TO LEGAL.pdf · uploaded 11 Jul 2024Source
  • 1 b Details of encumbrances concerned to LegalNO ENCUMBRANCES CONCERNED TO LEGAL.pdf · uploaded 11 Jul 2024Source
  • 1 Copy of Layout Approval (in case of layout)imgw-709074122.pdf · uploaded 11 Jul 2024Source
  • 2 Copy of Layout Approval (in case of layout)imgw-709074122_page-0001.pdf · uploaded 11 Jul 2024Source
  • 1 Building Plan Approval / NA Order for plotted development1.pdf · uploaded 11 Jul 2024Source
  • 2 Building Plan Approval / NA Order for plotted development2.pdf · uploaded 11 Jul 2024Source
  • 3 Building Plan Approval / NA Order for plotted development3 M COMM.pdf · uploaded 11 Jul 2024Source
  • 4 Building Plan Approval / NA Order for plotted development4 M COMM.pdf · uploaded 11 Jul 2024Source
  • 5 Building Plan Approval / NA Order for plotted development5 M1 MHADA.pdf · uploaded 11 Jul 2024Source
  • 6 Building Plan Approval / NA Order for plotted development6 A.pdf · uploaded 11 Jul 2024Source
  • 7 Building Plan Approval / NA Order for plotted development7 A.pdf · uploaded 11 Jul 2024Source
  • 8 Building Plan Approval / NA Order for plotted development8 B.pdf · uploaded 11 Jul 2024Source
  • 9 Building Plan Approval / NA Order for plotted development9 B.pdf · uploaded 11 Jul 2024Source
  • 10 Building Plan Approval / NA Order for plotted development10 B.pdf · uploaded 11 Jul 2024Source
  • 11 Building Plan Approval / NA Order for plotted development11 C.pdf · uploaded 11 Jul 2024Source
  • 12 Building Plan Approval / NA Order for plotted development12 C.pdf · uploaded 11 Jul 2024Source
  • 1 Commencement Certificates / NA Order for plotted developmentC C.pdf · uploaded 11 Jul 2024Source
  • 1 Declaration about Commencement CertificateC C Declaration PHS 1.pdf · uploaded 11 Jul 2024Source
  • 1 Declaration in FORM BForm B Pro 1.pdf · uploaded 11 Jul 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 PHS 1.pdf · uploaded 11 Jul 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 PHS 1.pdf · uploaded 11 Jul 2024Source
  • 1 Disclosure for secured/unsecured finance availed for the projectFinance availed.pdf · uploaded 11 Jul 2024Source
  • 1 CERSAI detailsUNDERTAKING FOR CERSAI REPORT.pdf · uploaded 11 Jul 2024Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsDisclosure other real estate.pdf · uploaded 11 Jul 2024Source
  • 1 Proforma of Allotment letterAnnexure 11.pdf · uploaded 11 Jul 2024Source
  • 1 Proforma of Agreement for saleAFS.pdf · uploaded 11 Jul 2024Source
  • 1 Deviation Report with respect to Allotment letterDev A L.pdf · uploaded 11 Jul 2024Source
  • 1 Deviation Report with respect to model copy of AgreementDEVIATION REPORT.pdf · uploaded 11 Jul 2024Source
  • 1 Other – Legal7-12.pdf · uploaded 11 Jul 2024Source
  • 2 Other – LegalPurchase deed 2419-2023_organized_11zon.pdf · uploaded 11 Jul 2024Source
  • 1 Other – TechnicalORDER 50.pdf · uploaded 11 Jul 2024Source
  • 2 a Details of encumbrances concerned to FinanceNo ENCUMBRANCES CONCERED TO FINANCE_page-0001.pdf · uploaded 18 Jul 2024Source
  • 2 b Details of encumbrances concerned to LegalNo ENCUMBRANCES CONCERED TO FINANCE_page-0001.pdf · uploaded 18 Jul 2024Source
  • 13 Building Plan Approval / NA Order for plotted developmentimg 05 M1.pdf · uploaded 18 Jul 2024Source
  • 14 Building Plan Approval / NA Order for plotted developmentC2 14.pdf · uploaded 18 Jul 2024Source
  • 15 Building Plan Approval / NA Order for plotted developmentCC Verfication 74.pdf · uploaded 18 Jul 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 SWANANDI BLOSSOM 1_11zon.pdf · uploaded 22 Jul 2024Source
  • 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)NBB Format B.pdf · uploaded 22 Jul 2024Source
  • 1 Declaration about all RERA Designated Bank Accounts (Format A)Format A.pdf · uploaded 22 Jul 2024Source
  • 2 Proforma of Agreement for saleAgreement Draft 16-08-2024.pdf · uploaded 17 Aug 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 17 Oct 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3_compressed.pdf · uploaded 17 Oct 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 17 Oct 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 15 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_11zon.pdf · uploaded 15 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 15 Jan 2025Source
  • DocumentForm 1 - Ph.pdf · uploaded 29 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 29 Apr 2025Source
  • Documentsb 1 fr 2.pdf · uploaded 29 Apr 2025Source
  • Form 1Form 1 swanandi blossom.pdf · uploaded 20 Jul 2025Source
  • Form 2Form 2.PDF · uploaded 20 Jul 2025Source
  • Form 3Form 3 1.pdf · uploaded 20 Jul 2025Source
  • Disclosure of Sold and Booked InventorySold Unsold.pdf · uploaded 20 Jul 2025Source
  • Form 5 (FY 2024-2025)Form 5 24-25.pdf · uploaded 29 Sep 2025Source
  • Form 1Form 1.pdf · uploaded 8 Oct 2025Source
  • Form 2Form 2.pdf · uploaded 8 Oct 2025Source
  • Form 3Form 3_compressed.pdf · uploaded 8 Oct 2025Source
  • Disclosure of Sold and Booked InventorySold Unsold 30092025.pdf · uploaded 8 Oct 2025Source
  • Withdrawal Update Form 1Form 1 PHS 1.pdf · uploaded 25 Oct 2025Source
  • Withdrawal Update Form 2Form 2.pdf · uploaded 25 Oct 2025Source
  • Withdrawal Update Form 3Form 3_compressed.pdf · uploaded 25 Oct 2025Source
  • Withdrawal Update Form 1Form 1.PDF · uploaded 19 Jan 2026Source
  • Withdrawal Update Form 2Form 2.PDF · uploaded 19 Jan 2026Source
  • Withdrawal Update Form 3Form 3 - Ph 1.pdf · uploaded 19 Jan 2026Source
  • Withdrawal Update Form 1Form 1.PDF · uploaded 6 Mar 2026Source
  • Withdrawal Update Form 2Form 2.PDF · uploaded 6 Mar 2026Source
  • Withdrawal Update Form 3Form 3 - Ph 1.pdf · uploaded 6 Mar 2026Source
  • Withdrawal Update Form 1Form 1.PDF · uploaded 16 Apr 2026Source
  • Withdrawal Update Form 2Form 2 Sign.pdf · uploaded 16 Apr 2026Source
  • Withdrawal Update Form 3Form 3 Sign_compressed.pdf · uploaded 16 Apr 2026Source
  • Form 2A (FY 2024-2025)2A_ 2024.PDF · uploaded 21 Apr 2026Source
  • Form 2A (FY 2025-2026)2A_ 2025.PDF · uploaded 21 Apr 2026Source
  • Form 2A (FY 2026-2027)2A_ 2026.PDF · uploaded 21 Apr 2026Source
  • Form 5 (FY 2025-2026)Form 5 -.pdf · uploaded 21 Apr 2026Source
  • Withdrawal Update Form 1Form 1.PDF · uploaded 15 Jul 2026Source
  • Withdrawal Update Form 2Form 1.pdf · uploaded 15 Jul 2026Source
  • Withdrawal Update Form 3Form 3.pdf · uploaded 15 Jul 2026Source
  • Withdrawal Update Form 1Form 1.pdf · uploaded 20 Jul 2026Source
  • Withdrawal Update Form 1Form 1.pdf · uploaded 20 Jul 2026Source
  • Withdrawal Update Form 2Form 2.pdf · uploaded 20 Jul 2026Source
  • Withdrawal Update Form 2Form 2.pdf · uploaded 20 Jul 2026Source
  • Withdrawal Update Form 3Form 3.pdf · uploaded 20 Jul 2026Source
  • Withdrawal Update Form 3Form 3.pdf · uploaded 20 Jul 2026Source

Technical

  • Documentimgw-709074122.pdf · uploaded 11 Jul 2024Source
  • Documentimgw-709074122_page-0001.pdf · uploaded 11 Jul 2024Source
  • Document1.pdf · uploaded 11 Jul 2024Source
  • Document2.pdf · uploaded 11 Jul 2024Source
  • Document3 M COMM.pdf · uploaded 11 Jul 2024Source
  • Document4 M COMM.pdf · uploaded 11 Jul 2024Source
  • Document5 M1 MHADA.pdf · uploaded 11 Jul 2024Source
  • Document6 A.pdf · uploaded 11 Jul 2024Source
  • Document7 A.pdf · uploaded 11 Jul 2024Source
  • Document8 B.pdf · uploaded 11 Jul 2024Source
  • Document9 B.pdf · uploaded 11 Jul 2024Source
  • Document10 B.pdf · uploaded 11 Jul 2024Source
  • Document11 C.pdf · uploaded 11 Jul 2024Source
  • Document12 C.pdf · uploaded 11 Jul 2024Source
  • Other – TechnicalORDER 50.pdf · uploaded 11 Jul 2024Source
  • Documentimg 05 M1.pdf · uploaded 18 Jul 2024Source
  • DocumentC2 14.pdf · uploaded 18 Jul 2024Source
  • DocumentCC Verfication 74.pdf · uploaded 18 Jul 2024Source
  • Document1 Layout_page-0001.pdf · uploaded 10 Nov 2025Source
  • Document2 Plan - Basment A B C Parking.pdf · uploaded 10 Nov 2025Source
  • Document3 Plan - Basement 1 M and M1.pdf · uploaded 10 Nov 2025Source
  • Document4 Plan - Ground Parking M 1.pdf · uploaded 10 Nov 2025Source
  • Document5 Plan - M1 Commercial.pdf · uploaded 10 Nov 2025Source
  • Document6 Plan - M1.pdf · uploaded 10 Nov 2025Source
  • Document7 Plan - M_organized.pdf · uploaded 10 Nov 2025Source
  • Document8 Plan - M.pdf · uploaded 10 Nov 2025Source
  • Document9 Plan - A Orchid.pdf · uploaded 10 Nov 2025Source
  • Document10 Plan - B Sunflower.pdf · uploaded 10 Nov 2025Source
  • Document11 Plan - B Sunflower.pdf · uploaded 10 Nov 2025Source
  • Document12 Plan - C Rose.pdf · uploaded 10 Nov 2025Source
  • Document13 Plan - C Rose.pdf · uploaded 10 Nov 2025Source
  • Document14 Plan - C Rose.pdf · uploaded 10 Nov 2025Source
  • Document16 Plan - Club House.pdf · uploaded 10 Nov 2025Source
  • Document01 Layout Calculation Highlited 1.pdf · uploaded 22 Apr 2026Source
  • Document02 Plan Wing A B C D Basement.pdf · uploaded 22 Apr 2026Source
  • Document03 Plan Wing M1 M.pdf · uploaded 22 Apr 2026Source
  • Document04 Plan Wing M1.pdf · uploaded 22 Apr 2026Source
  • Document05 Plan Wing M1.pdf · uploaded 22 Apr 2026Source
  • Document06 Plan Wing M1.pdf · uploaded 22 Apr 2026Source
  • Document07 Plan Wing M.pdf · uploaded 22 Apr 2026Source
  • Document09 Plan Wing A.pdf · uploaded 22 Apr 2026Source
  • Document10 Plan-Wing B.pdf · uploaded 22 Apr 2026Source
  • Document11 Plan Wing B.pdf · uploaded 22 Apr 2026Source
  • Document12 Plan Wing B.pdf · uploaded 22 Apr 2026Source
  • Document13 Plan Wing B.pdf · uploaded 22 Apr 2026Source
  • Document14 Plan-Wing C.pdf · uploaded 22 Apr 2026Source
  • Document15 Plan Wing C.pdf · uploaded 22 Apr 2026Source
  • Document16 Plan Wing C.pdf · uploaded 22 Apr 2026Source
  • Document18 Club House.pdf · uploaded 22 Apr 2026Source
  • Document10 Plan-Wing A - Elevation.pdf · uploaded 15 May 2026Source

Technical (Architect)

  • DocumentForm 1.pdf · uploaded 17 Oct 2024Source
  • DocumentForm 1.pdf · uploaded 15 Jan 2025Source
  • DocumentForm 1 - Ph.pdf · uploaded 29 Apr 2025Source
  • DocumentForm 1.pdf · uploaded 20 Jul 2026Source

Technical (Engineer)

  • DocumentForm 2.pdf · uploaded 17 Oct 2024Source
  • DocumentForm 2.pdf · uploaded 15 Jan 2025Source
  • Documentsb 1 fr 2.pdf · uploaded 29 Apr 2025Source
  • DocumentForm 2.pdf · uploaded 20 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Ravet, Haveli taluka

Survey, CTS, gat or plot numbers

267(P)269(P)270(P)339(P)C.T.S NO 271(P)SR NO 206/2A (P)

Boundaries

North
Part Of Land Bearing Sr No 207 Of Pcntda
South
45 Meter Wide Dp Road
East
Part Of Land Bearing Sr No206 2a Of Govind Bhondve
West
Part Of Land Bearing Sr No 206 2b Of N B Bhondave

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectVishal Bafana—
Chartered accountantCA Mohmedyasir A. Bagwan—
Chartered accountantShubham Bora—
EngineerAjinkya Ankush Lahigude—
EngineerMayur Madane—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology