Residential / Group Housing · 1 building · 180 unitsRERA P52100048895

Gini Vibrance

Completion was pushed back 4 months, to Apr 2027; no MahaRERA orders on record; 86% of its units are booked.

Kivale, Pune 412101 · Promoter: Gini Citicorp Realty LLP

DeliveryExtended 4 moPromised Dec 2026 · now due Apr 2027RegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales86% booked155 of 180 units · as the promoter reported to MahaRERA
Gini Vibrance project report cardPDF: delivery, regulatory orders, people on record, every tower and the registered deals — for your bank or lawyerSee what's inside · from ₹1,499

Completion was pushed back 4 months, to Apr 2027

  • This projectRegistered 24 Jan 2023, completion promised 31 Dec 2026, revised to 30 Apr 2027.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales, rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

The building

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52100048895
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210004889524 Jan 202331 Dec 202630 Apr 2027Gini Citicorp Realty LLPProject page
Documents130

1 document held by Deedo, 129 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN Card1 PAN Card.pdf · uploaded 3 Nov 2022Source

Legal

  • Declaration Form BLLP_organized.pdf · uploaded 3 Nov 2022Source
  • Legal Title report1 Copy of the legal title report.pdf · uploaded 4 Nov 2022Source
  • Legal Title report2 Copy of the legal title report.pdf · uploaded 4 Nov 2022Source

Migrated

  • 1 PAN Card1 PAN Card.pdf · uploaded 3 Nov 2022Source
  • 1 Declaration in FORM BLLP_organized.pdf · uploaded 3 Nov 2022Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch Cert.pdf · uploaded 3 Nov 2022Source
Show all 130 documentsShow fewer documents

Migrated

  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Eng Cert.pdf · uploaded 3 Nov 2022Source
  • 1 CERSAI detailsCERSAI_Search_Report_200251158184_For_Asset_Based_Search_02_11_2022_13_05_54_165.pdf · uploaded 3 Nov 2022Source
  • 1 Copy of the legal title report1 Copy of the legal title report.pdf · uploaded 4 Nov 2022Source
  • 2 Copy of the legal title report2 Copy of the legal title report.pdf · uploaded 4 Nov 2022Source
  • 1 Commencement Certificates / NA Order for plotted development1 Commencement Certificates _ NA Order for plotted development.pdf · uploaded 4 Nov 2022Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA CERT.pdf · uploaded 4 Nov 2022Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameimg20221105_16074678.pdf · uploaded 5 Nov 2022Source
  • 1 a Details of encumbrances concerned to FinanceDecl Legal Enc.pdf · uploaded 7 Nov 2022Source
  • 2 a Details of encumbrances concerned to FinanceDecl Fin Enc.pdf · uploaded 7 Nov 2022Source
  • 1 b Details of encumbrances concerned to LegalDecl Legal Enc.pdf · uploaded 7 Nov 2022Source
  • 2 b Details of encumbrances concerned to LegalDecl Fin Enc.pdf · uploaded 7 Nov 2022Source
  • 1 Copy of Layout Approval (in case of layout)Santioned Plan_compressed.pdf · uploaded 4 Jan 2023Source
  • 1 Proforma of Allotment letterModel Form of Allotment Letter.pdf · uploaded 4 Jan 2023Source
  • 1 Deviation Report with respect to Allotment letterDeviation Report Concerning Allotment Letter.pdf · uploaded 4 Jan 2023Source
  • 1 Deviation Report with respect to model copy of AgreementDeviation Report Concerning Agreement To Sale_compressed.pdf · uploaded 4 Jan 2023Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsFINAL DISCLOSURE OF INTREST.pdf · uploaded 7 Jan 2023Source
  • 1 Proforma of Agreement for saleEdited Final Agreement to Sale.pdf · uploaded 7 Jan 2023Source
  • 1 Building Plan Approval / NA Order for plotted development1- 23 Layout H_compressed.pdf · uploaded 13 Jan 2023Source
  • 2 Building Plan Approval / NA Order for plotted development2 - 23 Lower Ground H_compressed.pdf · uploaded 13 Jan 2023Source
  • 3 Building Plan Approval / NA Order for plotted development3 -23 Ground H_compressed.pdf · uploaded 13 Jan 2023Source
  • 4 Building Plan Approval / NA Order for plotted development4 -23 Upper Ground H_compressed.pdf · uploaded 13 Jan 2023Source
  • 5 Building Plan Approval / NA Order for plotted developmentFloor Plan 20 - 23 Mhada Typical Floors _compressed (1).pdf · uploaded 13 Jan 2023Source
  • 6 Building Plan Approval / NA Order for plotted development21 -23 Mhada Section _rotated_compressed.pdf · uploaded 13 Jan 2023Source
  • 1 Declaration about Commencement CertificateDECLARATION ABOUT COMMENCEMENT CERTIFICATE(FORMATE-D).pdf · uploaded 13 Jan 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Vibrance Arch March 23.pdf · uploaded 16 May 2023Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Vibrance ENG March 23.pdf · uploaded 16 May 2023Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)VIBRANCE CA CERT MARCH 23.pdf · uploaded 16 May 2023Source
  • 2 Proforma of Agreement for saleGini_Vibrance_draft_with_payment_schedule 2023[1].pdf · uploaded 20 May 2023Source
  • 1 Disclosure of sold/ booked inventoryVibrance Mar 2023.pdf · uploaded 29 Jun 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)FORM 5 22-23 (G-VIB).pdf · uploaded 27 Jan 2024Source
  • 2 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD BOOKED INVENTORY GINI VIBRANCE_30-06-2023.pdf · uploaded 2 Feb 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)VIBRANCE ARCH CERT JUNE 23.pdf · uploaded 4 Feb 2024Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)VIBRANCE ARCH CER SEP23.pdf · uploaded 4 Feb 2024Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)GINI VIB- ARCHITECTS CERTIFICATE DEC 2023.pdf · uploaded 4 Feb 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)VIBRANCE ENG CERT JUNE 23.pdf · uploaded 4 Feb 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)GINI VIB- ENGINEERS CERTIFICATE DEC-2023.pdf · uploaded 4 Feb 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)VIBRANCE ENG CERTIFICATE SEP23.pdf · uploaded 4 Feb 2024Source
  • 3 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD BOOKED INVENTORY GINI VIBRANCE_30-06-2023.pdf · uploaded 4 Feb 2024Source
  • 4 Disclosure of sold/ booked inventoryVIB DISC INV SEP 23.pdf · uploaded 4 Feb 2024Source
  • 5 Disclosure of sold/ booked inventoryVibrance Disc Invontory Dec23.pdf · uploaded 4 Feb 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)VIBRANCE CA CERT JUNE 23.pdf · uploaded 4 Feb 2024Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA CERTIFICATE GINI VIBRANCE 30 09 23.pdf · uploaded 4 Feb 2024Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)GINI VIB- CA DEC 2023Signed Both Parties.pdf · uploaded 5 Feb 2024Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)FORM II- Gini Vibrance - 31032023.pdf · uploaded 24 Apr 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Gini Vibarance - RERA -31042024.pdf · uploaded 2 May 2024Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)VIBRANCE Q4 23-24 ARCH.pdf · uploaded 3 May 2024Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)VIBRANCE Q4 23-24 ENG.pdf · uploaded 3 May 2024Source
  • 6 Disclosure of sold/ booked inventoryVIBRANCE Q4 23-24 SOLD-UNSOLD.pdf · uploaded 3 May 2024Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)VIBRANCE Q4 23-24 CA_compressed.pdf · uploaded 3 May 2024Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)VIBRANCE FORM 1 JUNE 24.pdf · uploaded 9 Jul 2024Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)VIBRANCE FORM 2 JUNE 24.pdf · uploaded 9 Jul 2024Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)VIBRANCE FORM 3 JUNE 24.pdf · uploaded 9 Jul 2024Source
  • 7 Disclosure of sold/ booked inventorySold Unsold.pdf · uploaded 11 Jul 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)VIBRANCE FORM 5 23-24.pdf · uploaded 9 Nov 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Vibrance Form 1 Sep 2024.pdf · uploaded 13 Nov 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Vibrance Form 2 Sep 2024.pdf · uploaded 13 Nov 2024Source
  • 1 Disclosure of sold/ booked inventoryVibrance Sold Unsold Sep 24.pdf · uploaded 13 Nov 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Scanned_0001_Final.pdf · uploaded 14 Nov 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)vib form 1 051224.pdf · uploaded 6 Dec 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Comp_VIB fORM 3 05122024.pdf · uploaded 6 Dec 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Vibrance form 2 051224.pdf · uploaded 6 Dec 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)VIB FORM 1 - 06012025.pdf · uploaded 8 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)VIB FORM 3 060125.pdf · uploaded 8 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)VIB FORM 2 060125.pdf · uploaded 8 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)VIB FORM 1 310325.pdf · uploaded 19 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Vib Form 3 310325_11zon.pdf · uploaded 19 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)VIB FORM 2 310325.pdf · uploaded 19 Apr 2025Source
  • 1 Disclosure of sold/ booked inventoryVib SOLD UNSOLD 310325.pdf · uploaded 19 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)sign Vib Form 3 310325_11zon.pdf · uploaded 23 Apr 2025Source
  • Withdrawal Update Form 1G Vibrance Form 1 June 25.pdf · uploaded 25 Jul 2025Source
  • Withdrawal Update Form 2G Vibrance Form 2 June 25.pdf · uploaded 25 Jul 2025Source
  • Withdrawal Update Form 3G Vibrance Form 3 June 25_compressed (1).pdf · uploaded 25 Jul 2025Source
  • Form 5 (FY 2024-2025)VIBRANCE FORM 5 24-25.pdf · uploaded 30 Sep 2025Source
  • Form 5 (FY 2022-2023)FORM 5 22-23 (G-VIB).pdf · uploaded 6 Oct 2025Source
  • Form 5 (FY 2023-2024)VIBRANCE FORM 5 23-24.pdf · uploaded 6 Oct 2025Source
  • Withdrawal Update Form 1Gini Vibrance Form 1 Sep 25.pdf · uploaded 31 Oct 2025Source
  • Withdrawal Update Form 1Gini Vibrance Form 1 Sep 25.pdf · uploaded 31 Oct 2025Source
  • Withdrawal Update Form 2Gini Vibrance Form 2 Sep 25.pdf · uploaded 31 Oct 2025Source
  • Withdrawal Update Form 2Gini Vibrance Form 2 Sep 25.pdf · uploaded 31 Oct 2025Source
  • Withdrawal Update Form 3Gini Vibrance Form 3 Sep 25_merge.pdf · uploaded 31 Oct 2025Source
  • Withdrawal Update Form 3Gini Vibrance Form 3 Sep 25_merge.pdf · uploaded 31 Oct 2025Source
  • Form 2A (FY 2022-2023)2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23).pdf · uploaded 26 Nov 2025Source
  • Form 2A (FY 2023-2024)1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24).pdf · uploaded 26 Nov 2025Source
  • Form 2A (FY 2024-2025)VIB FORM 2A 24-25.pdf · uploaded 26 Nov 2025Source
  • Withdrawal Update Form 1New - VIB FORM 1 DEC.pdf · uploaded 28 Jan 2026Source
  • Withdrawal Update Form 2VIB FORM 2 DEC.pdf · uploaded 28 Jan 2026Source
  • Withdrawal Update Form 3VIB FORM 3 DEC.pdf · uploaded 28 Jan 2026Source
  • Withdrawal Update Form 1New - VIB FORM 1 DEC.pdf · uploaded 26 Feb 2026Source
  • Withdrawal Update Form 2VIB FORM 2 DEC.pdf · uploaded 26 Feb 2026Source
  • Withdrawal Update Form 300 Form 3 Vibrance 24 Feb 26 Compressed.pdf · uploaded 26 Feb 2026Source
  • Withdrawal Update Form 1Vib form 1 Mar 26.pdf · uploaded 23 Apr 2026Source
  • Withdrawal Update Form 2VIB FORM 2 MAR 26.pdf · uploaded 23 Apr 2026Source
  • Withdrawal Update Form 3form 3 Mar 26.pdf · uploaded 23 Apr 2026Source
  • Withdrawal Update Form 1VIB FORM 1.pdf · uploaded 16 Jul 2026Source
  • Withdrawal Update Form 2VIB FORM 2.pdf · uploaded 16 Jul 2026Source
  • Withdrawal Update Form 3VIB FORM 3.pdf · uploaded 16 Jul 2026Source
  • Form 5 (FY 2025-2026)Form 5 FY 25-26 Vibrance.pdf · uploaded 22 Sep 2026Source

Technical

  • DocumentSantioned Plan_compressed.pdf · uploaded 4 Jan 2023Source
  • Document1- 23 Layout H_compressed.pdf · uploaded 13 Jan 2023Source
  • Document2 - 23 Lower Ground H_compressed.pdf · uploaded 13 Jan 2023Source
  • Document3 -23 Ground H_compressed.pdf · uploaded 13 Jan 2023Source
  • Document4 -23 Upper Ground H_compressed.pdf · uploaded 13 Jan 2023Source
  • DocumentFloor Plan 20 - 23 Mhada Typical Floors _compressed (1).pdf · uploaded 13 Jan 2023Source
  • Document21 -23 Mhada Section _rotated_compressed.pdf · uploaded 13 Jan 2023Source
  • Document1-33 Layout.pdf · uploaded 28 May 2026Source
  • Document2-33 LG Parking.pdf · uploaded 28 May 2026Source
  • Document3-33 G Parking.pdf · uploaded 28 May 2026Source
  • Document4-33 UG Parking.pdf · uploaded 28 May 2026Source
  • Document19-33 B1 Mhada 1st to 23rd Floors.pdf · uploaded 28 May 2026Source
  • Document20-33 B1 Mhada - Section.pdf · uploaded 28 May 2026Source
  • Document33-33 Sections.pdf · uploaded 28 May 2026Source
  • DocumentDeclaration about CC.pdf · uploaded 28 May 2026Source

Technical (Architect)

  • DocumentVibrance Form 1 Sep 2024.pdf · uploaded 13 Nov 2024Source
  • Documentvib form 1 051224.pdf · uploaded 6 Dec 2024Source
  • DocumentVIB FORM 1 - 06012025.pdf · uploaded 8 Jan 2025Source
  • DocumentVIB FORM 1 310325.pdf · uploaded 19 Apr 2025Source
  • DocumentVIB FORM 1.pdf · uploaded 16 Jul 2026Source

Technical (Engineer)

  • DocumentVibrance Form 2 Sep 2024.pdf · uploaded 13 Nov 2024Source
  • DocumentVibrance form 2 051224.pdf · uploaded 6 Dec 2024Source
  • DocumentVIB FORM 2 060125.pdf · uploaded 8 Jan 2025Source
  • DocumentVIB FORM 2 310325.pdf · uploaded 19 Apr 2025Source
  • DocumentVIB FORM 2.pdf · uploaded 16 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsS NO 91/1 Part

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Unit types
2BHK180 units in all
Address
S NO 91/1 Part, Survey No.91/1, KiwalePIN 412101
Village
Kivale, Mawal taluka
Designated bank account
109
Developed in phases
No

Survey, CTS, gat or plot numbers

S NO 91/1 Part

Boundaries

North
18 Mtr Dp Road
South
Property Of Dhumal Family
East
12 Mtr Dp Road
West
Nala

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking180 units

155 of 180 units booked (86%), as the promoter reported to MahaRERA

2BHK · 180 units
TypeCarpet areaUnitsBooked
2BHK49.09 sq m · 528 sq ft8869
2BHK49.14 sq m · 529 sq ft9286

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals3

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
EngineerSiddharth N Shitole—
EngineerSuhas Ashok Patil—
OtherSv And Associates—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology