Alpine Astonia
Its promised completion date, Apr 2026, has passed and MahaRERA does not show it completed; no MahaRERA orders on record; 59% of its units are booked.
Kivale, Pune 412101 · Promoter: Alpine Landmarks LLP
Its promised completion date, Apr 2026, has passed and MahaRERA does not show it completed
- This projectRegistered 14 Nov 2022, completion promised 30 Apr 2026, and still not shown completed today.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
2 buildings
Open a building to see every flat, floor by floor.
- Alpine Astonia A Wing15 floors · 129 units71% booked
- Alpine Astonia B Wing15 floors · 107 units44% booked
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100047595
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100047595 | 14 Nov 2022 | 30 Apr 2026 | 30 Apr 2026 | Alpine Landmarks LLP | Project page |
Documents193
1 document held by Deedo, 192 filings listed on MahaRERA's project page
Finance
- PAN CardFIRM PAN.pdf · uploaded 27 Sep 2022Source
Legal
- Legal Title reportLEGAL TITLE REPORT.pdf · uploaded 27 Sep 2022Source
- Declaration Form BFORM B.pdf · uploaded 27 Sep 2022Source
- Declaration Form B7 12 Final.pdf · uploaded 17 Mar 2026Source
- Declaration Form BSale Deed-1-8.pdf · uploaded 17 Mar 2026Source
- Declaration Form BSale Deed-9-15.pdf · uploaded 17 Mar 2026Source
- Declaration Form BSale Deed-16-23.pdf · uploaded 17 Mar 2026Source
Show all 193 documentsShow fewer documents
Migrated
- 1 PAN CardFIRM PAN.pdf · uploaded 27 Sep 2022Source
- 1 Copy of the legal title reportLEGAL TITLE REPORT.pdf · uploaded 27 Sep 2022Source
- 1 a Details of encumbrances concerned to FinanceFinancial Encrumbances.pdf · uploaded 27 Sep 2022Source
- 1 b Details of encumbrances concerned to LegalLegal Encumbrance.pdf · uploaded 27 Sep 2022Source
- 1 Copy of Layout Approval (in case of layout)Layout Plan.pdf · uploaded 27 Sep 2022Source
- 1 Building Plan Approval / NA Order for plotted developmentLayout Plan.pdf · uploaded 27 Sep 2022Source
- 1 Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT CERTIFICATE.pdf · uploaded 27 Sep 2022Source
- 1 Declaration about Commencement CertificateCIRCULAR 32.pdf · uploaded 27 Sep 2022Source
- 1 Declaration in FORM BFORM B.pdf · uploaded 27 Sep 2022Source
- 1 CERSAI detailsCERSAI_Search_Report_200248255499_For_Asset_Based_Search_27_09_2022_17_56_24_214.pdf · uploaded 27 Sep 2022Source
- 1 Proforma of Allotment letterALLOTMENT LETTER_1.pdf · uploaded 27 Sep 2022Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameSeperate Bank Details.pdf · uploaded 27 Sep 2022Source
- 1 Deviation Report with respect to Allotment letterAllotment declaration_2.pdf · uploaded 27 Sep 2022Source
- 1 Deviation Report with respect to model copy of AgreementNo Deviation Report with Respect to afs.pdf · uploaded 27 Sep 2022Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_Upload.pdf · uploaded 29 Sep 2022Source
- 1 Proforma of Agreement for saleDraft AGREEMENT- RERA Alpine Astonia.pdf · uploaded 28 Oct 2022Source
- 2 Copy of Layout Approval (in case of layout)Alpaine Landmark Kiwale_compressed-5.pdf · uploaded 2 Mar 2023Source
- 2 Building Plan Approval / NA Order for plotted developmentAlpaine Landmark Kiwale_compressed-6.pdf · uploaded 2 Mar 2023Source
- 3 Building Plan Approval / NA Order for plotted developmentAlpaine Landmark Kiwale_compressed-7.pdf · uploaded 2 Mar 2023Source
- 4 Building Plan Approval / NA Order for plotted developmentAlpaine Landmark Kiwale_compressed-8.pdf · uploaded 2 Mar 2023Source
- 5 Building Plan Approval / NA Order for plotted developmentAlpaine Landmark Kiwale_compressed-9.pdf · uploaded 2 Mar 2023Source
- 6 Building Plan Approval / NA Order for plotted developmentAlpaine Landmark Kiwale_compressed-10.pdf · uploaded 2 Mar 2023Source
- 7 Building Plan Approval / NA Order for plotted developmentAlpaine Landmark Kiwale_compressed-11.pdf · uploaded 2 Mar 2023Source
- 8 Building Plan Approval / NA Order for plotted developmentAlpaine Landmark Kiwale_compressed-12.pdf · uploaded 2 Mar 2023Source
- 9 Building Plan Approval / NA Order for plotted developmentAlpaine Landmark Kiwale_compressed-13.pdf · uploaded 2 Mar 2023Source
- 10 Building Plan Approval / NA Order for plotted developmentAlpaine Landmark Kiwale_compressed-14.pdf · uploaded 2 Mar 2023Source
- 11 Building Plan Approval / NA Order for plotted developmentAlpaine Landmark Kiwale_compressed-15.pdf · uploaded 2 Mar 2023Source
- 12 Building Plan Approval / NA Order for plotted developmentAlpaine Landmark Kiwale_compressed-16.pdf · uploaded 2 Mar 2023Source
- 13 Building Plan Approval / NA Order for plotted developmentAlpaine Landmark Kiwale_compressed-17.pdf · uploaded 2 Mar 2023Source
- 14 Building Plan Approval / NA Order for plotted developmentAlpaine Landmark Kiwale_compressed-18.pdf · uploaded 2 Mar 2023Source
- 15 Building Plan Approval / NA Order for plotted developmentAlpaine Landmark Kiwale_compressed-19.pdf · uploaded 2 Mar 2023Source
- 2 Commencement Certificates / NA Order for plotted developmentAlpaine Landmark Kiwale_compressed-1-4.pdf · uploaded 2 Mar 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 27 Apr 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 27 Apr 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_organized.pdf · uploaded 21 Jul 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 (Correct).pdf · uploaded 21 Jul 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 (CA Signed)_1_compressed.pdf · uploaded 21 Jul 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)organized form 3.pdf · uploaded 28 Aug 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Final Upload.pdf · uploaded 14 Sep 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Final upload.pdf · uploaded 14 Sep 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A.pdf · uploaded 14 Sep 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects Certificate.pdf · uploaded 24 Oct 2023Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER CERTIFICATE.pdf · uploaded 24 Oct 2023Source
- 1 Disclosure of sold/ booked inventorySold Circular 29A compressed.pdf · uploaded 24 Oct 2023Source
- 2 Disclosure of sold/ booked inventorySold Circular 29B.pdf · uploaded 24 Oct 2023Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)FINAL UPLOADED.pdf · uploaded 24 Oct 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)FORM 5 Client.pdf · uploaded 2 Jan 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 22 Jan 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Final.pdf · uploaded 22 Jan 2024Source
- 3 Disclosure of sold/ booked inventoryFinal.pdf · uploaded 22 Jan 2024Source
- 4 Disclosure of sold/ booked inventoryFinal.pdf · uploaded 31 Jan 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 31 Jan 2024Source
- 3 Copy of Layout Approval (in case of layout)1-min.pdf · uploaded 5 Mar 2024Source
- 16 Building Plan Approval / NA Order for plotted development2-min.pdf · uploaded 5 Mar 2024Source
- 17 Building Plan Approval / NA Order for plotted development3-min.pdf · uploaded 5 Mar 2024Source
- 18 Building Plan Approval / NA Order for plotted development4-min.pdf · uploaded 5 Mar 2024Source
- 19 Building Plan Approval / NA Order for plotted development5-min.pdf · uploaded 5 Mar 2024Source
- 20 Building Plan Approval / NA Order for plotted development6-min.pdf · uploaded 5 Mar 2024Source
- 21 Building Plan Approval / NA Order for plotted development7-min.pdf · uploaded 5 Mar 2024Source
- 22 Building Plan Approval / NA Order for plotted development8-min.pdf · uploaded 5 Mar 2024Source
- 23 Building Plan Approval / NA Order for plotted development9-min.pdf · uploaded 5 Mar 2024Source
- 24 Building Plan Approval / NA Order for plotted development10-min.pdf · uploaded 5 Mar 2024Source
- 25 Building Plan Approval / NA Order for plotted development11-min.pdf · uploaded 5 Mar 2024Source
- 26 Building Plan Approval / NA Order for plotted development12-min.pdf · uploaded 5 Mar 2024Source
- 27 Building Plan Approval / NA Order for plotted development13-min.pdf · uploaded 5 Mar 2024Source
- 28 Building Plan Approval / NA Order for plotted development14-min.pdf · uploaded 5 Mar 2024Source
- 29 Building Plan Approval / NA Order for plotted development15-min.pdf · uploaded 5 Mar 2024Source
- 30 Building Plan Approval / NA Order for plotted development16-min.pdf · uploaded 5 Mar 2024Source
- 3 Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 5 Mar 2024Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Upload.pdf · uploaded 20 Apr 2024Source
- 5 Disclosure of sold/ booked inventorySold Upload.pdf · uploaded 20 Apr 2024Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Uploa.pdf · uploaded 20 Apr 2024Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)architect certificate rera 02072024 (1).pdf · uploaded 20 Jul 2024Source
- 6 Disclosure of sold/ booked inventorySold circular 29 (1).pdf · uploaded 20 Jul 2024Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 6 Aug 2024Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_Upload.pdf · uploaded 6 Aug 2024Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Corrected_compressed.pdf · uploaded 9 Aug 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 20 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 20 Oct 2024Source
- 2 Disclosure of sold/ booked inventorySold circular_.pdf · uploaded 20 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Final Form 3_compressed.pdf · uploaded 25 Dec 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects Certificate (1).pdf · uploaded 20 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Final_compressed.pdf · uploaded 20 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate_compressed.pdf · uploaded 20 Jan 2025Source
- 1 Disclosure of sold/ booked inventorySold Circular.pdf · uploaded 20 Jan 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 CA Promoter Signed.pdf · uploaded 5 Feb 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Final.pdf · uploaded 20 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Final_compressed.pdf · uploaded 20 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Eng Certificate_compressed.pdf · uploaded 20 Apr 2025Source
- 1 Disclosure of sold/ booked inventorySold Circular_compressed.pdf · uploaded 20 Apr 2025Source
- Form 1Form 1 Final.pdf · uploaded 13 Jul 2025Source
- Form 1Architects Certificate.pdf · uploaded 13 Jul 2025Source
- Form 2Eng Certificate_compressed.pdf · uploaded 13 Jul 2025Source
- Form 2Engineers Certificate.pdf · uploaded 13 Jul 2025Source
- Form 3Form 3 Final.pdf · uploaded 13 Jul 2025Source
- Form 3Form 3 Final.pdf · uploaded 13 Jul 2025Source
- Disclosure of Sold and Booked InventorySold Circular_compressed.pdf · uploaded 13 Jul 2025Source
- Disclosure of Sold and Booked InventorySold Circular.pdf · uploaded 13 Jul 2025Source
- Form 5 (FY 2024-2025)Final Upload.pdf · uploaded 30 Sep 2025Source
- Withdrawal Update Form 1Form 1 Final.pdf · uploaded 17 Oct 2025Source
- Withdrawal Update Form 2Form 2 Final.pdf · uploaded 17 Oct 2025Source
- Withdrawal Update Form 3Form 3 Final.pdf · uploaded 17 Oct 2025Source
- Withdrawal Update Form 1Form 1 Final.pdf · uploaded 18 Oct 2025Source
- Withdrawal Update Form 2Form 2 Final.pdf · uploaded 18 Oct 2025Source
- Withdrawal Update Form 3Form 3 Final.pdf · uploaded 18 Oct 2025Source
- Withdrawal Update Form 1Form 1 Signed.pdf · uploaded 20 Jan 2026Source
- Withdrawal Update Form 2Form 2 Signed.pdf · uploaded 20 Jan 2026Source
- Withdrawal Update Form 3Form 3 Signed.pdf · uploaded 20 Jan 2026Source
- Withdrawal Update Form 1Form 1 SIGNED.pdf · uploaded 19 Apr 2026Source
- Withdrawal Update Form 2FORM 2.pdf · uploaded 19 Apr 2026Source
- Withdrawal Update Form 3FORM 3 FINAL.pdf · uploaded 19 Apr 2026Source
- Form 2A (FY 2024-2025)Form 2A Final 2025.pdf · uploaded 28 Apr 2026Source
- Form 2A (FY 2025-2026)Form 2A Final 2026.pdf · uploaded 28 Apr 2026Source
- Occupational CertificateAlpine Landmark LLP Completion.pdf · uploaded 28 Apr 2026Source
- Occupational CertificateOC Mail.pdf · uploaded 28 Apr 2026Source
Technical
- DocumentLayout Plan.pdf · uploaded 27 Sep 2022Source
- DocumentLayout Plan.pdf · uploaded 27 Sep 2022Source
- DocumentAlpaine Landmark Kiwale_compressed-13.pdf · uploaded 2 Mar 2023Source
- DocumentAlpaine Landmark Kiwale_compressed-14.pdf · uploaded 2 Mar 2023Source
- DocumentAlpaine Landmark Kiwale_compressed-15.pdf · uploaded 2 Mar 2023Source
- DocumentAlpaine Landmark Kiwale_compressed-16.pdf · uploaded 2 Mar 2023Source
- DocumentAlpaine Landmark Kiwale_compressed-17.pdf · uploaded 2 Mar 2023Source
- DocumentAlpaine Landmark Kiwale_compressed-18.pdf · uploaded 2 Mar 2023Source
- DocumentAlpaine Landmark Kiwale_compressed-19.pdf · uploaded 2 Mar 2023Source
- DocumentAlpaine Landmark Kiwale_compressed-5.pdf · uploaded 2 Mar 2023Source
- DocumentAlpaine Landmark Kiwale_compressed-6.pdf · uploaded 2 Mar 2023Source
- DocumentAlpaine Landmark Kiwale_compressed-7.pdf · uploaded 2 Mar 2023Source
- DocumentAlpaine Landmark Kiwale_compressed-8.pdf · uploaded 2 Mar 2023Source
- DocumentAlpaine Landmark Kiwale_compressed-9.pdf · uploaded 2 Mar 2023Source
- DocumentAlpaine Landmark Kiwale_compressed-10.pdf · uploaded 2 Mar 2023Source
- DocumentAlpaine Landmark Kiwale_compressed-11.pdf · uploaded 2 Mar 2023Source
- DocumentAlpaine Landmark Kiwale_compressed-12.pdf · uploaded 2 Mar 2023Source
- Document1-min.pdf · uploaded 5 Mar 2024Source
- Document2-min.pdf · uploaded 5 Mar 2024Source
- Document3-min.pdf · uploaded 5 Mar 2024Source
- Document4-min.pdf · uploaded 5 Mar 2024Source
- Document5-min.pdf · uploaded 5 Mar 2024Source
- Document6-min.pdf · uploaded 5 Mar 2024Source
- Document7-min.pdf · uploaded 5 Mar 2024Source
- Document8-min.pdf · uploaded 5 Mar 2024Source
- Document9-min.pdf · uploaded 5 Mar 2024Source
- Document10-min.pdf · uploaded 5 Mar 2024Source
- Document11-min.pdf · uploaded 5 Mar 2024Source
- Document12-min.pdf · uploaded 5 Mar 2024Source
- Document13-min.pdf · uploaded 5 Mar 2024Source
- Document14-min.pdf · uploaded 5 Mar 2024Source
- Document15-min.pdf · uploaded 5 Mar 2024Source
- Document16-min.pdf · uploaded 5 Mar 2024Source
- DocumentLayout Highlighted_compressed.pdf · uploaded 5 Jul 2025Source
- Document1.pdf · uploaded 5 Jul 2025Source
- Document2.pdf · uploaded 5 Jul 2025Source
- Document3.pdf · uploaded 5 Jul 2025Source
- Document4.pdf · uploaded 5 Jul 2025Source
- Document5.pdf · uploaded 5 Jul 2025Source
- Document6.pdf · uploaded 5 Jul 2025Source
- Document7.pdf · uploaded 5 Jul 2025Source
- Document8.pdf · uploaded 5 Jul 2025Source
- Document9.pdf · uploaded 5 Jul 2025Source
- Document10.pdf · uploaded 5 Jul 2025Source
- Document11.pdf · uploaded 5 Jul 2025Source
- Document12.pdf · uploaded 5 Jul 2025Source
- Document13.pdf · uploaded 5 Jul 2025Source
- Document14.pdf · uploaded 5 Jul 2025Source
- DocumentLayout_compressed.pdf · uploaded 14 Feb 2026Source
- DocumentBuilding Approval.pdf · uploaded 14 Feb 2026Source
- DocumentBuilding Approval1.pdf · uploaded 14 Feb 2026Source
- DocumentBuilding Approval2.pdf · uploaded 14 Feb 2026Source
- DocumentBuilding Approval3.pdf · uploaded 14 Feb 2026Source
- DocumentBuilding Approval4.pdf · uploaded 14 Feb 2026Source
- DocumentBuilding Approval5.pdf · uploaded 14 Feb 2026Source
- DocumentBuilding Approval6.pdf · uploaded 14 Feb 2026Source
- DocumentBuilding Approval7.pdf · uploaded 14 Feb 2026Source
- DocumentBuilding Approval8.pdf · uploaded 14 Feb 2026Source
- DocumentBuilding Approval9.pdf · uploaded 14 Feb 2026Source
- DocumentBuilding Approval10.pdf · uploaded 14 Feb 2026Source
- DocumentBuilding Approval11.pdf · uploaded 14 Feb 2026Source
- DocumentBuilding Approval12.pdf · uploaded 14 Feb 2026Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvals8/1/1/2(P), SURVEY NO. 8/1/1
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Unit types
- 2BHK, 3BHK, Mhada, Shop236 units in all
- Address
- Gat No 8/1/1 And 8/1/1/2 P, Kivale, KivalePIN 412101
- Village
- Kivale, Mawal taluka
- Location
- 18.66279, 73.72512
- Designated bank account
- 86
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Boundaries
- North
- Mumbai Pune Expressway
- South
- Nalla
- East
- Property Bearing Survey No 79
- West
- Property Sr No 8 And Property Of Admane
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking236 units
139 of 236 units booked (59%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Alpine Astonia A Wing | 2BHK | 40.81 sq m · 439 sq ft | 1 | 1 |
| Alpine Astonia A Wing | 2BHK | 52.98 sq m · 570 sq ft | 13 | 11 |
| Alpine Astonia A Wing | 2BHK | 57.62 sq m · 620 sq ft | 50 | 48 |
| Alpine Astonia A Wing | 2BHK | 62.66 sq m · 674 sq ft | 2 | 2 |
| Alpine Astonia A Wing | 2BHK | 64.96 sq m · 699 sq ft | 2 | 2 |
| Alpine Astonia A Wing | 3BHK | 76.74 sq m · 826 sq ft | 10 | 8 |
| Alpine Astonia A Wing | 3BHK | 76.98 sq m · 829 sq ft | 1 | 0 |
| Alpine Astonia A Wing | 3BHK | 78.95 sq m · 850 sq ft | 18 | 17 |
Show all 33 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Alpine Astonia A Wing | 3BHK | 79.19 sq m · 852 sq ft | 2 | 1 |
| Alpine Astonia A Wing | Mhada | 40.81 sq m · 439 sq ft | 12 | 0 |
| Alpine Astonia A Wing | Shop | 22.99 sq m · 247 sq ft | 3 | 1 |
| Alpine Astonia A Wing | Shop | 34.84 sq m · 375 sq ft | 3 | 0 |
| Alpine Astonia A Wing | Shop | 37.41 sq m · 403 sq ft | 3 | 0 |
| Alpine Astonia A Wing | Shop | 39.69 sq m · 427 sq ft | 3 | 1 |
| Alpine Astonia A Wing | Shop | 51.76 sq m · 557 sq ft | 6 | 0 |
| Alpine Astonia B Wing | 2BHK | 40.81 sq m · 439 sq ft | 2 | 1 |
| Alpine Astonia B Wing | 2BHK | 52.98 sq m · 570 sq ft | 13 | 9 |
| Alpine Astonia B Wing | 2BHK | 57.89 sq m · 623 sq ft | 2 | 2 |
| Alpine Astonia B Wing | 2BHK | 62.66 sq m · 674 sq ft | 2 | 0 |
| Alpine Astonia B Wing | 3BHK | 70.95 sq m · 764 sq ft | 1 | 0 |
| Alpine Astonia B Wing | 3BHK | 71.88 sq m · 774 sq ft | 8 | 5 |
| Alpine Astonia B Wing | 3BHK | 71.95 sq m · 774 sq ft | 1 | 1 |
| Alpine Astonia B Wing | 3BHK | 76.74 sq m · 826 sq ft | 10 | 10 |
| Alpine Astonia B Wing | 3BHK | 76.98 sq m · 829 sq ft | 1 | 0 |
| Alpine Astonia B Wing | 3BHK | 78.95 sq m · 850 sq ft | 9 | 5 |
| Alpine Astonia B Wing | 3BHK | 81.18 sq m · 874 sq ft | 25 | 10 |
| Alpine Astonia B Wing | 3BHK | 97.55 sq m · 1,050 sq ft | 1 | 1 |
| Alpine Astonia B Wing | Mhada | 40.81 sq m · 439 sq ft | 11 | 0 |
| Alpine Astonia B Wing | Shop | 27 sq m · 291 sq ft | 3 | 1 |
| Alpine Astonia B Wing | Shop | 28.09 sq m · 302 sq ft | 3 | 1 |
| Alpine Astonia B Wing | Shop | 32.94 sq m · 355 sq ft | 6 | 1 |
| Alpine Astonia B Wing | Shop | 41.59 sq m · 448 sq ft | 3 | 0 |
| Alpine Astonia B Wing | Shop | 42.42 sq m · 457 sq ft | 6 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals3
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Engineer | Akshay Tupe | — |
| Engineer | Nilesh Role | — |
| Engineer | Shankar Saruk | — |
Source: MahaRERA project page. Contact details are not shown.