Skip to content

Sai Signature

Certificate Signed

Mamurdi, Pune 412101 |Promoter: Shree Sai Creatives

Residential / Group HousingRERAP52100030759
13 Sep 2021Registered with MahaRERA
30 Sep 2026Promised completion
30 Jan 2027Revised completionPushed back 4 months
4Buildings
237Units registered75 booked (32%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Buildings
4
Unit types
2BHK, 3BHK237 units in all
Address
Sr. No.6/4 P, 6/3/3, 6/3/3/1, 6/3/3/2, 6/3/3/3 MamurdiPIN 412101
Designated bank account
171
Developed in phases
Yes

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 4 months

Registered
13 Sep 2021
Promised
30 Sep 2026
Revised
30 Jan 2027

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210003075913 Sep 202130 Sep 202630 Jan 2027Shree Sai CreativesProject page

4 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Wing A1658
Wing B1659
Wing C1660
Wing D1660

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

75 of 237 units booked (32%), as the promoter reported to MahaRERA

2BHK · 168 units3BHK · 69 units
BuildingTypeCarpet areaUnitsBooked
Wing A2BHK63.24 sq m · 681 sq ft20
Wing A2BHK64.99 sq m · 700 sq ft140
Wing A2BHK69.52 sq m · 748 sq ft150
Wing A2BHK75.61 sq m · 814 sq ft20
Wing A2BHK78.57 sq m · 846 sq ft120
Wing A3BHK97.47 sq m · 1,049 sq ft130
Wing B2BHK66.21 sq m · 713 sq ft20
Wing B2BHK66.37 sq m · 714 sq ft140
Show all 23 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
Wing B2BHK68.79 sq m · 740 sq ft10
Wing B2BHK68.89 sq m · 742 sq ft140
Wing B2BHK70.42 sq m · 758 sq ft20
Wing B2BHK71.6 sq m · 771 sq ft120
Wing B2BHK71.9 sq m · 774 sq ft10
Wing B3BHK92.88 sq m · 1,000 sq ft130
Wing C2BHK68.79 sq m · 740 sq ft159
Wing C2BHK69.63 sq m · 749 sq ft157
Wing C2BHK73.77 sq m · 794 sq ft1510
Wing C3BHK95.39 sq m · 1,027 sq ft156
Wing D2BHK69.65 sq m · 750 sq ft159
Wing D2BHK73.02 sq m · 786 sq ft22
Wing D2BHK73.84 sq m · 795 sq ft1511
Wing D3BHK98.48 sq m · 1,060 sq ft1310
Wing D3BHK99.36 sq m · 1,070 sq ft1511

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

1 document held by Deedo, 161 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardSHREE SAI CREATIVE PAN NO.PDF · uploaded 3 Sep 2021Source

Legal

  • Legal Title reportLegal Search Report_compressed.pdf · uploaded 3 Sep 2021Source
  • Declaration Form BDECLATION BY PROMOTERS - CREATIVES_compressed (1).pdf · uploaded 4 Sep 2021Source

Migrated

  • 1 PAN CardSHREE SAI CREATIVE PAN NO.PDF · uploaded 3 Sep 2021Source
  • 1 Copy of the legal title reportLegal Search Report_compressed.pdf · uploaded 3 Sep 2021Source
  • 1 Details of encumbrancesNO ENCUMBRANCE CERTIFICATE (1).pdf · uploaded 3 Sep 2021Source
  • 1 Copy of Layout Approval (in case of layout)Layout.pdf · uploaded 3 Sep 2021Source
Show all 162 documentsShow fewer documents

Migrated

  • 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate_compressed (2).pdf · uploaded 3 Sep 2021Source
  • 1 Declaration about Commencement CertificateFormat D - commencement declaration.pdf · uploaded 3 Sep 2021Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 ARCHITECT CERTIFICATE CREATIVES_compressed.pdf · uploaded 3 Sep 2021Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FROM 2 ENGI CERTIFCATE.pdf · uploaded 3 Sep 2021Source
  • 1 Proforma of Allotment letterAGREEMENT DRAFT.pdf · uploaded 3 Sep 2021Source
  • 2 Proforma of Allotment letterALLOTMENT LETTER.pdf · uploaded 3 Sep 2021Source
  • 1 Building Plan Approval / NA Order for plotted developmentPlan 1_compressed (2).pdf · uploaded 4 Sep 2021Source
  • 2 Building Plan Approval / NA Order for plotted developmentPlan 2_compressed (1).pdf · uploaded 4 Sep 2021Source
  • 3 Building Plan Approval / NA Order for plotted developmentPlan 3_compressed (1).pdf · uploaded 4 Sep 2021Source
  • 4 Building Plan Approval / NA Order for plotted developmentPlan 4_compressed (1).pdf · uploaded 4 Sep 2021Source
  • 1 Declaration in FORM BDECLATION BY PROMOTERS - CREATIVES_compressed (1).pdf · uploaded 4 Sep 2021Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 4 Sep 2021Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 SAI SIGNATURE_compressed.pdf · uploaded 29 Jul 2022Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 SHREE SAI CREATIVES_compressed.pdf · uploaded 1 Sep 2022Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 SHREE SAI CREATIVES march 2022.pdf · uploaded 1 Sep 2022Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)FORM 2A CREARTIVES MARCH 2022.pdf · uploaded 1 Sep 2022Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)3 CA CERTIFICATE MARCH 2022 CREATIVES_compressed.pdf · uploaded 1 Sep 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)FORM -5 Sai Signature 2021-2022.pdf · uploaded 24 Nov 2022Source
  • 5 Building Plan Approval / NA Order for plotted development1-8 revised SIGNATURE_compressed.pdf · uploaded 27 Feb 2023Source
  • 6 Building Plan Approval / NA Order for plotted development5-8 revised_compressed.pdf · uploaded 27 Feb 2023Source
  • 7 Building Plan Approval / NA Order for plotted development6-8 SIGNATURE_compressed.pdf · uploaded 27 Feb 2023Source
  • 8 Building Plan Approval / NA Order for plotted developmentdrrr001_compressed.pdf · uploaded 13 Jul 2023Source
  • 9 Building Plan Approval / NA Order for plotted developmentdrrr002_compressed.pdf · uploaded 13 Jul 2023Source
  • 10 Building Plan Approval / NA Order for plotted developmentdrrr003_compressed.pdf · uploaded 13 Jul 2023Source
  • 11 Building Plan Approval / NA Order for plotted developmentdrrr004_compressed.pdf · uploaded 13 Jul 2023Source
  • 12 Building Plan Approval / NA Order for plotted developmentdrrr005_compressed.pdf · uploaded 13 Jul 2023Source
  • 13 Building Plan Approval / NA Order for plotted developmentdrrr006_compressed.pdf · uploaded 13 Jul 2023Source
  • 14 Building Plan Approval / NA Order for plotted developmentdrrr007_compressed.pdf · uploaded 13 Jul 2023Source
  • 15 Building Plan Approval / NA Order for plotted developmentdrrr008 (1)_compressed.pdf · uploaded 13 Jul 2023Source
  • 2 Commencement Certificates / NA Order for plotted developmentNEW CC.pdf · uploaded 13 Jul 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)shree sai creative form 5 TILL MARCH 2023.pdf · uploaded 26 Mar 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_compressed (2).pdf · uploaded 1 Feb 2025Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_compressed.pdf · uploaded 1 Feb 2025Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_compressed (4).pdf · uploaded 1 Feb 2025Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_compressed (5).pdf · uploaded 1 Feb 2025Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_compressed (7).pdf · uploaded 1 Feb 2025Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_compressed (8).pdf · uploaded 1 Feb 2025Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_compressed (10).pdf · uploaded 1 Feb 2025Source
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_compressed (11).pdf · uploaded 1 Feb 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_compressed.pdf · uploaded 1 Feb 2025Source
  • 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_compressed (12).pdf · uploaded 3 Feb 2025Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_compressed (4).pdf · uploaded 3 Feb 2025Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_compressed (3).pdf · uploaded 3 Feb 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_compressed (2).pdf · uploaded 3 Feb 2025Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_compressed (6).pdf · uploaded 3 Feb 2025Source
  • 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 4 Feb 2025Source
  • 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 4 Feb 2025Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3_compressed (8).pdf · uploaded 4 Feb 2025Source
  • 3 Disclosure of sold/ booked inventorySOLD UNSOLD.pdf · uploaded 4 Feb 2025Source
  • 2 Disclosure of sold/ booked inventorySOLD UNSOLD.pdf · uploaded 4 Feb 2025Source
  • 1 Disclosure of sold/ booked inventorySOLD UNSOLD.pdf · uploaded 4 Feb 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2A.pdf · uploaded 4 Feb 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)SIGNED FORM-2.pdf · uploaded 9 Feb 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)SIGNED FORM 2 Q2.pdf · uploaded 9 Feb 2025Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)SIGNED FORM-2 Q3.pdf · uploaded 9 Feb 2025Source
  • 11 Disclosure of sold/ booked inventorySOLD-UNSOLD Q-4 2023-24.pdf · uploaded 9 Feb 2025Source
  • 10 Disclosure of sold/ booked inventorySOLD-UNSOLD Q-3 2023-24.pdf · uploaded 9 Feb 2025Source
  • 9 Disclosure of sold/ booked inventorySOLD-UNSOLD Q-2 2023-24.pdf · uploaded 9 Feb 2025Source
  • 8 Disclosure of sold/ booked inventorySOLD-UNSOLD Q-1 2023-24.pdf · uploaded 9 Feb 2025Source
  • 7 Disclosure of sold/ booked inventorySOLD-UNSOLD Q-4 2022-23.pdf · uploaded 9 Feb 2025Source
  • 6 Disclosure of sold/ booked inventorySOLD UNSOLD INVENTORY_compressed.pdf · uploaded 9 Feb 2025Source
  • 5 Disclosure of sold/ booked inventorySOLD AND UNSOLD SEP 2022.pdf · uploaded 9 Feb 2025Source
  • 4 Disclosure of sold/ booked inventorySOLD UNSOLD- April 2022 to June 2022.pdf · uploaded 9 Feb 2025Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)SSC_Signed_Form_3_compressed.pdf · uploaded 13 Feb 2025Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)SSC_Signed_Form_3_compressed (2).pdf · uploaded 13 Feb 2025Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)SSC_Signed_Form_3_compressed (1).pdf · uploaded 13 Feb 2025Source
  • Form 1FORM 1.pdf · uploaded 13 Aug 2025Source
  • Form 1FORM 1.pdf · uploaded 13 Aug 2025Source
  • Form 1FORM 1.pdf · uploaded 13 Aug 2025Source
  • Form 1FORM 1.pdf · uploaded 13 Aug 2025Source
  • Form 1FORM 1.pdf · uploaded 13 Aug 2025Source
  • Form 2FORM 2.pdf · uploaded 13 Aug 2025Source
  • Form 2FORM 2.pdf · uploaded 13 Aug 2025Source
  • Form 2F2 sai signature Mar 24 (1).pdf · uploaded 13 Aug 2025Source
  • Form 2FORM 2.pdf · uploaded 13 Aug 2025Source
  • Form 2F2 SEP 23 SS (1).pdf · uploaded 13 Aug 2025Source
  • Form 3FORM 3 SS (1).pdf · uploaded 13 Aug 2025Source
  • Form 3F3 SEP 24 SS (1).pdf · uploaded 13 Aug 2025Source
  • Form 3F3 mar 24 SS (2) (1)_compressed.pdf · uploaded 13 Aug 2025Source
  • Form 3F3 Dec 23 SS (1)_11zon.pdf · uploaded 13 Aug 2025Source
  • Form 3F3 Sep 23 SS (1)_11zon.pdf · uploaded 13 Aug 2025Source
  • Disclosure of Sold and Booked InventorySOLD UNSOLD.pdf · uploaded 13 Aug 2025Source
  • Disclosure of Sold and Booked InventorySOLD UNSOLD.pdf · uploaded 13 Aug 2025Source
  • Disclosure of Sold and Booked InventorySOLD UNSOLD.pdf · uploaded 13 Aug 2025Source
  • Disclosure of Sold and Booked InventorySOLD UNSOLD.pdf · uploaded 13 Aug 2025Source
  • Disclosure of Sold and Booked InventorySOLD UNSOLD.pdf · uploaded 13 Aug 2025Source
  • Form 1FORM 1.pdf · uploaded 14 Aug 2025Source
  • Form 1FORM 1.pdf · uploaded 14 Aug 2025Source
  • Form 2FORM 2.pdf · uploaded 14 Aug 2025Source
  • Form 2FORM 2.pdf · uploaded 14 Aug 2025Source
  • Form 3F3 JUN 24 SS (1)_11zon.pdf · uploaded 14 Aug 2025Source
  • Form 3Form 3 (12) (1).pdf · uploaded 14 Aug 2025Source
  • Disclosure of Sold and Booked InventorySOLD UNSOLD.pdf · uploaded 14 Aug 2025Source
  • Disclosure of Sold and Booked InventorySOLD UNSOLD.pdf · uploaded 14 Aug 2025Source
  • Form 1FORM 1.pdf · uploaded 29 Aug 2025Source
  • Form 2F2 SEP 21.pdf · uploaded 29 Aug 2025Source
  • Form 3F3 SEP 21 SS.pdf · uploaded 29 Aug 2025Source
  • Disclosure of Sold and Booked InventorySOLD UNSOLD SEP 21 SS.pdf · uploaded 29 Aug 2025Source
  • Form 1FORM, 1.pdf · uploaded 30 Aug 2025Source
  • Form 2F2 SEP 22 SS (1).pdf · uploaded 30 Aug 2025Source
  • Form 3F3 Sep 22 SS.pdf · uploaded 30 Aug 2025Source
  • Disclosure of Sold and Booked InventorySOLD UNSOLD (3).pdf · uploaded 30 Aug 2025Source
  • Form 1Form 1 (61).pdf · uploaded 10 Oct 2025Source
  • Form 2Sai Signature March 22(1) (1).pdf · uploaded 10 Oct 2025Source
  • Form 3Form 3 (27).pdf · uploaded 10 Oct 2025Source
  • Disclosure of Sold and Booked InventorySOLD UNSOLD CREARIVES MARCH 2022.pdf · uploaded 10 Oct 2025Source
  • Form 1Form 1.pdf · uploaded 24 Oct 2025Source
  • Form 2Form 2.pdf · uploaded 24 Oct 2025Source
  • Form 3Form 3.pdf · uploaded 24 Oct 2025Source
  • Disclosure of Sold and Booked InventorySold circular.pdf · uploaded 24 Oct 2025Source
  • Withdrawal Update Form 1Form 1 upload.pdf · uploaded 5 Nov 2025Source
  • Withdrawal Update Form 2Form 2 upload.pdf · uploaded 5 Nov 2025Source
  • Withdrawal Update Form 3Form 3 upload final.pdf · uploaded 5 Nov 2025Source
  • Withdrawal Update Form 1Form 1 upload.pdf · uploaded 19 Nov 2025Source
  • Withdrawal Update Form 2Form 2.pdf · uploaded 19 Nov 2025Source
  • Withdrawal Update Form 3Form 3 final upload.pdf · uploaded 19 Nov 2025Source
  • Form 5 (FY 2024-2025)Form 5 upload.pdf · uploaded 19 Nov 2025Source
  • Form 2A (FY 2024-2025)Form 2A upload.pdf · uploaded 19 Dec 2025Source
  • Withdrawal Update Form 1FORM 1 OCT -DEC.pdf · uploaded 18 Jul 2026Source
  • Withdrawal Update Form 2FORM 2 upload.pdf · uploaded 18 Jul 2026Source
  • Withdrawal Update Form 3FORM 3 upload FINAL.pdf · uploaded 18 Jul 2026Source

Technical

  • DocumentLayout.pdf · uploaded 3 Sep 2021Source
  • DocumentPlan 1_compressed (2).pdf · uploaded 4 Sep 2021Source
  • DocumentPlan 2_compressed (1).pdf · uploaded 4 Sep 2021Source
  • DocumentPlan 3_compressed (1).pdf · uploaded 4 Sep 2021Source
  • DocumentPlan 4_compressed (1).pdf · uploaded 4 Sep 2021Source
  • Document1-8 revised SIGNATURE_compressed.pdf · uploaded 27 Feb 2023Source
  • Document5-8 revised_compressed.pdf · uploaded 27 Feb 2023Source
  • Document6-8 SIGNATURE_compressed.pdf · uploaded 27 Feb 2023Source
  • Documentdrrr001_compressed.pdf · uploaded 13 Jul 2023Source
  • Documentdrrr002_compressed.pdf · uploaded 13 Jul 2023Source
  • Documentdrrr003_compressed.pdf · uploaded 13 Jul 2023Source
  • Documentdrrr004_compressed.pdf · uploaded 13 Jul 2023Source
  • Documentdrrr005_compressed.pdf · uploaded 13 Jul 2023Source
  • Documentdrrr006_compressed.pdf · uploaded 13 Jul 2023Source
  • Documentdrrr007_compressed.pdf · uploaded 13 Jul 2023Source
  • Documentdrrr008 (1)_compressed.pdf · uploaded 13 Jul 2023Source

Technical (Architect)

  • DocumentForm 1_compressed.pdf · uploaded 1 Feb 2025Source
  • DocumentForm 1_compressed (2).pdf · uploaded 1 Feb 2025Source
  • DocumentForm 1_compressed.pdf · uploaded 1 Feb 2025Source
  • DocumentForm 1_compressed (4).pdf · uploaded 1 Feb 2025Source
  • DocumentForm 1_compressed (5).pdf · uploaded 1 Feb 2025Source
  • DocumentForm 1_compressed (7).pdf · uploaded 1 Feb 2025Source
  • DocumentForm 1_compressed (8).pdf · uploaded 1 Feb 2025Source
  • DocumentForm 1_compressed (10).pdf · uploaded 1 Feb 2025Source
  • DocumentForm 1_compressed (11).pdf · uploaded 1 Feb 2025Source
  • DocumentForm 1_compressed (12).pdf · uploaded 3 Feb 2025Source
  • DocumentForm 1.pdf · uploaded 4 Feb 2025Source
  • DocumentForm 1.pdf · uploaded 4 Feb 2025Source
  • DocumentFORM 1 OCT -DEC.pdf · uploaded 24 Apr 2026Source

Technical (Engineer)

  • DocumentSIGNED FORM-2.pdf · uploaded 9 Feb 2025Source
  • DocumentSIGNED FORM 2 Q2.pdf · uploaded 9 Feb 2025Source
  • DocumentSIGNED FORM-2 Q3.pdf · uploaded 9 Feb 2025Source
  • DocumentFORM 2 upload.pdf · uploaded 18 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Mamurdi, Haveli taluka

Survey, CTS, gat or plot numbers

6/3/36/3/3/16/3/3/26/3/3/3 MAMURDISR. NO.6/4 P

Boundaries

North
By Survey No 6 Hissa No 3 Part
South
By Survey No 6 Hissa No 3
East
By Survey No 6 Part And Road
West
By Survey No 8

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectLandmark Design Group—
Chartered accountantSumeet Suresh Kate And Co—
EngineerAbhishek Chintamani—
EngineerIndrajeet Chauhan—
EngineerRohinee Badgujar—
OtherRangnath Bhojgude—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology