Others · 3 buildings · 531 unitsRERA P52100056310

Cielo By Vtp Luxe

Deedo IDDP-PUN-B1NF

Completion was pushed back 4 months, to Apr 2029; no MahaRERA orders on record; 0% of its units are booked.

Mulshi, Maharashtra 411021 · Promoter: Delas Realcon LLP

DeliveryExtended 4 moPromised Dec 2028 · now due Apr 2029RegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales0% booked0 of 531 units · as the promoter reported to MahaRERA
Cielo By Vtp Luxe project report cardPDF: delivery, regulatory orders, people on record, every tower and the registered deals — for your bank or lawyerSee what's inside · from ₹1,499

Completion was pushed back 4 months, to Apr 2029

  • This projectRegistered 25 May 2024, completion promised 31 Dec 2028, revised to 30 Apr 2029.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales, rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

3 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52100056310
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210005631025 May 202431 Dec 202830 Apr 2029Delas Realcon LLPProject page
Documents244

1 document held by Deedo, 243 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardPAN-DelasRealcon.pdf · uploaded 18 Apr 2024Source

Legal

  • Other – Legal36-1_19032024.pdf · uploaded 18 Apr 2024Source
  • Other – Legal36-2_19032024.pdf · uploaded 18 Apr 2024Source
  • Other – Legal7085-2024_POA_organized-1-13_compressed.pdf · uploaded 18 Apr 2024Source
  • Other – Legal7085-2024_POA_organized-14-26_compressed.pdf · uploaded 18 Apr 2024Source
  • Other – Legal7085-2024_POA_organized-27-39_compressed.pdf · uploaded 18 Apr 2024Source
  • Other – Legal7085-2024_POA_organized-40-53_compressed.pdf · uploaded 18 Apr 2024Source
Show all 244 documentsShow fewer documents

Legal

  • Legal Title reportTSR_CIELO.pdf · uploaded 18 Apr 2024Source
  • Other – LegalDeclarationfornotaddingCopromoter.pdf · uploaded 2 May 2024Source
  • Other – Legal7080-2024_Development Agreement_compressed.pdf · uploaded 3 May 2024Source
  • Declaration Form BFORM B CIELO Promoter.pdf · uploaded 29 Oct 2025Source

Migrated

  • 1 PAN CardPAN-DelasRealcon.pdf · uploaded 18 Apr 2024Source
  • 1 Copy of the legal title reportTSR_CIELO.pdf · uploaded 18 Apr 2024Source
  • 1 a Details of encumbrances concerned to FinanceEncumbranceFINANCE.pdf · uploaded 18 Apr 2024Source
  • 2 a Details of encumbrances concerned to FinanceEncumbranceLegal.pdf · uploaded 18 Apr 2024Source
  • 1 b Details of encumbrances concerned to LegalEncumbranceFINANCE.pdf · uploaded 18 Apr 2024Source
  • 2 b Details of encumbrances concerned to LegalEncumbranceLegal.pdf · uploaded 18 Apr 2024Source
  • 1 Commencement Certificates / NA Order for plotted developmentSKM_C226i24041012020_0001_compressed.pdf · uploaded 18 Apr 2024Source
  • 1 CERSAI details20240418090911.pdf · uploaded 18 Apr 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 - CIELO.pdf · uploaded 18 Apr 2024Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsBVPDisclosure.pdf · uploaded 18 Apr 2024Source
  • 2 Disclosure of Interest in Other Real Estate OrganizationsNVPDisclosure.pdf · uploaded 18 Apr 2024Source
  • 3 Disclosure of Interest in Other Real Estate OrganizationsDisclosure - Sumit Diwane_compressed (1).pdf · uploaded 18 Apr 2024Source
  • 1 Proforma of Allotment letterAllotment letter.pdf · uploaded 18 Apr 2024Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameSeparateBankAC.pdf · uploaded 18 Apr 2024Source
  • 1 Deviation Report with respect to Allotment letterAllot-Deviation.pdf · uploaded 18 Apr 2024Source
  • 1 Other – Legal36-1_19032024.pdf · uploaded 18 Apr 2024Source
  • 2 Other – Legal36-2_19032024.pdf · uploaded 18 Apr 2024Source
  • 3 Other – Legal7085-2024_POA_organized-1-13_compressed.pdf · uploaded 18 Apr 2024Source
  • 4 Other – Legal7085-2024_POA_organized-14-26_compressed.pdf · uploaded 18 Apr 2024Source
  • 5 Other – Legal7085-2024_POA_organized-27-39_compressed.pdf · uploaded 18 Apr 2024Source
  • 6 Other – Legal7085-2024_POA_organized-40-53_compressed.pdf · uploaded 18 Apr 2024Source
  • 1 Other – TechnicalRevisedDeclaration50.pdf · uploaded 30 Apr 2024Source
  • 2 Other – TechnicalDeclarationforNameonCC.pdf · uploaded 30 Apr 2024Source
  • 7 Other – LegalDeclarationfornotaddingCopromoter.pdf · uploaded 2 May 2024Source
  • 8 Other – Legal7080-2024_Development Agreement_compressed.pdf · uploaded 3 May 2024Source
  • 3 Other – TechnicalLETTER TO RERA FOR ALL BLDG GROUND COVERAGE.pdf · uploaded 3 May 2024Source
  • 1 Copy of Layout Approval (in case of layout)1 Bavdhan T1 T2 T3.pdf · uploaded 9 May 2024Source
  • 1 Building Plan Approval / NA Order for plotted development2.pdf · uploaded 9 May 2024Source
  • 2 Building Plan Approval / NA Order for plotted development3.pdf · uploaded 9 May 2024Source
  • 3 Building Plan Approval / NA Order for plotted development4.pdf · uploaded 9 May 2024Source
  • 4 Building Plan Approval / NA Order for plotted development5.pdf · uploaded 9 May 2024Source
  • 5 Building Plan Approval / NA Order for plotted development6.pdf · uploaded 9 May 2024Source
  • 6 Building Plan Approval / NA Order for plotted development7.pdf · uploaded 9 May 2024Source
  • 7 Building Plan Approval / NA Order for plotted development8.pdf · uploaded 9 May 2024Source
  • 8 Building Plan Approval / NA Order for plotted development9.pdf · uploaded 9 May 2024Source
  • 9 Building Plan Approval / NA Order for plotted development10.pdf · uploaded 9 May 2024Source
  • 10 Building Plan Approval / NA Order for plotted development11.pdf · uploaded 9 May 2024Source
  • 11 Building Plan Approval / NA Order for plotted development12.pdf · uploaded 9 May 2024Source
  • 12 Building Plan Approval / NA Order for plotted development13.pdf · uploaded 9 May 2024Source
  • 13 Building Plan Approval / NA Order for plotted development14.pdf · uploaded 9 May 2024Source
  • 14 Building Plan Approval / NA Order for plotted development15.pdf · uploaded 9 May 2024Source
  • 15 Building Plan Approval / NA Order for plotted development16.pdf · uploaded 9 May 2024Source
  • 16 Building Plan Approval / NA Order for plotted development17.pdf · uploaded 9 May 2024Source
  • 17 Building Plan Approval / NA Order for plotted development18.pdf · uploaded 9 May 2024Source
  • 18 Building Plan Approval / NA Order for plotted development19.pdf · uploaded 9 May 2024Source
  • 19 Building Plan Approval / NA Order for plotted development20.pdf · uploaded 9 May 2024Source
  • 4 Other – TechnicalPOA 1.pdf · uploaded 9 May 2024Source
  • 5 Other – TechnicalPOA 2.pdf · uploaded 9 May 2024Source
  • 6 Other – TechnicalSpecial POA 1.pdf · uploaded 9 May 2024Source
  • 7 Other – TechnicalSpecial POA 2.pdf · uploaded 9 May 2024Source
  • 8 Other – TechnicalDEVELOPMENT AGREEMENT.pdf · uploaded 9 May 2024Source
  • 1 Declaration in FORM BFORM B - CO-PROMOTERS.pdf · uploaded 14 May 2024Source
  • 1 Declaration about Commencement CertificateFORMAT D 17052024.pdf · uploaded 17 May 2024Source
  • 1 Proforma of Agreement for saleAFS_VTP Cielo.pdf · uploaded 21 May 2024Source
  • 1 Deviation Report with respect to model copy of AgreementAFS DEVIATION 21052024.pdf · uploaded 21 May 2024Source
  • 9 Other – TechnicalSKM_C226i24041012030_0001_compressed.pdf · uploaded 21 May 2024Source
  • 3 a Details of encumbrances concerned to FinanceVTP CIelo_Financial Encumbrance.pdf · uploaded 19 Jun 2024Source
  • 3 b Details of encumbrances concerned to LegalVTP CIelo_Financial Encumbrance.pdf · uploaded 19 Jun 2024Source
  • 2 Proforma of Agreement for saleVTP Cielo_AFS.pdf · uploaded 19 Jun 2024Source
  • 1 Disclosure of sold/ booked inventoryVTP CIELO 30062024.pdf · uploaded 17 Jul 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM- 2 VTP Ceilo Ph1 3.pdf · uploaded 20 Jul 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 VTP CIELO 30062024.pdf · uploaded 20 Jul 2024Source
  • 2 Disclosure of sold/ booked inventoryCIELO 30092024.pdf · uploaded 10 Oct 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1- VTP CIELO.pdf · uploaded 22 Oct 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 CIELO 30092024.pdf · uploaded 22 Oct 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 VTP CIELO 30092024.pdf · uploaded 22 Oct 2024Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 - CIELO.pdf · uploaded 22 Oct 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 VTP CIELO 30092024.pdf · uploaded 22 Oct 2024Source
  • 1 Commencement Certificates / NA Order for plotted developmentcc 29102024.pdf · uploaded 30 Oct 2024Source
  • 5 Building Plan Approval / NA Order for plotted development5-21_11zon.pdf · uploaded 30 Oct 2024Source
  • 21 Building Plan Approval / NA Order for plotted development21-21_11zon.pdf · uploaded 30 Oct 2024Source
  • 20 Building Plan Approval / NA Order for plotted development20-21.pdf · uploaded 30 Oct 2024Source
  • 19 Building Plan Approval / NA Order for plotted development19-21.pdf · uploaded 30 Oct 2024Source
  • 18 Building Plan Approval / NA Order for plotted development18-21.pdf · uploaded 30 Oct 2024Source
  • 17 Building Plan Approval / NA Order for plotted development17-21.pdf · uploaded 30 Oct 2024Source
  • 16 Building Plan Approval / NA Order for plotted development16-21_11zon.pdf · uploaded 30 Oct 2024Source
  • 15 Building Plan Approval / NA Order for plotted development15-21_11zon.pdf · uploaded 30 Oct 2024Source
  • 14 Building Plan Approval / NA Order for plotted development14-21_11zon.pdf · uploaded 30 Oct 2024Source
  • 13 Building Plan Approval / NA Order for plotted development13-21_11zon.pdf · uploaded 30 Oct 2024Source
  • 12 Building Plan Approval / NA Order for plotted development12-21_11zon (1).pdf · uploaded 30 Oct 2024Source
  • 11 Building Plan Approval / NA Order for plotted development11-21_11zon.pdf · uploaded 30 Oct 2024Source
  • 10 Building Plan Approval / NA Order for plotted development9-21.pdf · uploaded 30 Oct 2024Source
  • 9 Building Plan Approval / NA Order for plotted development10-21_11zon.pdf · uploaded 30 Oct 2024Source
  • 8 Building Plan Approval / NA Order for plotted development8-21_11zon.pdf · uploaded 30 Oct 2024Source
  • 7 Building Plan Approval / NA Order for plotted development7-21_11zon.pdf · uploaded 30 Oct 2024Source
  • 6 Building Plan Approval / NA Order for plotted development6-21_11zon.pdf · uploaded 30 Oct 2024Source
  • 4 Building Plan Approval / NA Order for plotted development4-21_11zon (1).pdf · uploaded 30 Oct 2024Source
  • 3 Building Plan Approval / NA Order for plotted development3-21_11zon_11zon.pdf · uploaded 30 Oct 2024Source
  • 2 Building Plan Approval / NA Order for plotted development2-21_11zon.pdf · uploaded 30 Oct 2024Source
  • 1 Building Plan Approval / NA Order for plotted developmentBavdhan Layout_29102024_11zon.pdf · uploaded 30 Oct 2024Source
  • 1 Declaration about Commencement CertificateFormat D-29102024_VTP Cielo.pdf · uploaded 30 Oct 2024Source
  • 2 Copy of Layout Approval (in case of layout)Bavdhan Layout_29102024_11zon.pdf · uploaded 7 Nov 2024Source
  • 1 Copy of Layout Approval (in case of layout)Sanction Layout_03042024_11zon.pdf · uploaded 7 Nov 2024Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 VTP CIELO 26112024_compressed.pdf · uploaded 4 Dec 2024Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 VTP CIELO 26112024.pdf · uploaded 5 Dec 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 VTP CIELO 26112024.pdf · uploaded 5 Dec 2024Source
  • 3 Disclosure of sold/ booked inventoryINVENTORY CIELO 26112024.pdf · uploaded 5 Dec 2024Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 VTP CIELO 30062024.pdf · uploaded 13 Dec 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 VTP CIELO 26112024.pdf · uploaded 7 Jan 2025Source
  • 1 Disclosure of sold/ booked inventoryCIELO 31122024.pdf · uploaded 9 Jan 2025Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 VTP CIELO 31122024.pdf · uploaded 16 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 VTP CIELO 31122024.pdf · uploaded 16 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 CIELO 31122024.pdf · uploaded 20 Jan 2025Source
  • 1 Disclosure of sold/ booked inventoryCIELO 31032025.pdf · uploaded 4 Apr 2025Source
  • 1 Declaration about Commencement CertificateSKM_C226i25040811320_0001.pdf · uploaded 11 Apr 2025Source
  • 1 Copy of Layout Approval (in case of layout)For Rera-Model.pdf · uploaded 12 Apr 2025Source
  • 1 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 12 Apr 2025Source
  • 10 Building Plan Approval / NA Order for plotted developmentHPSCANNER5738_rotated.pdf · uploaded 12 Apr 2025Source
  • 19 Building Plan Approval / NA Order for plotted developmentHPSCANNER5748.pdf · uploaded 12 Apr 2025Source
  • 18 Building Plan Approval / NA Order for plotted developmentHPSCANNER5747.pdf · uploaded 12 Apr 2025Source
  • 17 Building Plan Approval / NA Order for plotted developmentHPSCANNER5746.pdf · uploaded 12 Apr 2025Source
  • 16 Building Plan Approval / NA Order for plotted developmentHPSCANNER5745.pdf · uploaded 12 Apr 2025Source
  • 15 Building Plan Approval / NA Order for plotted developmentHPSCANNER5744_11zon.pdf · uploaded 12 Apr 2025Source
  • 14 Building Plan Approval / NA Order for plotted developmentHPSCANNER5743_11zon_rotated.pdf · uploaded 12 Apr 2025Source
  • 13 Building Plan Approval / NA Order for plotted developmentHPSCANNER5742_11zon_rotated.pdf · uploaded 12 Apr 2025Source
  • 12 Building Plan Approval / NA Order for plotted developmentHPSCANNER5741_rotated_11zon.pdf · uploaded 12 Apr 2025Source
  • 11 Building Plan Approval / NA Order for plotted developmentHPSCANNER5740_rotated_11zon.pdf · uploaded 12 Apr 2025Source
  • 9 Building Plan Approval / NA Order for plotted developmentHPSCANNER5737.pdf · uploaded 12 Apr 2025Source
  • 8 Building Plan Approval / NA Order for plotted developmentHPSCANNER5736_rotated.pdf · uploaded 12 Apr 2025Source
  • 7 Building Plan Approval / NA Order for plotted developmentHPSCANNER5735_rotated.pdf · uploaded 12 Apr 2025Source
  • 6 Building Plan Approval / NA Order for plotted developmentHPSCANNER5734_rotated_11zon.pdf · uploaded 12 Apr 2025Source
  • 5 Building Plan Approval / NA Order for plotted developmentHPSCANNER5733_rotated_11zon.pdf · uploaded 12 Apr 2025Source
  • 4 Building Plan Approval / NA Order for plotted developmentHPSCANNER5732_rotated_11zon.pdf · uploaded 12 Apr 2025Source
  • 3 Building Plan Approval / NA Order for plotted developmentHPSCANNER5731.pdf · uploaded 12 Apr 2025Source
  • 2 Building Plan Approval / NA Order for plotted developmentHPSCANNER5730.pdf · uploaded 12 Apr 2025Source
  • 1 Building Plan Approval / NA Order for plotted developmentHPSCANNER5729.pdf · uploaded 12 Apr 2025Source
  • 2 Declaration about Commencement CertificateFormat D Cielo.pdf · uploaded 12 Apr 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM-1 CIELO 31032025.pdf · uploaded 15 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 - VTP CIELO 31032025.pdf · uploaded 21 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Cielo.pdf · uploaded 22 Apr 2025Source
  • 1 Building Plan Approval / NA Order for plotted developmentHPSCANNER5739_upload_compressed.pdf · uploaded 19 May 2025Source
  • 2 Building Plan Approval / NA Order for plotted developmentHPSCANNER5740_upload_compressed.pdf · uploaded 19 May 2025Source
  • Form 5 (FY 2024-2025)FORM 5- VTP CIELO.pdf · uploaded 8 Sep 2025Source
  • Withdrawal Update Form 1FORM1 VTP CIELO.pdf · uploaded 16 Oct 2025Source
  • Withdrawal Update Form 2FORM 2 CIELO.pdf · uploaded 16 Oct 2025Source
  • Withdrawal Update Form 3Form 3 VTP CIELO.pdf · uploaded 16 Oct 2025Source
  • Withdrawal Update Form 1FORM-1 VTP CILEO 31122025.pdf · uploaded 19 Jan 2026Source
  • Withdrawal Update Form 2RERA FORM-2 CIELO (2).pdf · uploaded 19 Jan 2026Source
  • Withdrawal Update Form 3Form 3 VTP CIELO 31122025-sign copy_11zon.pdf · uploaded 19 Jan 2026Source
  • Withdrawal Update Form 1FORM1 cielo.pdf · uploaded 15 Apr 2026Source
  • Withdrawal Update Form 2form-2 cielo.pdf · uploaded 15 Apr 2026Source
  • Withdrawal Update Form 3Form 3 VTP CIELO.pdf · uploaded 15 Apr 2026Source
  • Form 2A (FY 2025-2026)VTP Cielo RERA Form 2A 2026.pdf · uploaded 18 Jun 2026Source
  • Withdrawal Update Form 1FORM-1 CIELO BY VTP LUXE.pdf · uploaded 18 Jul 2026Source
  • Withdrawal Update Form 2FORM-2 CIELO.pdf · uploaded 18 Jul 2026Source
  • Withdrawal Update Form 3form-3 cielo by luxe_11zon.pdf · uploaded 18 Jul 2026Source
  • Form 5 (FY 2025-2026)Form 5 Delas Realcon LLP.pdf · uploaded 21 Sep 2026Source

Technical

  • Other – TechnicalRevisedDeclaration50.pdf · uploaded 30 Apr 2024Source
  • Other – TechnicalDeclarationforNameonCC.pdf · uploaded 30 Apr 2024Source
  • Other – TechnicalLETTER TO RERA FOR ALL BLDG GROUND COVERAGE.pdf · uploaded 3 May 2024Source
  • Document1 Bavdhan T1 T2 T3.pdf · uploaded 9 May 2024Source
  • Document2.pdf · uploaded 9 May 2024Source
  • Document3.pdf · uploaded 9 May 2024Source
  • Document4.pdf · uploaded 9 May 2024Source
  • Document5.pdf · uploaded 9 May 2024Source
  • Document6.pdf · uploaded 9 May 2024Source
  • Document7.pdf · uploaded 9 May 2024Source
  • Document8.pdf · uploaded 9 May 2024Source
  • Document9.pdf · uploaded 9 May 2024Source
  • Document10.pdf · uploaded 9 May 2024Source
  • Document11.pdf · uploaded 9 May 2024Source
  • Document12.pdf · uploaded 9 May 2024Source
  • Document13.pdf · uploaded 9 May 2024Source
  • Document14.pdf · uploaded 9 May 2024Source
  • Document15.pdf · uploaded 9 May 2024Source
  • Document16.pdf · uploaded 9 May 2024Source
  • Document17.pdf · uploaded 9 May 2024Source
  • Document18.pdf · uploaded 9 May 2024Source
  • Document19.pdf · uploaded 9 May 2024Source
  • Document20.pdf · uploaded 9 May 2024Source
  • Other – TechnicalPOA 1.pdf · uploaded 9 May 2024Source
  • Other – TechnicalPOA 2.pdf · uploaded 9 May 2024Source
  • Other – TechnicalSpecial POA 1.pdf · uploaded 9 May 2024Source
  • Other – TechnicalSpecial POA 2.pdf · uploaded 9 May 2024Source
  • Other – TechnicalDEVELOPMENT AGREEMENT.pdf · uploaded 9 May 2024Source
  • DocumentBavdhan Layout_29102024_11zon.pdf · uploaded 30 Oct 2024Source
  • Document2-21_11zon.pdf · uploaded 30 Oct 2024Source
  • Document3-21_11zon_11zon.pdf · uploaded 30 Oct 2024Source
  • Document4-21_11zon (1).pdf · uploaded 30 Oct 2024Source
  • Document5-21_11zon.pdf · uploaded 30 Oct 2024Source
  • Document6-21_11zon.pdf · uploaded 30 Oct 2024Source
  • Document7-21_11zon.pdf · uploaded 30 Oct 2024Source
  • Document8-21_11zon.pdf · uploaded 30 Oct 2024Source
  • Document10-21_11zon.pdf · uploaded 30 Oct 2024Source
  • Document9-21.pdf · uploaded 30 Oct 2024Source
  • Document11-21_11zon.pdf · uploaded 30 Oct 2024Source
  • Document12-21_11zon (1).pdf · uploaded 30 Oct 2024Source
  • Document13-21_11zon.pdf · uploaded 30 Oct 2024Source
  • Document14-21_11zon.pdf · uploaded 30 Oct 2024Source
  • Document15-21_11zon.pdf · uploaded 30 Oct 2024Source
  • Document16-21_11zon.pdf · uploaded 30 Oct 2024Source
  • Document17-21.pdf · uploaded 30 Oct 2024Source
  • Document18-21.pdf · uploaded 30 Oct 2024Source
  • Document19-21.pdf · uploaded 30 Oct 2024Source
  • Document20-21.pdf · uploaded 30 Oct 2024Source
  • Document21-21_11zon.pdf · uploaded 30 Oct 2024Source
  • DocumentSanction Layout_03042024_11zon.pdf · uploaded 7 Nov 2024Source
  • DocumentBavdhan Layout_29102024_11zon.pdf · uploaded 7 Nov 2024Source
  • DocumentFor Rera-Model.pdf · uploaded 12 Apr 2025Source
  • DocumentHPSCANNER5729.pdf · uploaded 12 Apr 2025Source
  • DocumentHPSCANNER5730.pdf · uploaded 12 Apr 2025Source
  • DocumentHPSCANNER5731.pdf · uploaded 12 Apr 2025Source
  • DocumentHPSCANNER5732_rotated_11zon.pdf · uploaded 12 Apr 2025Source
  • DocumentHPSCANNER5733_rotated_11zon.pdf · uploaded 12 Apr 2025Source
  • DocumentHPSCANNER5734_rotated_11zon.pdf · uploaded 12 Apr 2025Source
  • DocumentHPSCANNER5735_rotated.pdf · uploaded 12 Apr 2025Source
  • DocumentHPSCANNER5736_rotated.pdf · uploaded 12 Apr 2025Source
  • DocumentHPSCANNER5737.pdf · uploaded 12 Apr 2025Source
  • DocumentHPSCANNER5738_rotated.pdf · uploaded 12 Apr 2025Source
  • DocumentHPSCANNER5740_rotated_11zon.pdf · uploaded 12 Apr 2025Source
  • DocumentHPSCANNER5741_rotated_11zon.pdf · uploaded 12 Apr 2025Source
  • DocumentHPSCANNER5742_11zon_rotated.pdf · uploaded 12 Apr 2025Source
  • DocumentHPSCANNER5743_11zon_rotated.pdf · uploaded 12 Apr 2025Source
  • DocumentHPSCANNER5744_11zon.pdf · uploaded 12 Apr 2025Source
  • DocumentHPSCANNER5745.pdf · uploaded 12 Apr 2025Source
  • DocumentHPSCANNER5746.pdf · uploaded 12 Apr 2025Source
  • DocumentHPSCANNER5747.pdf · uploaded 12 Apr 2025Source
  • DocumentHPSCANNER5748.pdf · uploaded 12 Apr 2025Source
  • DocumentHPSCANNER5739_upload_compressed.pdf · uploaded 19 May 2025Source
  • DocumentHPSCANNER5740_upload_compressed.pdf · uploaded 19 May 2025Source
  • Other – TechnicalCielo Reply.pdf · uploaded 13 Nov 2025Source

Technical (Architect)

  • DocumentFORM 1- VTP CIELO.pdf · uploaded 22 Oct 2024Source
  • DocumentFORM 1 CIELO 30092024.pdf · uploaded 22 Oct 2024Source
  • DocumentFORM 1 VTP CIELO 26112024.pdf · uploaded 5 Dec 2024Source
  • DocumentFORM 1 CIELO 31122024.pdf · uploaded 20 Jan 2025Source
  • DocumentFORM-1 CIELO 31032025.pdf · uploaded 15 Apr 2025Source
  • DocumentFORM-1 CIELO BY VTP LUXE.pdf · uploaded 18 Jul 2026Source

Technical (Engineer)

  • DocumentFORM 2 VTP CIELO 30092024.pdf · uploaded 22 Oct 2024Source
  • DocumentFORM 2 VTP CIELO 26112024.pdf · uploaded 5 Dec 2024Source
  • DocumentFORM 2 VTP CIELO 31122024.pdf · uploaded 16 Jan 2025Source
  • DocumentForm 2 Cielo.pdf · uploaded 22 Apr 2025Source
  • DocumentFORM-2 CIELO.pdf · uploaded 18 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvals36/1 + 36/2 at Mulshi

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Unit types
2BHK, 3BHK, 4BHK, Shop, 3.5BHK, 2.5BHK531 units in all
Address
36/1 + 36/2, S No 36, PVPIT road near Rohan Madhuban, Bavdhan KhurdPIN 411021
Designated bank account
85
Developed in phases
Yes

Survey, CTS, gat or plot numbers

36/1 + 36/2 at Mulshi

Boundaries

North
S No 48
South
18 M Wide D P Road
East
S No 35
West
S No 37

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking531 units

0 of 531 units booked (0%), as the promoter reported to MahaRERA

2BHK · 204 units3BHK · 253 units4BHK · 41 unitsShop · 26 units3.5BHK · 3 units2.5BHK · 4 units
BuildingTypeCarpet areaUnitsBooked
Tower 1 Wing A2BHK115.73 sq m · 1,246 sq ft30
Tower 1 Wing A3BHK90.61 sq m · 975 sq ft430
Tower 1 Wing A3BHK98.09 sq m · 1,056 sq ft220
Tower 1 Wing A3BHK136.6 sq m · 1,470 sq ft210
Tower 1 Wing A4BHK162.04 sq m · 1,744 sq ft410
Tower 1 Wing AShop26.09 sq m · 281 sq ft10
Tower 1 Wing AShop28.82 sq m · 310 sq ft10
Tower 1 Wing AShop30.95 sq m · 333 sq ft20
Show all 48 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
Tower 1 Wing AShop30.95 sq m · 333 sq ft20
Tower 1 Wing AShop31.18 sq m · 336 sq ft10
Tower 1 Wing AShop31.37 sq m · 338 sq ft10
Tower 1 Wing AShop35.31 sq m · 380 sq ft10
Tower 1 Wing AShop35.5 sq m · 382 sq ft10
Tower 1 Wing AShop42.79 sq m · 461 sq ft10
Tower 2 Wing B2BHK78.61 sq m · 846 sq ft190
Tower 2 Wing B2BHK79.56 sq m · 856 sq ft210
Tower 2 Wing B2BHK79.65 sq m · 857 sq ft220
Tower 2 Wing B2BHK80.14 sq m · 863 sq ft210
Tower 2 Wing B3.5BHK136.68 sq m · 1,471 sq ft30
Tower 2 Wing B3BHK115.57 sq m · 1,244 sq ft210
Tower 2 Wing B3BHK116.33 sq m · 1,252 sq ft220
Tower 2 Wing B3BHK116.34 sq m · 1,252 sq ft210
Tower 2 Wing B3BHK116.82 sq m · 1,257 sq ft190
Tower 2 Wing BShop27.14 sq m · 292 sq ft10
Tower 2 Wing BShop28.12 sq m · 303 sq ft10
Tower 2 Wing BShop28.38 sq m · 305 sq ft10
Tower 2 Wing BShop29.99 sq m · 323 sq ft10
Tower 2 Wing BShop30.85 sq m · 332 sq ft10
Tower 2 Wing BShop30.89 sq m · 332 sq ft10
Tower 2 Wing BShop31.22 sq m · 336 sq ft20
Tower 2 Wing BShop34.03 sq m · 366 sq ft10
Tower 2 Wing BShop37.94 sq m · 408 sq ft10
Tower 2 Wing BShop43.59 sq m · 469 sq ft10
Tower 2 Wing BShop50.99 sq m · 549 sq ft10
Tower 2 Wing BShop63.77 sq m · 686 sq ft10
Tower 2 Wing BShop76.37 sq m · 822 sq ft10
Tower 2 Wing BShop88.14 sq m · 949 sq ft10
Tower 3 Wing C2.5BHK88.65 sq m · 954 sq ft40
Tower 3 Wing C2BHK70.7 sq m · 761 sq ft170
Tower 3 Wing C2BHK70.71 sq m · 761 sq ft210
Tower 3 Wing C2BHK70.96 sq m · 764 sq ft170
Tower 3 Wing C2BHK70.96 sq m · 764 sq ft210
Tower 3 Wing C2BHK73.21 sq m · 788 sq ft210
Tower 3 Wing C2BHK74.18 sq m · 798 sq ft210
Tower 3 Wing C3BHK105.47 sq m · 1,135 sq ft210
Tower 3 Wing C3BHK105.68 sq m · 1,138 sq ft210
Tower 3 Wing C3BHK106.18 sq m · 1,143 sq ft210
Tower 3 Wing C3BHK106.18 sq m · 1,143 sq ft210

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals40

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectVoussoirs—
Chartered accountantSAC & Co LLP—
EngineerVinayak Boga—
EngineerVinodkumar Mishra—
Registered real estate agent360 Realtors LLP—
Registered real estate agentANAROCK Property Consultants Pvt. Ltd.—
Registered real estate agentBasil Realty & Infra Solution LLP—
Registered real estate agentBharat Shankar Tawar proprietor of Sai real estate solution—
Show all 40 professionalsShow fewer professionals
RoleNameRegistration no.
Registered real estate agentBrickfolio Solutions Private Limited—
Registered real estate agentBullmen Realty India Private Limited—
Registered real estate agentChasing Spaces Private Limited—
Registered real estate agentClearspace Prop-Tech India Private Limited—
Registered real estate agentFirstdoor Realty LLP—
Registered real estate agentFirstkey Realtors Private Limited—
Registered real estate agentHiren Natvarlal Trivedi—
Registered real estate agentHomesfy Realty Limited—
Registered real estate agentInvestoxpert Advisors Private Limited—
Registered real estate agentKamaal Khan—
Registered real estate agentKey Mansions Private Limited—
Registered real estate agentKingsFort Developers Private Limited—
Registered real estate agentKprbsk Realtors Private Limited—
Registered real estate agentKrishna Kumar Panday—
Registered real estate agentKumra & Bindal Consultants Private Limited—
Registered real estate agentLivnest Technologies Private Limited—
Registered real estate agentMagicstone Spaces LLP—
Registered real estate agentParesh Sureshrao Mamidwar—
Registered real estate agentProIndia Realty Private Limited—
Registered real estate agentPropBiz Advisors Private Limited—
Registered real estate agentPropengine Realtech Private Limited—
Registered real estate agentPropertypistol Realty Private Limited—
Registered real estate agentPropnivesh Private Limited—
Registered real estate agentRahri Services Pvt Ltd—
Registered real estate agentRahul Kumar Singh—
Registered real estate agentRealty Assistant Private Limited—
Registered real estate agentRockwellroyal Homes Private Limited—
Registered real estate agentSantosh Pande—
Registered real estate agentSmc Real Estate Advisors Private Limited—
Registered real estate agentSpacewalk Advisors LLP—
Registered real estate agentSquare Yards Consulting Private Limited—
Registered real estate agentWillow Stone Realty Private Limited—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology