Sai Signature
Certificate SignedMamurdi, Pune 412101 |Promoter: Shree Sai Creatives
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Buildings
- 4
- Unit types
- 2BHK, 3BHK237 units in all
- Address
- Sr. No.6/4 P, 6/3/3, 6/3/3/1, 6/3/3/2, 6/3/3/3 MamurdiPIN 412101
- Designated bank account
- 171
- Developed in phases
- Yes
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion pushed back 4 months
- Registered
- 13 Sep 2021
- Promised
- 30 Sep 2026
- Revised
- 30 Jan 2027
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100030759 | 13 Sep 2021 | 30 Sep 2026 | 30 Jan 2027 | Shree Sai Creatives | Project page |
4 buildings
Buildings and wings named in the registration
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
75 of 237 units booked (32%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Wing A | 2BHK | 63.24 sq m · 681 sq ft | 2 | 0 |
| Wing A | 2BHK | 64.99 sq m · 700 sq ft | 14 | 0 |
| Wing A | 2BHK | 69.52 sq m · 748 sq ft | 15 | 0 |
| Wing A | 2BHK | 75.61 sq m · 814 sq ft | 2 | 0 |
| Wing A | 2BHK | 78.57 sq m · 846 sq ft | 12 | 0 |
| Wing A | 3BHK | 97.47 sq m · 1,049 sq ft | 13 | 0 |
| Wing B | 2BHK | 66.21 sq m · 713 sq ft | 2 | 0 |
| Wing B | 2BHK | 66.37 sq m · 714 sq ft | 14 | 0 |
Show all 23 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Wing B | 2BHK | 68.79 sq m · 740 sq ft | 1 | 0 |
| Wing B | 2BHK | 68.89 sq m · 742 sq ft | 14 | 0 |
| Wing B | 2BHK | 70.42 sq m · 758 sq ft | 2 | 0 |
| Wing B | 2BHK | 71.6 sq m · 771 sq ft | 12 | 0 |
| Wing B | 2BHK | 71.9 sq m · 774 sq ft | 1 | 0 |
| Wing B | 3BHK | 92.88 sq m · 1,000 sq ft | 13 | 0 |
| Wing C | 2BHK | 68.79 sq m · 740 sq ft | 15 | 9 |
| Wing C | 2BHK | 69.63 sq m · 749 sq ft | 15 | 7 |
| Wing C | 2BHK | 73.77 sq m · 794 sq ft | 15 | 10 |
| Wing C | 3BHK | 95.39 sq m · 1,027 sq ft | 15 | 6 |
| Wing D | 2BHK | 69.65 sq m · 750 sq ft | 15 | 9 |
| Wing D | 2BHK | 73.02 sq m · 786 sq ft | 2 | 2 |
| Wing D | 2BHK | 73.84 sq m · 795 sq ft | 15 | 11 |
| Wing D | 3BHK | 98.48 sq m · 1,060 sq ft | 13 | 10 |
| Wing D | 3BHK | 99.36 sq m · 1,070 sq ft | 15 | 11 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
1 document held by Deedo, 161 filings listed on MahaRERA's project page
Finance
- PAN CardSHREE SAI CREATIVE PAN NO.PDF · uploaded 3 Sep 2021Source
Legal
Migrated
- 1 PAN CardSHREE SAI CREATIVE PAN NO.PDF · uploaded 3 Sep 2021Source
- 1 Copy of the legal title reportLegal Search Report_compressed.pdf · uploaded 3 Sep 2021Source
- 1 Details of encumbrancesNO ENCUMBRANCE CERTIFICATE (1).pdf · uploaded 3 Sep 2021Source
- 1 Copy of Layout Approval (in case of layout)Layout.pdf · uploaded 3 Sep 2021Source
Show all 162 documentsShow fewer documents
Migrated
- 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate_compressed (2).pdf · uploaded 3 Sep 2021Source
- 1 Declaration about Commencement CertificateFormat D - commencement declaration.pdf · uploaded 3 Sep 2021Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 ARCHITECT CERTIFICATE CREATIVES_compressed.pdf · uploaded 3 Sep 2021Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FROM 2 ENGI CERTIFCATE.pdf · uploaded 3 Sep 2021Source
- 1 Proforma of Allotment letterAGREEMENT DRAFT.pdf · uploaded 3 Sep 2021Source
- 2 Proforma of Allotment letterALLOTMENT LETTER.pdf · uploaded 3 Sep 2021Source
- 1 Building Plan Approval / NA Order for plotted developmentPlan 1_compressed (2).pdf · uploaded 4 Sep 2021Source
- 2 Building Plan Approval / NA Order for plotted developmentPlan 2_compressed (1).pdf · uploaded 4 Sep 2021Source
- 3 Building Plan Approval / NA Order for plotted developmentPlan 3_compressed (1).pdf · uploaded 4 Sep 2021Source
- 4 Building Plan Approval / NA Order for plotted developmentPlan 4_compressed (1).pdf · uploaded 4 Sep 2021Source
- 1 Declaration in FORM BDECLATION BY PROMOTERS - CREATIVES_compressed (1).pdf · uploaded 4 Sep 2021Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 4 Sep 2021Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 SAI SIGNATURE_compressed.pdf · uploaded 29 Jul 2022Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 SHREE SAI CREATIVES_compressed.pdf · uploaded 1 Sep 2022Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 SHREE SAI CREATIVES march 2022.pdf · uploaded 1 Sep 2022Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)FORM 2A CREARTIVES MARCH 2022.pdf · uploaded 1 Sep 2022Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)3 CA CERTIFICATE MARCH 2022 CREATIVES_compressed.pdf · uploaded 1 Sep 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)FORM -5 Sai Signature 2021-2022.pdf · uploaded 24 Nov 2022Source
- 5 Building Plan Approval / NA Order for plotted development1-8 revised SIGNATURE_compressed.pdf · uploaded 27 Feb 2023Source
- 6 Building Plan Approval / NA Order for plotted development5-8 revised_compressed.pdf · uploaded 27 Feb 2023Source
- 7 Building Plan Approval / NA Order for plotted development6-8 SIGNATURE_compressed.pdf · uploaded 27 Feb 2023Source
- 8 Building Plan Approval / NA Order for plotted developmentdrrr001_compressed.pdf · uploaded 13 Jul 2023Source
- 9 Building Plan Approval / NA Order for plotted developmentdrrr002_compressed.pdf · uploaded 13 Jul 2023Source
- 10 Building Plan Approval / NA Order for plotted developmentdrrr003_compressed.pdf · uploaded 13 Jul 2023Source
- 11 Building Plan Approval / NA Order for plotted developmentdrrr004_compressed.pdf · uploaded 13 Jul 2023Source
- 12 Building Plan Approval / NA Order for plotted developmentdrrr005_compressed.pdf · uploaded 13 Jul 2023Source
- 13 Building Plan Approval / NA Order for plotted developmentdrrr006_compressed.pdf · uploaded 13 Jul 2023Source
- 14 Building Plan Approval / NA Order for plotted developmentdrrr007_compressed.pdf · uploaded 13 Jul 2023Source
- 15 Building Plan Approval / NA Order for plotted developmentdrrr008 (1)_compressed.pdf · uploaded 13 Jul 2023Source
- 2 Commencement Certificates / NA Order for plotted developmentNEW CC.pdf · uploaded 13 Jul 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)shree sai creative form 5 TILL MARCH 2023.pdf · uploaded 26 Mar 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_compressed (2).pdf · uploaded 1 Feb 2025Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_compressed.pdf · uploaded 1 Feb 2025Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_compressed (4).pdf · uploaded 1 Feb 2025Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_compressed (5).pdf · uploaded 1 Feb 2025Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_compressed (7).pdf · uploaded 1 Feb 2025Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_compressed (8).pdf · uploaded 1 Feb 2025Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_compressed (10).pdf · uploaded 1 Feb 2025Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_compressed (11).pdf · uploaded 1 Feb 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_compressed.pdf · uploaded 1 Feb 2025Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_compressed (12).pdf · uploaded 3 Feb 2025Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_compressed (4).pdf · uploaded 3 Feb 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_compressed (3).pdf · uploaded 3 Feb 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_compressed (2).pdf · uploaded 3 Feb 2025Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_compressed (6).pdf · uploaded 3 Feb 2025Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 4 Feb 2025Source
- 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 4 Feb 2025Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3_compressed (8).pdf · uploaded 4 Feb 2025Source
- 3 Disclosure of sold/ booked inventorySOLD UNSOLD.pdf · uploaded 4 Feb 2025Source
- 2 Disclosure of sold/ booked inventorySOLD UNSOLD.pdf · uploaded 4 Feb 2025Source
- 1 Disclosure of sold/ booked inventorySOLD UNSOLD.pdf · uploaded 4 Feb 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2A.pdf · uploaded 4 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)SIGNED FORM-2.pdf · uploaded 9 Feb 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)SIGNED FORM 2 Q2.pdf · uploaded 9 Feb 2025Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)SIGNED FORM-2 Q3.pdf · uploaded 9 Feb 2025Source
- 11 Disclosure of sold/ booked inventorySOLD-UNSOLD Q-4 2023-24.pdf · uploaded 9 Feb 2025Source
- 10 Disclosure of sold/ booked inventorySOLD-UNSOLD Q-3 2023-24.pdf · uploaded 9 Feb 2025Source
- 9 Disclosure of sold/ booked inventorySOLD-UNSOLD Q-2 2023-24.pdf · uploaded 9 Feb 2025Source
- 8 Disclosure of sold/ booked inventorySOLD-UNSOLD Q-1 2023-24.pdf · uploaded 9 Feb 2025Source
- 7 Disclosure of sold/ booked inventorySOLD-UNSOLD Q-4 2022-23.pdf · uploaded 9 Feb 2025Source
- 6 Disclosure of sold/ booked inventorySOLD UNSOLD INVENTORY_compressed.pdf · uploaded 9 Feb 2025Source
- 5 Disclosure of sold/ booked inventorySOLD AND UNSOLD SEP 2022.pdf · uploaded 9 Feb 2025Source
- 4 Disclosure of sold/ booked inventorySOLD UNSOLD- April 2022 to June 2022.pdf · uploaded 9 Feb 2025Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)SSC_Signed_Form_3_compressed.pdf · uploaded 13 Feb 2025Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)SSC_Signed_Form_3_compressed (2).pdf · uploaded 13 Feb 2025Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)SSC_Signed_Form_3_compressed (1).pdf · uploaded 13 Feb 2025Source
- Form 1FORM 1.pdf · uploaded 13 Aug 2025Source
- Form 1FORM 1.pdf · uploaded 13 Aug 2025Source
- Form 1FORM 1.pdf · uploaded 13 Aug 2025Source
- Form 1FORM 1.pdf · uploaded 13 Aug 2025Source
- Form 1FORM 1.pdf · uploaded 13 Aug 2025Source
- Form 2FORM 2.pdf · uploaded 13 Aug 2025Source
- Form 2FORM 2.pdf · uploaded 13 Aug 2025Source
- Form 2F2 sai signature Mar 24 (1).pdf · uploaded 13 Aug 2025Source
- Form 2FORM 2.pdf · uploaded 13 Aug 2025Source
- Form 2F2 SEP 23 SS (1).pdf · uploaded 13 Aug 2025Source
- Form 3FORM 3 SS (1).pdf · uploaded 13 Aug 2025Source
- Form 3F3 SEP 24 SS (1).pdf · uploaded 13 Aug 2025Source
- Form 3F3 mar 24 SS (2) (1)_compressed.pdf · uploaded 13 Aug 2025Source
- Form 3F3 Dec 23 SS (1)_11zon.pdf · uploaded 13 Aug 2025Source
- Form 3F3 Sep 23 SS (1)_11zon.pdf · uploaded 13 Aug 2025Source
- Disclosure of Sold and Booked InventorySOLD UNSOLD.pdf · uploaded 13 Aug 2025Source
- Disclosure of Sold and Booked InventorySOLD UNSOLD.pdf · uploaded 13 Aug 2025Source
- Disclosure of Sold and Booked InventorySOLD UNSOLD.pdf · uploaded 13 Aug 2025Source
- Disclosure of Sold and Booked InventorySOLD UNSOLD.pdf · uploaded 13 Aug 2025Source
- Disclosure of Sold and Booked InventorySOLD UNSOLD.pdf · uploaded 13 Aug 2025Source
- Form 1FORM 1.pdf · uploaded 14 Aug 2025Source
- Form 1FORM 1.pdf · uploaded 14 Aug 2025Source
- Form 2FORM 2.pdf · uploaded 14 Aug 2025Source
- Form 2FORM 2.pdf · uploaded 14 Aug 2025Source
- Form 3F3 JUN 24 SS (1)_11zon.pdf · uploaded 14 Aug 2025Source
- Form 3Form 3 (12) (1).pdf · uploaded 14 Aug 2025Source
- Disclosure of Sold and Booked InventorySOLD UNSOLD.pdf · uploaded 14 Aug 2025Source
- Disclosure of Sold and Booked InventorySOLD UNSOLD.pdf · uploaded 14 Aug 2025Source
- Form 1FORM 1.pdf · uploaded 29 Aug 2025Source
- Form 2F2 SEP 21.pdf · uploaded 29 Aug 2025Source
- Form 3F3 SEP 21 SS.pdf · uploaded 29 Aug 2025Source
- Disclosure of Sold and Booked InventorySOLD UNSOLD SEP 21 SS.pdf · uploaded 29 Aug 2025Source
- Form 1FORM, 1.pdf · uploaded 30 Aug 2025Source
- Form 2F2 SEP 22 SS (1).pdf · uploaded 30 Aug 2025Source
- Form 3F3 Sep 22 SS.pdf · uploaded 30 Aug 2025Source
- Disclosure of Sold and Booked InventorySOLD UNSOLD (3).pdf · uploaded 30 Aug 2025Source
- Form 1Form 1 (61).pdf · uploaded 10 Oct 2025Source
- Form 2Sai Signature March 22(1) (1).pdf · uploaded 10 Oct 2025Source
- Form 3Form 3 (27).pdf · uploaded 10 Oct 2025Source
- Disclosure of Sold and Booked InventorySOLD UNSOLD CREARIVES MARCH 2022.pdf · uploaded 10 Oct 2025Source
- Form 1Form 1.pdf · uploaded 24 Oct 2025Source
- Form 2Form 2.pdf · uploaded 24 Oct 2025Source
- Form 3Form 3.pdf · uploaded 24 Oct 2025Source
- Disclosure of Sold and Booked InventorySold circular.pdf · uploaded 24 Oct 2025Source
- Withdrawal Update Form 1Form 1 upload.pdf · uploaded 5 Nov 2025Source
- Withdrawal Update Form 2Form 2 upload.pdf · uploaded 5 Nov 2025Source
- Withdrawal Update Form 3Form 3 upload final.pdf · uploaded 5 Nov 2025Source
- Withdrawal Update Form 1Form 1 upload.pdf · uploaded 19 Nov 2025Source
- Withdrawal Update Form 2Form 2.pdf · uploaded 19 Nov 2025Source
- Withdrawal Update Form 3Form 3 final upload.pdf · uploaded 19 Nov 2025Source
- Form 5 (FY 2024-2025)Form 5 upload.pdf · uploaded 19 Nov 2025Source
- Form 2A (FY 2024-2025)Form 2A upload.pdf · uploaded 19 Dec 2025Source
- Withdrawal Update Form 1FORM 1 OCT -DEC.pdf · uploaded 18 Jul 2026Source
- Withdrawal Update Form 2FORM 2 upload.pdf · uploaded 18 Jul 2026Source
- Withdrawal Update Form 3FORM 3 upload FINAL.pdf · uploaded 18 Jul 2026Source
Technical
- DocumentLayout.pdf · uploaded 3 Sep 2021Source
- DocumentPlan 1_compressed (2).pdf · uploaded 4 Sep 2021Source
- DocumentPlan 2_compressed (1).pdf · uploaded 4 Sep 2021Source
- DocumentPlan 3_compressed (1).pdf · uploaded 4 Sep 2021Source
- DocumentPlan 4_compressed (1).pdf · uploaded 4 Sep 2021Source
- Document1-8 revised SIGNATURE_compressed.pdf · uploaded 27 Feb 2023Source
- Document5-8 revised_compressed.pdf · uploaded 27 Feb 2023Source
- Document6-8 SIGNATURE_compressed.pdf · uploaded 27 Feb 2023Source
- Documentdrrr001_compressed.pdf · uploaded 13 Jul 2023Source
- Documentdrrr002_compressed.pdf · uploaded 13 Jul 2023Source
- Documentdrrr003_compressed.pdf · uploaded 13 Jul 2023Source
- Documentdrrr004_compressed.pdf · uploaded 13 Jul 2023Source
- Documentdrrr005_compressed.pdf · uploaded 13 Jul 2023Source
- Documentdrrr006_compressed.pdf · uploaded 13 Jul 2023Source
- Documentdrrr007_compressed.pdf · uploaded 13 Jul 2023Source
- Documentdrrr008 (1)_compressed.pdf · uploaded 13 Jul 2023Source
Technical (Architect)
- DocumentForm 1_compressed.pdf · uploaded 1 Feb 2025Source
- DocumentForm 1_compressed (2).pdf · uploaded 1 Feb 2025Source
- DocumentForm 1_compressed.pdf · uploaded 1 Feb 2025Source
- DocumentForm 1_compressed (4).pdf · uploaded 1 Feb 2025Source
- DocumentForm 1_compressed (5).pdf · uploaded 1 Feb 2025Source
- DocumentForm 1_compressed (7).pdf · uploaded 1 Feb 2025Source
- DocumentForm 1_compressed (8).pdf · uploaded 1 Feb 2025Source
- DocumentForm 1_compressed (10).pdf · uploaded 1 Feb 2025Source
- DocumentForm 1_compressed (11).pdf · uploaded 1 Feb 2025Source
- DocumentForm 1_compressed (12).pdf · uploaded 3 Feb 2025Source
- DocumentForm 1.pdf · uploaded 4 Feb 2025Source
- DocumentForm 1.pdf · uploaded 4 Feb 2025Source
- DocumentFORM 1 OCT -DEC.pdf · uploaded 24 Apr 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Mamurdi, Haveli taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- By Survey No 6 Hissa No 3 Part
- South
- By Survey No 6 Hissa No 3
- East
- By Survey No 6 Part And Road
- West
- By Survey No 8
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Landmark Design Group | — |
| Chartered accountant | Sumeet Suresh Kate And Co | — |
| Engineer | Abhishek Chintamani | — |
| Engineer | Indrajeet Chauhan | — |
| Engineer | Rohinee Badgujar | — |
| Other | Rangnath Bhojgude | — |
Source: MahaRERA project page. Contact details are not shown.
