Mayura
Certificate SignedKothrud, Pune 411038 |Promoter: Badhekar Properties
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Buildings
- 1
- Unit types
- 104 105 2BHK 205 1R, 1BHK, 1r, 1RK, 2BHK, 3BHK, 4BHK59 units in all
- Address
- 878, Paud Road, KothrudPIN 411038
- Designated bank account
- 82
- Developed in phases
- No
Location
Coordinates as published by MahaRERA
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion promised for 31 Dec 2026
- Registered
- 18 Jul 2020
- Promised
- 31 Dec 2026
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100025819 | 18 Jul 2020 | 31 Dec 2026 | 31 Jan 2026 | Badhekar Properties | Project page |
1 building
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| Mayura | 15 | 59 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
21 of 59 units booked (36%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 104 105 2BHK 205 1R | 163.31 sq m · 1,758 sq ft | 1 | 1 |
| 1BHK | 38.23 sq m · 412 sq ft | 1 | 0 |
| 1BHK | 42.27 sq m · 455 sq ft | 1 | 0 |
| 1BHK | 46.67 sq m · 502 sq ft | 1 | 0 |
| 1BHK | 47.67 sq m · 513 sq ft | 1 | 0 |
| 1BHK | 50.58 sq m · 544 sq ft | 1 | 1 |
| 1r | 22.11 sq m · 238 sq ft | 1 | 1 |
| 1r | 24.08 sq m · 259 sq ft | 1 | 1 |
Show all 38 unit rowsShow fewer unit rows
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 1RK | 23.3 sq m · 251 sq ft | 1 | 0 |
| 1RK | 33.03 sq m · 356 sq ft | 2 | 0 |
| 1RK | 38.87 sq m · 418 sq ft | 1 | 0 |
| 2BHK | 63.9 sq m · 688 sq ft | 2 | 0 |
| 2BHK | 64.35 sq m · 693 sq ft | 1 | 0 |
| 2BHK | 67.78 sq m · 730 sq ft | 2 | 1 |
| 2BHK | 68.48 sq m · 737 sq ft | 4 | 1 |
| 2BHK | 68.62 sq m · 739 sq ft | 1 | 0 |
| 2BHK | 69.26 sq m · 746 sq ft | 1 | 0 |
| 2BHK | 70.3 sq m · 757 sq ft | 2 | 1 |
| 2BHK | 73.88 sq m · 795 sq ft | 1 | 0 |
| 2BHK | 74.96 sq m · 807 sq ft | 1 | 0 |
| 2BHK | 75.39 sq m · 811 sq ft | 1 | 0 |
| 2BHK | 76.4 sq m · 822 sq ft | 7 | 2 |
| 2BHK | 76.74 sq m · 826 sq ft | 1 | 0 |
| 2BHK | 77.83 sq m · 838 sq ft | 1 | 1 |
| 2BHK | 78.31 sq m · 843 sq ft | 1 | 1 |
| 2BHK | 78.5 sq m · 845 sq ft | 1 | 0 |
| 2BHK | 80.48 sq m · 866 sq ft | 2 | 0 |
| 2BHK | 88.79 sq m · 956 sq ft | 1 | 0 |
| 2BHK | 93.96 sq m · 1,011 sq ft | 4 | 3 |
| 2BHK | 117.03 sq m · 1,260 sq ft | 1 | 1 |
| 3BHK | 81.45 sq m · 877 sq ft | 1 | 0 |
| 3BHK | 87.68 sq m · 944 sq ft | 1 | 0 |
| 3BHK | 95.8 sq m · 1,031 sq ft | 1 | 0 |
| 3BHK | 99.96 sq m · 1,076 sq ft | 1 | 0 |
| 3BHK | 101.64 sq m · 1,094 sq ft | 3 | 3 |
| 3BHK | 106.31 sq m · 1,144 sq ft | 1 | 0 |
| 3BHK | 118.7 sq m · 1,278 sq ft | 1 | 1 |
| 4BHK | 119.15 sq m · 1,283 sq ft | 3 | 2 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
3 documents held by Deedo, 370 filings listed on MahaRERA's project page
Registration certificate (2)
Finance
Show all 373 documentsShow fewer documents
Legal
- Declaration Form BForm B Mayura site.pdf · uploaded 9 Dec 2024Source
Migrated
- 1 Details of encumbrancesno encumbrance letter Mayura.pdf · uploaded 8 Jul 2020Source
- 1 Building Plan Approval / NA Order for plotted developmentHPSC0419.pdf · uploaded 8 Jul 2020Source
- 2 Building Plan Approval / NA Order for plotted developmentHPSC0420.pdf · uploaded 8 Jul 2020Source
- 3 Building Plan Approval / NA Order for plotted developmentHPSC0421_compressed.pdf · uploaded 8 Jul 2020Source
- 4 Building Plan Approval / NA Order for plotted developmentHPSC0422_compressed.pdf · uploaded 8 Jul 2020Source
- 5 Building Plan Approval / NA Order for plotted developmentHPSC0422_compressed.pdf · uploaded 8 Jul 2020Source
- 1 Declaration in FORM Baffidivet 1.PDF · uploaded 8 Jul 2020Source
- 2 Declaration in FORM BAffidivet 2.PDF · uploaded 8 Jul 2020Source
- 1 Proforma of Allotment letterMayura Allotment letter.pdf · uploaded 8 Jul 2020Source
- 1 Copy of Layout Approval (in case of layout)HPSC0419.pdf · uploaded 9 Jul 2020Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form_3_Maha_Rera_CA_Certificate_Mayura Signed.pdf · uploaded 9 Jul 2020Source
- 1 PAN CardBadhekar Properties Pan.pdf · uploaded 12 Jul 2020Source
- 2 PAN CardPKB Pan Card.pdf · uploaded 12 Jul 2020Source
- 1 Commencement Certificates / NA Order for plotted developmentSKM_C25820070817170.pdf · uploaded 12 Jul 2020Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Mayura society engineers certificate 8-7-2020_compressed (1).pdf · uploaded 12 Jul 2020Source
- 1 Copy of the legal title reportRevised search report Mayura site_compressed (1).pdf · uploaded 13 Jul 2020Source
- 2 Copy of Layout Approval (in case of layout)HPSCANNER3472.pdf · uploaded 23 Feb 2021Source
- 6 Building Plan Approval / NA Order for plotted developmentHPSCANNER3477.pdf · uploaded 23 Feb 2021Source
- 7 Building Plan Approval / NA Order for plotted developmentHPSCANNER3473.pdf · uploaded 23 Feb 2021Source
- 8 Building Plan Approval / NA Order for plotted developmentHPSCANNER3473.pdf · uploaded 23 Feb 2021Source
- 9 Building Plan Approval / NA Order for plotted developmentHPSCANNER3474.pdf · uploaded 23 Feb 2021Source
- 10 Building Plan Approval / NA Order for plotted developmentHPSCANNER3475.pdf · uploaded 23 Feb 2021Source
- 11 Building Plan Approval / NA Order for plotted developmentHPSCANNER3476.pdf · uploaded 23 Feb 2021Source
- 12 Building Plan Approval / NA Order for plotted developmentHPSCANNER3477.pdf · uploaded 23 Feb 2021Source
- 13 Building Plan Approval / NA Order for plotted developmentHPSCANNER3478.pdf · uploaded 23 Feb 2021Source
- 2 Commencement Certificates / NA Order for plotted development202102221850.pdf · uploaded 23 Feb 2021Source
- 3 Commencement Certificates / NA Order for plotted development202102221850-1.pdf · uploaded 23 Feb 2021Source
- 4 Commencement Certificates / NA Order for plotted development202102221852.pdf · uploaded 23 Feb 2021Source
- 14 Building Plan Approval / NA Order for plotted development1.pdf · uploaded 27 May 2021Source
- 15 Building Plan Approval / NA Order for plotted development2.pdf · uploaded 27 May 2021Source
- 16 Building Plan Approval / NA Order for plotted development3.pdf · uploaded 27 May 2021Source
- 17 Building Plan Approval / NA Order for plotted development4.pdf · uploaded 27 May 2021Source
- 18 Building Plan Approval / NA Order for plotted development5.pdf · uploaded 27 May 2021Source
- 19 Building Plan Approval / NA Order for plotted development6.pdf · uploaded 27 May 2021Source
- 20 Building Plan Approval / NA Order for plotted development7.pdf · uploaded 27 May 2021Source
- 21 Building Plan Approval / NA Order for plotted development8.pdf · uploaded 27 May 2021Source
- 22 Building Plan Approval / NA Order for plotted development9.pdf · uploaded 27 May 2021Source
- 23 Building Plan Approval / NA Order for plotted development10.pdf · uploaded 27 May 2021Source
- 24 Building Plan Approval / NA Order for plotted development11.pdf · uploaded 27 May 2021Source
- 25 Building Plan Approval / NA Order for plotted development12.pdf · uploaded 27 May 2021Source
- 26 Building Plan Approval / NA Order for plotted development13.pdf · uploaded 27 May 2021Source
- 27 Building Plan Approval / NA Order for plotted development14.pdf · uploaded 27 May 2021Source
- 28 Building Plan Approval / NA Order for plotted development15.pdf · uploaded 27 May 2021Source
- 29 Building Plan Approval / NA Order for plotted development16.pdf · uploaded 27 May 2021Source
- 30 Building Plan Approval / NA Order for plotted development17.pdf · uploaded 27 May 2021Source
- 31 Building Plan Approval / NA Order for plotted development18.pdf · uploaded 27 May 2021Source
- 32 Building Plan Approval / NA Order for plotted development19.pdf · uploaded 27 May 2021Source
- 33 Building Plan Approval / NA Order for plotted development20.pdf · uploaded 27 May 2021Source
- 34 Building Plan Approval / NA Order for plotted development1.pdf · uploaded 27 May 2021Source
- 5 Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT CERTIFICATE.pdf · uploaded 27 May 2021Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Scan01.pdf · uploaded 27 May 2021Source
- 1 Declaration about Commencement CertificateDeclaration about CC Mayura.pdf · uploaded 21 Jun 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)FORM 2A MAYURA.pdf · uploaded 26 Jan 2022Source
- 35 Building Plan Approval / NA Order for plotted developmentkrushnakunj 22 2 22 1_16.pdf · uploaded 2 Mar 2022Source
- 36 Building Plan Approval / NA Order for plotted developmentkrushnakunj 22 2 22 2_16.pdf · uploaded 2 Mar 2022Source
- 37 Building Plan Approval / NA Order for plotted developmentkrushnakunj 22 2 22 3_16.pdf · uploaded 2 Mar 2022Source
- 38 Building Plan Approval / NA Order for plotted developmentkrushnakunj 22 2 22 4_16.pdf · uploaded 2 Mar 2022Source
- 39 Building Plan Approval / NA Order for plotted developmentkrushnakunj 22 2 22 5_16.pdf · uploaded 2 Mar 2022Source
- 40 Building Plan Approval / NA Order for plotted developmentkrushnakunj 22 2 22 6_16.pdf · uploaded 2 Mar 2022Source
- 41 Building Plan Approval / NA Order for plotted developmentkrushnakunj 22 2 22 7_16.pdf · uploaded 2 Mar 2022Source
- 42 Building Plan Approval / NA Order for plotted developmentkrushnakunj 22 2 22 8_16.pdf · uploaded 2 Mar 2022Source
- 43 Building Plan Approval / NA Order for plotted developmentkrushnakunj 22 2 22 9_16.pdf · uploaded 2 Mar 2022Source
- 44 Building Plan Approval / NA Order for plotted developmentkrushnakunj 22 2 22 10_16.pdf · uploaded 2 Mar 2022Source
- 45 Building Plan Approval / NA Order for plotted developmentkrushnakunj 22 2 22 11_16.pdf · uploaded 2 Mar 2022Source
- 46 Building Plan Approval / NA Order for plotted developmentkrushnakunj 22 2 22 12_16.pdf · uploaded 2 Mar 2022Source
- 47 Building Plan Approval / NA Order for plotted developmentkrushnakunj 22 2 22 13_16.pdf · uploaded 2 Mar 2022Source
- 48 Building Plan Approval / NA Order for plotted developmentkrushnakunj 22 2 22 14_16.pdf · uploaded 2 Mar 2022Source
- 49 Building Plan Approval / NA Order for plotted developmentkrushnakunj 22 2 22 15_16.pdf · uploaded 2 Mar 2022Source
- 50 Building Plan Approval / NA Order for plotted developmentkrushnakunj 22 2 22 16_16.pdf · uploaded 2 Mar 2022Source
- 6 Commencement Certificates / NA Order for plotted developmentKrushankunj 22 2 22 CC 3686.pdf · uploaded 2 Mar 2022Source
- 51 Building Plan Approval / NA Order for plotted development1_16_compressed.pdf · uploaded 4 May 2022Source
- 52 Building Plan Approval / NA Order for plotted development2_16_compressed.pdf · uploaded 4 May 2022Source
- 53 Building Plan Approval / NA Order for plotted development3_16_compressed.pdf · uploaded 4 May 2022Source
- 54 Building Plan Approval / NA Order for plotted development4_16_compressed.pdf · uploaded 4 May 2022Source
- 55 Building Plan Approval / NA Order for plotted development5_16_compressed.pdf · uploaded 4 May 2022Source
- 56 Building Plan Approval / NA Order for plotted development6_16_compressed.pdf · uploaded 4 May 2022Source
- 57 Building Plan Approval / NA Order for plotted development7_16_compressed.pdf · uploaded 4 May 2022Source
- 58 Building Plan Approval / NA Order for plotted development8_16_compressed.pdf · uploaded 4 May 2022Source
- 59 Building Plan Approval / NA Order for plotted development9_16_compressed.pdf · uploaded 4 May 2022Source
- 60 Building Plan Approval / NA Order for plotted development10_16_compressed.pdf · uploaded 4 May 2022Source
- 61 Building Plan Approval / NA Order for plotted development11_16_compressed.pdf · uploaded 4 May 2022Source
- 62 Building Plan Approval / NA Order for plotted development12_16_compressed.pdf · uploaded 4 May 2022Source
- 63 Building Plan Approval / NA Order for plotted development13_16_compressed.pdf · uploaded 4 May 2022Source
- 64 Building Plan Approval / NA Order for plotted development14_16_compressed.pdf · uploaded 4 May 2022Source
- 65 Building Plan Approval / NA Order for plotted development15_16_compressed.pdf · uploaded 4 May 2022Source
- 66 Building Plan Approval / NA Order for plotted development16_16_compressed.pdf · uploaded 4 May 2022Source
- 7 Commencement Certificates / NA Order for plotted developmentCC 02 MAY 2022_compressed.pdf · uploaded 4 May 2022Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)FORM 2A MAYURA.pdf · uploaded 16 May 2022Source
- 1 CERSAI detailsMAYURA CERSAI REPORT.pdf · uploaded 6 Jul 2022Source
- 1 Disclosure of sold/ booked inventoryMAYURA DISCLOSURE.pdf · uploaded 7 Jul 2022Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)MAYURA ARCH CERTIFICATE 26 09 2022.pdf · uploaded 28 Sep 2022Source
- 2 a Details of encumbrances concerned to FinanceNo Encumbrances of Legal MAYURA.pdf · uploaded 15 Dec 2022Source
- 3 a Details of encumbrances concerned to FinanceNo Encumbrances of Finance MAYURA.pdf · uploaded 15 Dec 2022Source
- 1 b Details of encumbrances concerned to LegalNo Encumbrances of Legal MAYURA.pdf · uploaded 15 Dec 2022Source
- 2 b Details of encumbrances concerned to LegalNo Encumbrances of Finance MAYURA.pdf · uploaded 15 Dec 2022Source
- 2 Declaration about Commencement CertificateDeclaration about CC MAYURA.pdf · uploaded 15 Dec 2022Source
- 2 Disclosure of sold/ booked inventorySOLD-UNSOLD INVENTORIES MAYURA.pdf · uploaded 15 Dec 2022Source
- 1 Proforma of Agreement for saleBooking Agreement to Sell Draft of Mayura.pdf · uploaded 15 Dec 2022Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameSeparate Account Details MAYURA.pdf · uploaded 15 Dec 2022Source
- 1 Deviation Report with respect to Allotment letterR1 Deviation Report wrt Allotment letter MAYURA.pdf · uploaded 15 Dec 2022Source
- 1 Deviation Report with respect to model copy of AgreementDeviation Report wrt model copy of Agreement MAYURA.pdf · uploaded 15 Dec 2022Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsDisclosure in REO-BP.pdf · uploaded 8 Jan 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)FORM 5 MAYURA 21-22.pdf · uploaded 15 Feb 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Mayura Form 1.pdf · uploaded 30 May 2023Source
- 67 Building Plan Approval / NA Order for plotted development1-17_compressed.pdf · uploaded 1 Jul 2023Source
- 68 Building Plan Approval / NA Order for plotted development2-17_compressed.pdf · uploaded 1 Jul 2023Source
- 69 Building Plan Approval / NA Order for plotted development3-17_compressed.pdf · uploaded 1 Jul 2023Source
- 70 Building Plan Approval / NA Order for plotted development4-17_compressed.pdf · uploaded 1 Jul 2023Source
- 71 Building Plan Approval / NA Order for plotted development5-17_compressed.pdf · uploaded 1 Jul 2023Source
- 72 Building Plan Approval / NA Order for plotted development6-17_compressed.pdf · uploaded 1 Jul 2023Source
- 73 Building Plan Approval / NA Order for plotted development7-17_compressed.pdf · uploaded 1 Jul 2023Source
- 74 Building Plan Approval / NA Order for plotted development8-17_compressed.pdf · uploaded 1 Jul 2023Source
- 75 Building Plan Approval / NA Order for plotted development9-17_compressed.pdf · uploaded 1 Jul 2023Source
- 76 Building Plan Approval / NA Order for plotted development10-17_compressed.pdf · uploaded 1 Jul 2023Source
- 77 Building Plan Approval / NA Order for plotted development11-17_compressed.pdf · uploaded 1 Jul 2023Source
- 78 Building Plan Approval / NA Order for plotted development12-17_compressed.pdf · uploaded 1 Jul 2023Source
- 79 Building Plan Approval / NA Order for plotted development13-17_compressed.pdf · uploaded 1 Jul 2023Source
- 80 Building Plan Approval / NA Order for plotted development14-17_compressed.pdf · uploaded 1 Jul 2023Source
- 81 Building Plan Approval / NA Order for plotted development15-17_compressed.pdf · uploaded 1 Jul 2023Source
- 82 Building Plan Approval / NA Order for plotted development16-17_compressed.pdf · uploaded 1 Jul 2023Source
- 83 Building Plan Approval / NA Order for plotted development17-17_compressed.pdf · uploaded 1 Jul 2023Source
- 8 Commencement Certificates / NA Order for plotted developmentCC KRISHNAKUNJ 6th Sanction 21_06_23.pdf · uploaded 1 Jul 2023Source
- 3 Disclosure of sold/ booked inventoryDisclosure of sold Mayura site.pdf · uploaded 29 Sep 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)MAYURA.pdf · uploaded 16 Oct 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Mayura site Form 2A QAC.pdf · uploaded 6 Nov 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)FORM 5 MAYURA 20-21.pdf · uploaded 8 Dec 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate MAYURA 18 Dec 23.pdf · uploaded 27 Dec 2023Source
- 2 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest in REO-BD.pdf · uploaded 17 Jan 2024Source
- 3 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest in REO-BPP.pdf · uploaded 17 Jan 2024Source
- 4 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest in REO-ES.pdf · uploaded 17 Jan 2024Source
- 5 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest in REO-PPI.pdf · uploaded 17 Jan 2024Source
- 6 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest in REO-SP.pdf · uploaded 17 Jan 2024Source
- 4 Disclosure of sold/ booked inventoryMayura Disclosure of sold-booked inventory.pdf · uploaded 5 Feb 2024Source
- 5 Disclosure of sold/ booked inventoryDisclosure of sold-booked inventory Mayura.pdf · uploaded 13 Feb 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Mayura RERA Form V FY 22-23.pdf · uploaded 20 Mar 2024Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Mayura RERA Form V FY 22-23 Revised.pdf · uploaded 21 Mar 2024Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)MAYURA LETTER.pdf · uploaded 21 Apr 2024Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Mayura.pdf · uploaded 30 Jul 2024Source
- 6 Disclosure of sold/ booked inventoryDisclosure of inventory Mayura site.pdf · uploaded 5 Aug 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Mayura.pdf · uploaded 18 Nov 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Mayura RERA Form 3 Mar-24 Scan_compressed.pdf · uploaded 28 Nov 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Mayura Mar 24 Engineer Certificate Form 2.pdf · uploaded 28 Nov 2024Source
- 1 Declaration about Commencement CertificateDeclaration about CC Mayura June-23.pdf · uploaded 2 Dec 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A-QAC Engineer Certificate Mayura 21-22.pdf · uploaded 2 Dec 2024Source
- 3 Disclosure of sold/ booked inventoryDisclosure of sold Mayura.pdf · uploaded 7 Dec 2024Source
- 1 CERSAI detailsNo CERSAI Report Mayura 071224.pdf · uploaded 7 Dec 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A-QAC Engineer Certificate Mayura 23-24.pdf · uploaded 7 Dec 2024Source
- 1 Declaration in FORM BForm B Mayura site.pdf · uploaded 9 Dec 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect certificate Mayura site Revised Sep 24.pdf · uploaded 9 Dec 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Mayura FY 23-24 RERA Form 5 Scan.pdf · uploaded 18 Dec 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect certificate Mayura Dec-24.pdf · uploaded 17 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Mayura RERA Form 3 Sept 24 Scan_compressed.pdf · uploaded 20 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate Mayura Sep-24.pdf · uploaded 20 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryDisclosure of sold Mayura Dec-24.pdf · uploaded 22 Jan 2025Source
- 2 Disclosure of sold/ booked inventoryDisclosure of booked inventory Mayura Dec-24.pdf · uploaded 24 Feb 2025Source
- Form 2A (FY 2020-2021)Form 2 A QAC Mayura site 20-21..pdf · uploaded 12 Jul 2025Source
- Form 2A (FY 2021-2022)Form 2 A QAC Mayura site 21-22..pdf · uploaded 12 Jul 2025Source
- Form 2A (FY 2022-2023)Form 2A QAC Mayura 22-23.pdf · uploaded 14 Jul 2025Source
- Form 2A (FY 2023-2024)Form 2 A QAC Mayura site 23-24. (1).pdf · uploaded 14 Jul 2025Source
- Form 2A (FY 2024-2025)Form 2 A QAC Mayura site 24-25. (1).pdf · uploaded 14 Jul 2025Source
- Form 5 (FY 2021-2022)1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22).pdf · uploaded 15 Jul 2025Source
- Form 5 (FY 2022-2023)1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23).pdf · uploaded 15 Jul 2025Source
- Form 1Architect’s Certificate - Mayura Sep 2024.pdf · uploaded 5 Aug 2025Source
- Form 2Engineer’s Certificate - Mayura Sep 2024.pdf · uploaded 5 Aug 2025Source
- Form 3CA Certificate - Mayura Sep 2024.pdf · uploaded 5 Aug 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of sold_ booked inventory Sep 24.pdf · uploaded 5 Aug 2025Source
- Form 1Architect Certificate Mayura Mar 25.pdf · uploaded 25 Nov 2025Source
- Form 1Architect’s Certificate - Mayura Dec 2024.pdf · uploaded 25 Nov 2025Source
- Form 1Architect’s Certificate - Mayura June 2024.pdf · uploaded 25 Nov 2025Source
- Form 1Architect’s Certificate - Mayura Mar 2024.pdf · uploaded 25 Nov 2025Source
- Form 1Architect’s Certificate - Mayura Dec 2023.pdf · uploaded 25 Nov 2025Source
- Form 1Architect’s Certificate - Mayura Sep 2023.pdf · uploaded 25 Nov 2025Source
- Form 1Disclosure of sold_ booked inventory Dec 22.pdf · uploaded 25 Nov 2025Source
- Form 1Disclosure of sold_ booked inventory Dec 22.pdf · uploaded 25 Nov 2025Source
- Form 1Architect’s Certificate - Mauyra Sep 2022.pdf · uploaded 25 Nov 2025Source
- Form 1Disclosure of sold_ booked inventory Jun 22.pdf · uploaded 25 Nov 2025Source
- Form 1Architect’s Certificate - Mayura May 2021.pdf · uploaded 25 Nov 2025Source
- Form 2Architect Certificate Mayura Mar 25.pdf · uploaded 25 Nov 2025Source
- Form 2Architect’s Certificate - Mayura Dec 2024.pdf · uploaded 25 Nov 2025Source
- Form 2Architect’s Certificate - Mayura June 2024.pdf · uploaded 25 Nov 2025Source
- Form 2Engineer’s Certificate - Mayura Mar 2024.pdf · uploaded 25 Nov 2025Source
- Form 2Architect’s Certificate - Mayura Dec 2023.pdf · uploaded 25 Nov 2025Source
- Form 2Architect’s Certificate - Mayura Sep 2023.pdf · uploaded 25 Nov 2025Source
- Form 2Disclosure of sold_ booked inventory Dec 22.pdf · uploaded 25 Nov 2025Source
- Form 2Disclosure of sold_ booked inventory Dec 22.pdf · uploaded 25 Nov 2025Source
- Form 2Architect’s Certificate - Mauyra Sep 2022.pdf · uploaded 25 Nov 2025Source
- Form 2Disclosure of sold_ booked inventory Jun 22.pdf · uploaded 25 Nov 2025Source
- Form 2Architect’s Certificate - Mayura May 2021.pdf · uploaded 25 Nov 2025Source
- Form 3Architect Certificate Mayura Mar 25.pdf · uploaded 25 Nov 2025Source
- Form 3Mayura RERA Form 3 Dec 24.pdf · uploaded 25 Nov 2025Source
- Form 3Architect’s Certificate - Mayura June 2024.pdf · uploaded 25 Nov 2025Source
- Form 3CA Certificate - Mayura Mar 2024.pdf · uploaded 25 Nov 2025Source
- Form 3Architect’s Certificate - Mayura Dec 2023.pdf · uploaded 25 Nov 2025Source
- Form 3Architect’s Certificate - Mayura Sep 2023.pdf · uploaded 25 Nov 2025Source
- Form 3Disclosure of sold_ booked inventory Dec 22.pdf · uploaded 25 Nov 2025Source
- Form 3Disclosure of sold_ booked inventory Dec 22.pdf · uploaded 25 Nov 2025Source
- Form 3Architect’s Certificate - Mauyra Sep 2022.pdf · uploaded 25 Nov 2025Source
- Form 3Disclosure of sold_ booked inventory Jun 22.pdf · uploaded 25 Nov 2025Source
- Form 3Architect’s Certificate - Mayura May 2021.pdf · uploaded 25 Nov 2025Source
- Disclosure of Sold and Booked InventoryArchitect Certificate Mayura Mar 25.pdf · uploaded 25 Nov 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of sold_ booked inventory1 Dec 24.pdf · uploaded 25 Nov 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of sold_ booked inventory Jun 24.pdf · uploaded 25 Nov 2025Source
- Disclosure of Sold and Booked InventoryArchitect’s Certificate - Mayura Mar 2024.pdf · uploaded 25 Nov 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of sold_ booked inventory Dec 23.pdf · uploaded 25 Nov 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of sold_ booked inventory Sep 23.pdf · uploaded 25 Nov 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of sold_ booked inventory Dec 22.pdf · uploaded 25 Nov 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of sold_ booked inventory Dec 22.pdf · uploaded 25 Nov 2025Source
- Disclosure of Sold and Booked InventoryArchitect’s Certificate - Mauyra Sep 2022.pdf · uploaded 25 Nov 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of sold_ booked inventory Jun 22.pdf · uploaded 25 Nov 2025Source
- Disclosure of Sold and Booked InventoryArchitect’s Certificate - Mayura May 2021.pdf · uploaded 25 Nov 2025Source
- Form 1Architect’s Certificate - Mayura May 2021.pdf · uploaded 26 Nov 2025Source
- Form 1Architect’s Certificate - Mayura May 2021.pdf · uploaded 26 Nov 2025Source
- Form 1Architect’s Certificate - Mayura May 2021.pdf · uploaded 26 Nov 2025Source
- Form 1Engineer’s Certificate - Mayura Jul 2020.pdf · uploaded 26 Nov 2025Source
- Form 1Engineer’s Certificate - Mayura Jul 2020.pdf · uploaded 26 Nov 2025Source
- Form 1Engineer’s Certificate - Mayura Jul 2020.pdf · uploaded 26 Nov 2025Source
- Form 1Disclosure of sold_ booked inventory Dec 22.pdf · uploaded 26 Nov 2025Source
- Form 2Architect’s Certificate - Mayura May 2021.pdf · uploaded 26 Nov 2025Source
- Form 2Architect’s Certificate - Mayura May 2021.pdf · uploaded 26 Nov 2025Source
- Form 2Architect’s Certificate - Mayura May 2021.pdf · uploaded 26 Nov 2025Source
- Form 2Engineer’s Certificate - Mayura Jul 2020.pdf · uploaded 26 Nov 2025Source
- Form 2Engineer’s Certificate - Mayura Jul 2020.pdf · uploaded 26 Nov 2025Source
- Form 2Engineer’s Certificate - Mayura Jul 2020.pdf · uploaded 26 Nov 2025Source
- Form 2Disclosure of sold_ booked inventory Dec 22.pdf · uploaded 26 Nov 2025Source
- Form 3Architect’s Certificate - Mayura May 2021.pdf · uploaded 26 Nov 2025Source
- Form 3Architect’s Certificate - Mayura May 2021.pdf · uploaded 26 Nov 2025Source
- Form 3Architect’s Certificate - Mayura May 2021.pdf · uploaded 26 Nov 2025Source
- Form 3CA Certificate - Mayura Jun 2020.pdf · uploaded 26 Nov 2025Source
- Form 3CA Certificate - Mayura Jun 2020.pdf · uploaded 26 Nov 2025Source
- Form 3CA Certificate - Mayura Jun 2020.pdf · uploaded 26 Nov 2025Source
- Form 3Disclosure of sold_ booked inventory Dec 22.pdf · uploaded 26 Nov 2025Source
- Disclosure of Sold and Booked InventoryArchitect’s Certificate - Mayura May 2021.pdf · uploaded 26 Nov 2025Source
- Disclosure of Sold and Booked InventoryArchitect’s Certificate - Mayura May 2021.pdf · uploaded 26 Nov 2025Source
- Disclosure of Sold and Booked InventoryArchitect’s Certificate - Mayura May 2021.pdf · uploaded 26 Nov 2025Source
- Disclosure of Sold and Booked InventoryCA Certificate - Mayura Jun 2020.pdf · uploaded 26 Nov 2025Source
- Disclosure of Sold and Booked InventoryCA Certificate - Mayura Jun 2020.pdf · uploaded 26 Nov 2025Source
- Disclosure of Sold and Booked InventoryCA Certificate - Mayura Jun 2020.pdf · uploaded 26 Nov 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of sold_ booked inventory Dec 22.pdf · uploaded 26 Nov 2025Source
- Form 2A (FY 2025-2026)Form 2A Engineers certificate Mayura 25-26.pdf · uploaded 21 Jan 2026Source
- Form 5 (FY 2020-2021)Form 5 Mayura 20-21.pdf · uploaded 26 Mar 2026Source
- Form 5 (FY 2023-2024)Mayura Form 5 - 23-24.pdf · uploaded 26 Mar 2026Source
- Form 5 (FY 2024-2025)Mayura FY 24-25 RERA Form 5 Scan.pdf · uploaded 26 Mar 2026Source
- Withdrawal Update Form 1Architect Certificate Mayura Mar 25.pdf · uploaded 24 Jul 2026Source
- Withdrawal Update Form 1Architect Certificate Mayura Mar 25.pdf · uploaded 24 Jul 2026Source
- Withdrawal Update Form 2Engineers Certificate Mayura site Mar-25.pdf · uploaded 24 Jul 2026Source
- Withdrawal Update Form 2Engineers Certificate Mayura site Mar-25.pdf · uploaded 24 Jul 2026Source
- Withdrawal Update Form 3Mayura RERA Form 3 Mar-25 Scan_compressed (1).pdf · uploaded 24 Jul 2026Source
- Withdrawal Update Form 3Mayura RERA Form 3 Mar-25 Scan_compressed (1).pdf · uploaded 24 Jul 2026Source
- Withdrawal Update Form 1Architect Certificate Mayura Mar 25.pdf · uploaded 25 Jul 2026Source
- Withdrawal Update Form 1Architect Certificate Mayura Mar 25.pdf · uploaded 25 Jul 2026Source
- Withdrawal Update Form 2Engineers Certificate Mayura site Mar-25.pdf · uploaded 25 Jul 2026Source
- Withdrawal Update Form 2Engineers Certificate Mayura site Mar-25.pdf · uploaded 25 Jul 2026Source
- Withdrawal Update Form 3Mayura RERA Form 3 Mar-25 Scan_compressed (1).pdf · uploaded 25 Jul 2026Source
- Withdrawal Update Form 3Mayura RERA Form 3 Mar-25 Scan_compressed (1).pdf · uploaded 25 Jul 2026Source
- Form 5 (FY 2025-2026)Tungbhadra FY 24-25 RERA 5 Scan.pdf · uploaded 2 Oct 2026Source
Technical
- DocumentHPSC0419.pdf · uploaded 8 Jul 2020Source
- DocumentHPSC0420.pdf · uploaded 8 Jul 2020Source
- DocumentHPSC0421_compressed.pdf · uploaded 8 Jul 2020Source
- DocumentHPSC0422_compressed.pdf · uploaded 8 Jul 2020Source
- DocumentHPSC0422_compressed.pdf · uploaded 8 Jul 2020Source
- DocumentHPSC0419.pdf · uploaded 9 Jul 2020Source
- DocumentHPSCANNER3472.pdf · uploaded 23 Feb 2021Source
- DocumentHPSCANNER3477.pdf · uploaded 23 Feb 2021Source
- DocumentHPSCANNER3473.pdf · uploaded 23 Feb 2021Source
- DocumentHPSCANNER3473.pdf · uploaded 23 Feb 2021Source
- DocumentHPSCANNER3474.pdf · uploaded 23 Feb 2021Source
- DocumentHPSCANNER3475.pdf · uploaded 23 Feb 2021Source
- DocumentHPSCANNER3476.pdf · uploaded 23 Feb 2021Source
- DocumentHPSCANNER3477.pdf · uploaded 23 Feb 2021Source
- DocumentHPSCANNER3478.pdf · uploaded 23 Feb 2021Source
- Document1.pdf · uploaded 27 May 2021Source
- Document2.pdf · uploaded 27 May 2021Source
- Document3.pdf · uploaded 27 May 2021Source
- Document4.pdf · uploaded 27 May 2021Source
- Document5.pdf · uploaded 27 May 2021Source
- Document6.pdf · uploaded 27 May 2021Source
- Document7.pdf · uploaded 27 May 2021Source
- Document8.pdf · uploaded 27 May 2021Source
- Document9.pdf · uploaded 27 May 2021Source
- Document10.pdf · uploaded 27 May 2021Source
- Document11.pdf · uploaded 27 May 2021Source
- Document12.pdf · uploaded 27 May 2021Source
- Document13.pdf · uploaded 27 May 2021Source
- Document14.pdf · uploaded 27 May 2021Source
- Document15.pdf · uploaded 27 May 2021Source
- Document16.pdf · uploaded 27 May 2021Source
- Document17.pdf · uploaded 27 May 2021Source
- Document18.pdf · uploaded 27 May 2021Source
- Document19.pdf · uploaded 27 May 2021Source
- Document20.pdf · uploaded 27 May 2021Source
- Document1.pdf · uploaded 27 May 2021Source
- Documentkrushnakunj 22 2 22 1_16.pdf · uploaded 2 Mar 2022Source
- Documentkrushnakunj 22 2 22 2_16.pdf · uploaded 2 Mar 2022Source
- Documentkrushnakunj 22 2 22 3_16.pdf · uploaded 2 Mar 2022Source
- Documentkrushnakunj 22 2 22 4_16.pdf · uploaded 2 Mar 2022Source
- Documentkrushnakunj 22 2 22 5_16.pdf · uploaded 2 Mar 2022Source
- Documentkrushnakunj 22 2 22 6_16.pdf · uploaded 2 Mar 2022Source
- Documentkrushnakunj 22 2 22 7_16.pdf · uploaded 2 Mar 2022Source
- Documentkrushnakunj 22 2 22 8_16.pdf · uploaded 2 Mar 2022Source
- Documentkrushnakunj 22 2 22 9_16.pdf · uploaded 2 Mar 2022Source
- Documentkrushnakunj 22 2 22 10_16.pdf · uploaded 2 Mar 2022Source
- Documentkrushnakunj 22 2 22 11_16.pdf · uploaded 2 Mar 2022Source
- Documentkrushnakunj 22 2 22 12_16.pdf · uploaded 2 Mar 2022Source
- Documentkrushnakunj 22 2 22 13_16.pdf · uploaded 2 Mar 2022Source
- Documentkrushnakunj 22 2 22 14_16.pdf · uploaded 2 Mar 2022Source
- Documentkrushnakunj 22 2 22 15_16.pdf · uploaded 2 Mar 2022Source
- Documentkrushnakunj 22 2 22 16_16.pdf · uploaded 2 Mar 2022Source
- Document1_16_compressed.pdf · uploaded 4 May 2022Source
- Document2_16_compressed.pdf · uploaded 4 May 2022Source
- Document3_16_compressed.pdf · uploaded 4 May 2022Source
- Document4_16_compressed.pdf · uploaded 4 May 2022Source
- Document5_16_compressed.pdf · uploaded 4 May 2022Source
- Document6_16_compressed.pdf · uploaded 4 May 2022Source
- Document7_16_compressed.pdf · uploaded 4 May 2022Source
- Document8_16_compressed.pdf · uploaded 4 May 2022Source
- Document9_16_compressed.pdf · uploaded 4 May 2022Source
- Document10_16_compressed.pdf · uploaded 4 May 2022Source
- Document11_16_compressed.pdf · uploaded 4 May 2022Source
- Document12_16_compressed.pdf · uploaded 4 May 2022Source
- Document13_16_compressed.pdf · uploaded 4 May 2022Source
- Document14_16_compressed.pdf · uploaded 4 May 2022Source
- Document15_16_compressed.pdf · uploaded 4 May 2022Source
- Document16_16_compressed.pdf · uploaded 4 May 2022Source
- Document1-17_compressed.pdf · uploaded 1 Jul 2023Source
- Document2-17_compressed.pdf · uploaded 1 Jul 2023Source
- Document3-17_compressed.pdf · uploaded 1 Jul 2023Source
- Document4-17_compressed.pdf · uploaded 1 Jul 2023Source
- Document5-17_compressed.pdf · uploaded 1 Jul 2023Source
- Document6-17_compressed.pdf · uploaded 1 Jul 2023Source
- Document7-17_compressed.pdf · uploaded 1 Jul 2023Source
- Document8-17_compressed.pdf · uploaded 1 Jul 2023Source
- Document9-17_compressed.pdf · uploaded 1 Jul 2023Source
- Document10-17_compressed.pdf · uploaded 1 Jul 2023Source
- Document11-17_compressed.pdf · uploaded 1 Jul 2023Source
- Document12-17_compressed.pdf · uploaded 1 Jul 2023Source
- Document13-17_compressed.pdf · uploaded 1 Jul 2023Source
- Document14-17_compressed.pdf · uploaded 1 Jul 2023Source
- Document15-17_compressed.pdf · uploaded 1 Jul 2023Source
- Document16-17_compressed.pdf · uploaded 1 Jul 2023Source
- Document17-17_compressed.pdf · uploaded 1 Jul 2023Source
- Document1.pdf · uploaded 26 Nov 2025Source
- Document2.pdf · uploaded 26 Nov 2025Source
- Document3.pdf · uploaded 26 Nov 2025Source
- Document4.pdf · uploaded 26 Nov 2025Source
- Document5.pdf · uploaded 26 Nov 2025Source
- Document6.pdf · uploaded 26 Nov 2025Source
- Document7.pdf · uploaded 26 Nov 2025Source
- Document8.pdf · uploaded 26 Nov 2025Source
- Document9.pdf · uploaded 26 Nov 2025Source
- Document10.pdf · uploaded 26 Nov 2025Source
- Document11.pdf · uploaded 26 Nov 2025Source
- Document12.pdf · uploaded 26 Nov 2025Source
- Document13.pdf · uploaded 26 Nov 2025Source
- Document14.pdf · uploaded 26 Nov 2025Source
- Document15.pdf · uploaded 26 Nov 2025Source
- Document16.pdf · uploaded 26 Nov 2025Source
- Document17.pdf · uploaded 26 Nov 2025Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Kothrud, Haveli taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- road
- South
- plot no 21
- East
- Road
- West
- space from this plot
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Paras Netragaonkar | — |
| Chartered accountant | D.b.gandhi & Associates | — |
| Chartered accountant | Dinesh Gandhi | — |
| Chartered accountant | Shrikant Mantri | — |
| Engineer | Dipali Kulkarni | — |
| Engineer | G A Bhilare | — |
Source: MahaRERA project page. Contact details are not shown.
