Skip to content

Snehshilp

Certificate Signed

Kothrud, Pune 411038 |Promoter: Belvalkar Housing LLP

Residential / Group HousingRERAP52100045593
24 May 2022Registered with MahaRERA
31 Dec 2026Promised completion
30 Apr 2027Revised completionPushed back 4 months
1Building
43Units registered36 booked (84%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Buildings
1
Unit types
2.5 BHK, 2BHK, 3BHK, Shop43 units in all
Address
Plot no 54, Survey No 120, CTS No 938, Modern Colony, Shivteerth Nagar, KothrudPIN 411038
Designated bank account
82
Developed in phases
No

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 18.51187, 73.80922
Snehshilp is at latitude 18.51187, longitude 73.80922.

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 4 months

Registered
24 May 2022
Promised
31 Dec 2026
Revised
30 Apr 2027

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210004559324 May 202231 Dec 202630 Apr 2027Belvalkar Housing LLPProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Snehshilp1343

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

36 of 43 units booked (84%), as the promoter reported to MahaRERA

2.5 BHK · 14 units2BHK · 22 units3BHK · 6 unitsShop · 1 unit
TypeCarpet areaUnitsBooked
2.5 BHK1.27 sq m · 14 sq ft11
2.5 BHK2.59 sq m · 28 sq ft22
2.5 BHK3.85 sq m · 41 sq ft11
2.5 BHK31.79 sq m · 342 sq ft11
2.5 BHK83.17 sq m · 895 sq ft88
2.5 BHK90.85 sq m · 978 sq ft10
2BHK4.63 sq m · 50 sq ft33
2BHK6.33 sq m · 68 sq ft11
Show all 23 unit rowsShow fewer unit rows
TypeCarpet areaUnitsBooked
2BHK6.73 sq m · 72 sq ft11
2BHK7.59 sq m · 82 sq ft22
2BHK7.99 sq m · 86 sq ft11
2BHK11.5 sq m · 124 sq ft33
2BHK11.73 sq m · 126 sq ft11
2BHK12.42 sq m · 134 sq ft11
2BHK15.63 sq m · 168 sq ft33
2BHK57.98 sq m · 624 sq ft11
2BHK64.34 sq m · 693 sq ft33
2BHK67.37 sq m · 725 sq ft10
2BHK78.69 sq m · 847 sq ft10
3BHK17.2 sq m · 185 sq ft11
3BHK96.53 sq m · 1,039 sq ft21
3BHK97.15 sq m · 1,046 sq ft30
Shop2.56 sq m · 28 sq ft11

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

2 documents held by Deedo, 135 filings listed on MahaRERA's project page

Extension certificate

Registration certificate

Finance

  • PAN CardSSB PAN.pdf · uploaded 11 Apr 2022Source

Legal

  • Legal Title reportTSR Snehshilp final.pdf · uploaded 11 May 2022Source
  • Declaration Form BAffidavit final2.pdf · uploaded 13 May 2022Source

Migrated

  • 1 PAN CardSSB PAN.pdf · uploaded 11 Apr 2022Source
  • 1 Details of encumbrancesNo encumbrances letter.pdf · uploaded 11 Apr 2022Source
  • 1 Copy of Layout Approval (in case of layout)Snehashilpa Sanctioned plan 1.pdf · uploaded 11 Apr 2022Source
Show all 137 documentsShow fewer documents

Migrated

  • 1 Building Plan Approval / NA Order for plotted developmentSnehashilpa Sanctioned plan 1.pdf · uploaded 11 Apr 2022Source
  • 2 Building Plan Approval / NA Order for plotted developmentSnehashilpa sanctioned plan 2.pdf · uploaded 11 Apr 2022Source
  • 1 Commencement Certificates / NA Order for plotted developmentSnehashilpa CC_compressed.pdf · uploaded 11 Apr 2022Source
  • 1 Declaration about Commencement CertificateDeclaration about commencement certificate.pdf · uploaded 11 Apr 2022Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate.pdf · uploaded 11 Apr 2022Source
  • 1 CERSAI detailsCERSAI_Search_Report_200234956305_For_Asset_Based_Search_11_04_2022_13_37_03_362.pdf · uploaded 11 Apr 2022Source
  • 1 Proforma of Allotment letterAllotment Letter.pdf · uploaded 11 Apr 2022Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA certificate.pdf · uploaded 15 Apr 2022Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate.pdf · uploaded 29 Apr 2022Source
  • 1 Copy of the legal title reportTSR Snehshilp final.pdf · uploaded 11 May 2022Source
  • 1 Declaration in FORM BAffidavit final2.pdf · uploaded 13 May 2022Source
  • 2 Proforma of Allotment letterAgreement to sale.pdf · uploaded 13 May 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)CA Certificate_Snehshilp.pdf · uploaded 7 Jan 2023Source
  • 3 Building Plan Approval / NA Order for plotted developmentC C RV.pdf · uploaded 18 Mar 2023Source
  • 4 Building Plan Approval / NA Order for plotted development1 RV.pdf · uploaded 18 Mar 2023Source
  • 5 Building Plan Approval / NA Order for plotted development2 RV.pdf · uploaded 18 Mar 2023Source
  • 6 Building Plan Approval / NA Order for plotted development3 RV.pdf · uploaded 18 Mar 2023Source
  • 7 Building Plan Approval / NA Order for plotted development4 RV.pdf · uploaded 18 Mar 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate_Snehshilp.pdf · uploaded 20 Mar 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Quality assurance certificate_Snehshilp.pdf · uploaded 20 Mar 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate.pdf · uploaded 25 Mar 2023Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate.pdf · uploaded 25 Mar 2023Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Quality assurance certificate_Snehshilp.pdf · uploaded 25 Mar 2023Source
  • 1 Disclosure of sold/ booked inventorySnehsilp Revised RERA.pdf · uploaded 27 Mar 2023Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate.pdf · uploaded 28 Mar 2023Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)RERA Architect Certi for Snehshilp project.pdf · uploaded 21 Nov 2023Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)RERA Engg Certi For Snehshilp project.pdf · uploaded 21 Nov 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)RERA Quality Assurance Certi for snehshilp project.pdf · uploaded 21 Nov 2023Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3 snehshilp_Sept 2023.pdf · uploaded 21 Nov 2023Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3 snehshilp_Sept 2023.pdf · uploaded 21 Nov 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)FROM 5 Snehshilp.pdf · uploaded 6 Dec 2023Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 SNEHSHILP20231206_15413759.pdf · uploaded 7 Dec 2023Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)ANNEXURE C FORM 2 SNEHSHILP .pdf · uploaded 7 Dec 2023Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)ANNEXURE B FORM 2 SNEHSHILP20231206_15401381.pdf · uploaded 7 Dec 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)ANNEXURE B FORM 2 SNEHSHILP20231206_15401381.pdf · uploaded 7 Dec 2023Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)ANNEXURE C FORM 2 SNEHSHILP .pdf · uploaded 7 Dec 2023Source
  • 2 Disclosure of sold/ booked inventoryFORM 1 SNEHSHILP20231206_15413759.pdf · uploaded 7 Dec 2023Source
  • 3 Disclosure of sold/ booked inventoryFORMAT A SNEHSHILP20231206_15342939.pdf · uploaded 7 Dec 2023Source
  • 4 Disclosure of sold/ booked inventoryFORMAT A SNEHSHILP20231206_15342939.pdf · uploaded 7 Dec 2023Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)ANNEXURE F FORM 4 SNEHSHILP .pdf · uploaded 7 Dec 2023Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)ANNEXURE D SNEHSHILP .pdf · uploaded 7 Dec 2023Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)ANNEXURE D SNEHSHILP .pdf · uploaded 7 Dec 2023Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form3 Snehashilp.pdf · uploaded 5 Feb 2024Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)SNEHSHILP_ARCH20240203_18215330.pdf · uploaded 8 Feb 2024Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)SNEHSHILP_ENGG20240203_18230223.pdf · uploaded 8 Feb 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM_01_SNEHSHILP_MAR'24.pdf · uploaded 10 Mar 2025Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 01_ARCH_SNEHSHILP_JUNE'24.pdf · uploaded 10 Mar 2025Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 01_ARCH_SNEHSHILP_SEPT'24.pdf · uploaded 10 Mar 2025Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM_01_SNEHSHILP_DEC'24.pdf · uploaded 10 Mar 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 02_SNEHSHILP_MAR'24.pdf · uploaded 10 Mar 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 02_SNEHSHILP_JUN'24.pdf · uploaded 10 Mar 2025Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 02_SNEHSHILP_SEPT'24.pdf · uploaded 10 Mar 2025Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 02_SNEHSHILP_DEC'24.pdf · uploaded 10 Mar 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Snehship Mar 24 F3.pdf · uploaded 22 Mar 2025Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Snehshilp Jun 24 F3.pdf · uploaded 22 Mar 2025Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Snehship Sep 24 F3.pdf · uploaded 22 Mar 2025Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Snehship Dec 24 F3.pdf · uploaded 22 Mar 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2A SNEHSHILP.pdf · uploaded 22 Mar 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Snehshilp F5 23-24.pdf · uploaded 22 Mar 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM_01_SNEHSHILP_MAR'25.pdf · uploaded 6 May 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 SNEHASHILP MARCH 2025.pdf · uploaded 6 May 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM_02_SNEHSHIP_MAR'25.pdf · uploaded 6 May 2025Source
  • 1 Disclosure of sold/ booked inventoryDISCOLSURE OF SOLD -SNEHASHILP-MARCH 2025.pdf · uploaded 6 May 2025Source
  • Withdrawal Update Form 1March 25 form 1 snehshilp.pdf · uploaded 24 Jun 2025Source
  • Withdrawal Update Form 2March form 2 snehshilp.pdf · uploaded 24 Jun 2025Source
  • Withdrawal Update Form 3Final March 25 Snehshilp.pdf · uploaded 24 Jun 2025Source
  • Form 5 (FY 2024-2025)Snehshilp Form-5 24-25.pdf · uploaded 29 Sep 2025Source
  • Form 1Form 1 march 25 snehshilp.pdf · uploaded 20 Nov 2025Source
  • Form 2FORM_02_SNEHSHIP_MAR'25.pdf · uploaded 20 Nov 2025Source
  • Form 3FORM 03 march 25.pdf · uploaded 20 Nov 2025Source
  • Disclosure of Sold and Booked Inventorysold disclosure snehshilp march 25.pdf · uploaded 20 Nov 2025Source
  • Form 1FORM_01_SNEHSHILP_MAR'24.pdf · uploaded 21 Nov 2025Source
  • Form 1FORM 01_ARCH_SNEHSHILP_JUNE'24.pdf · uploaded 21 Nov 2025Source
  • Form 1FORM 01_ARCH_SNEHSHILP_SEPT'24.pdf · uploaded 21 Nov 2025Source
  • Form 1FORM_01_SNEHSHILP_DEC'24.pdf · uploaded 21 Nov 2025Source
  • Form 2FORM 02_SNEHSHILP_MAR'24.pdf · uploaded 21 Nov 2025Source
  • Form 2FORM 02_SNEHSHILP_JUN'24.pdf · uploaded 21 Nov 2025Source
  • Form 2FORM 02_SNEHSHILP_SEPT'24.pdf · uploaded 21 Nov 2025Source
  • Form 2FORM 02_SNEHSHILP_DEC'24.pdf · uploaded 21 Nov 2025Source
  • Form 3Snehship Mar 24 F3.pdf · uploaded 21 Nov 2025Source
  • Form 3Snehshilp Jun 24 F3.pdf · uploaded 21 Nov 2025Source
  • Form 3Snehship Sep 24 F3.pdf · uploaded 21 Nov 2025Source
  • Form 3Snehship Dec 24 F3.pdf · uploaded 21 Nov 2025Source
  • Disclosure of Sold and Booked InventoryDISCLOSURE OF SOLD- SNEHASHILP MARCH 2024.pdf · uploaded 21 Nov 2025Source
  • Disclosure of Sold and Booked InventoryDISCLOSURE OF SOLD- SNEHASHILP JUNE 2024.pdf · uploaded 21 Nov 2025Source
  • Disclosure of Sold and Booked InventoryDISCLOSURE OF SOLD- SNEHASHILP SEPT 2024.pdf · uploaded 21 Nov 2025Source
  • Disclosure of Sold and Booked InventoryDISCLOSURE OF SOLD- SNEHASHILP DEC 2024.pdf · uploaded 21 Nov 2025Source
  • Withdrawal Update Form 1FORM_01_SNEHSHILP_JUNu002725 (1).pdf · uploaded 26 Nov 2025Source
  • Withdrawal Update Form 2FORM 02_SNEHSHILP_JUNu002725 (2).pdf · uploaded 26 Nov 2025Source
  • Withdrawal Update Form 3FORM 3 SNEHSHILP Jun-25.pdf · uploaded 26 Nov 2025Source
  • Withdrawal Update Form 1FORM01_SNEHSHILP_SEPTu002725.pdf · uploaded 28 Nov 2025Source
  • Withdrawal Update Form 2FORM_02_SNEHSHILP_SEPTu002725.pdf · uploaded 28 Nov 2025Source
  • Withdrawal Update Form 3FORM 3 SNEHSHILP SEPT 2025.pdf · uploaded 28 Nov 2025Source
  • Form 2A (FY 2024-2025)FORM 02A SNEHSHILP MAR 25.pdf · uploaded 26 Dec 2025Source
  • Withdrawal Update Form 1FORM01 SNEHSHILP _DEC 25.pdf · uploaded 31 Jan 2026Source
  • Withdrawal Update Form 2FORM_02 SNEHSHILP_DEC25.pdf · uploaded 31 Jan 2026Source
  • Withdrawal Update Form 3FORM 3 DEC 2025 -SNEHASHILP.pdf · uploaded 31 Jan 2026Source
  • Withdrawal Update Form 1FORM_01_SNEHSHILP_MAR26.pdf · uploaded 28 Jul 2026Source
  • Withdrawal Update Form 1FORM 01 SNEHSHILP JUN 26.pdf · uploaded 28 Jul 2026Source
  • Withdrawal Update Form 2FORM_02_SNEHSHILP_MAR 26.pdf · uploaded 28 Jul 2026Source
  • Withdrawal Update Form 2FORM 02 SNEHASHILP JUN 26.pdf · uploaded 28 Jul 2026Source
  • Withdrawal Update Form 3FORM 3 MARCH 26 SNEHSHILP.pdf · uploaded 28 Jul 2026Source
  • Withdrawal Update Form 3FORM 3 SNEHSHILP JUNE 26.pdf · uploaded 28 Jul 2026Source
  • Form 2A (FY 2025-2026)FORM_02A_SNEHSHILP_MAR 26.pdf · uploaded 12 Aug 2026Source
  • Form 5 (FY 2025-2026)Snehshilp FORM_5_2025-26.pdf · uploaded 26 Sep 2026Source

Technical

  • DocumentSnehashilpa Sanctioned plan 1.pdf · uploaded 11 Apr 2022Source
  • DocumentSnehashilpa Sanctioned plan 1.pdf · uploaded 11 Apr 2022Source
  • DocumentSnehashilpa sanctioned plan 2.pdf · uploaded 11 Apr 2022Source
  • DocumentC C RV.pdf · uploaded 18 Mar 2023Source
  • Document1 RV.pdf · uploaded 18 Mar 2023Source
  • Document2 RV.pdf · uploaded 18 Mar 2023Source
  • Document3 RV.pdf · uploaded 18 Mar 2023Source
  • Document4 RV.pdf · uploaded 18 Mar 2023Source
  • DocumentLayout 01_11zon (1).pdf · uploaded 18 Aug 2026Source
  • DocumentPlan 02_11zon.pdf · uploaded 18 Aug 2026Source
  • DocumentPlan 03_11zon.pdf · uploaded 18 Aug 2026Source
  • DocumentPlan 04_11zon.pdf · uploaded 18 Aug 2026Source

Technical (Architect)

  • DocumentFORM_01_SNEHSHILP_MAR'24.pdf · uploaded 10 Mar 2025Source
  • DocumentFORM 01_ARCH_SNEHSHILP_JUNE'24.pdf · uploaded 10 Mar 2025Source
  • DocumentFORM 01_ARCH_SNEHSHILP_SEPT'24.pdf · uploaded 10 Mar 2025Source
  • DocumentFORM_01_SNEHSHILP_DEC'24.pdf · uploaded 10 Mar 2025Source
  • DocumentFORM_01_SNEHSHILP_MAR'25.pdf · uploaded 6 May 2025Source
  • DocumentFORM 01 SNEHSHILP JUN 26.pdf · uploaded 28 Jul 2026Source

Technical (Engineer)

  • DocumentFORM 02_SNEHSHILP_MAR'24.pdf · uploaded 10 Mar 2025Source
  • DocumentFORM 02_SNEHSHILP_JUN'24.pdf · uploaded 10 Mar 2025Source
  • DocumentFORM 02_SNEHSHILP_SEPT'24.pdf · uploaded 10 Mar 2025Source
  • DocumentFORM 02_SNEHSHILP_DEC'24.pdf · uploaded 10 Mar 2025Source
  • DocumentFORM_02_SNEHSHIP_MAR'25.pdf · uploaded 6 May 2025Source
  • DocumentFORM 02 SNEHASHILP JUN 26.pdf · uploaded 28 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Kothrud, Haveli taluka

Survey, CTS, gat or plot numbers

CTS No 938Plot no 54Survey No 120

Boundaries

North
Plot no 55
South
Plot no 53
East
30 feet Road
West
Survey no 117

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAR Ajay Amle—
ArchitectSiddharth Harischandrakar—
Chartered accountantPrakash Bilimoriya—
EngineerMubaraka Asif Pathan—
EngineerPooja Ashish Deshpande—
EngineerVivek Chavan—
Registered real estate agentKedar Subhash Pathak—
Registered real estate agentNitin Devidas Kandelkar—
Show all 11 professionalsShow fewer professionals
RoleNameRegistration no.
Registered real estate agentPallavi Pankaj Kolhe—
Registered real estate agentSurhuda Ravindra Khodke—
Registered real estate agentVivek Vinayak Bidnur—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology