Sky Pavilion
Certificate SignedKatraj, Pune 411046 |Promoter: Kiran Developers
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Buildings
- 1
- Unit types
- Shop58 units in all
- Address
- 61/1d/1, Katraj, KatrajPIN 411046
- Designated bank account
- 21
- Developed in phases
- No
Registered transactions
15 registered documents matched to this project. Consideration is the value declared in the document; the Index II opens inside Deedo.
| Registered | Unit | Type | Consideration | ₹ / sq.ft | Document |
|---|---|---|---|---|---|
| 7 Aug 2026 | Bldg Name | Rental | ≈ ₹30,000 | — | |
| 30 Jul 2026 | Bldg Name · Unit SHOP | Rental | ≈ ₹30,000 | — | |
| 21 Jul 2026 | Sky Pavilion | Rental | ≈ ₹40,000 | — | |
| 1 Jul 2026 | Sky Pavilion | Rental | ≈ ₹50,000 | — | |
| 24 Jun 2026 | Rental | ≈ ₹50,000 | — | ||
| 14 May 2026 | Rental | ≈ ₹20,000 | — | ||
| 16 Mar 2026 | Rental | ≈ ₹50,000 | — | ||
| 11 Mar 2026 | Rental | ≈ ₹1.2 L | — | ||
| 23 Jan 2026 | Rental | ≈ ₹1.5 L | — | ||
| 18 Dec 2025 | Bldg Name | Rental | ≈ ₹80,000 | — | |
| 4 Oct 2025 | Sky Pavilion | Rental | ≈ ₹40,000 | — | |
| 30 Jul 2025 | Rental | ≈ ₹40,000 | — | ||
| 26 Jun 2025 | Rental | ≈ ₹80,000 | — | ||
| 18 Mar 2025 | Rental | ≈ ₹50,000 | — | ||
| 4 Dec 2024 | Rental | ≈ ₹1 L | — |
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion promised for 31 Dec 2025
The latest completion date on record passed 10 months ago.
- Registered
- 24 Jan 2022
- Promised
- 31 Dec 2025
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100032688 | 24 Jan 2022 | 31 Dec 2025 | 31 Dec 2025 | Kiran Developers | Project page |
1 building
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| Sky Pavilion | 4 | 58 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
43 of 58 units booked (74%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| Shop | 10.92 sq m · 118 sq ft | 1 | 1 |
| Shop | 10.99 sq m · 118 sq ft | 3 | 2 |
| Shop | 18.59 sq m · 200 sq ft | 1 | 1 |
| Shop | 20.08 sq m · 216 sq ft | 3 | 3 |
| Shop | 22.7 sq m · 244 sq ft | 1 | 1 |
| Shop | 22.71 sq m · 244 sq ft | 2 | 2 |
| Shop | 24.17 sq m · 260 sq ft | 3 | 2 |
| Shop | 27.83 sq m · 300 sq ft | 3 | 0 |
Show all 22 unit rowsShow fewer unit rows
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| Shop | 27.85 sq m · 300 sq ft | 3 | 1 |
| Shop | 27.97 sq m · 301 sq ft | 2 | 1 |
| Shop | 28.57 sq m · 308 sq ft | 3 | 3 |
| Shop | 28.58 sq m · 308 sq ft | 8 | 7 |
| Shop | 28.6 sq m · 308 sq ft | 3 | 1 |
| Shop | 30.02 sq m · 323 sq ft | 3 | 1 |
| Shop | 30.07 sq m · 324 sq ft | 1 | 1 |
| Shop | 31.55 sq m · 340 sq ft | 4 | 3 |
| Shop | 32.34 sq m · 348 sq ft | 4 | 4 |
| Shop | 33.04 sq m · 356 sq ft | 4 | 4 |
| Shop | 34.94 sq m · 376 sq ft | 2 | 2 |
| Shop | 34.96 sq m · 376 sq ft | 2 | 1 |
| Shop | 46.7 sq m · 503 sq ft | 1 | 1 |
| Shop | 68.62 sq m · 739 sq ft | 1 | 1 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
1 document held by Deedo, 187 filings listed on MahaRERA's project page
Finance
- PAN CardPan KIran Developers.pdf · uploaded 21 Dec 2021Source
Legal
Migrated
- 1 PAN CardPan KIran Developers.pdf · uploaded 21 Dec 2021Source
- 1 Copy of the legal title reportrara search report.pdf · uploaded 21 Dec 2021Source
- 1 Commencement Certificates / NA Order for plotted developmentKiran developers commencement certificate.pdf · uploaded 21 Dec 2021Source
- 1 Details of encumbrancesENCUMBRANCE DETAILS.pdf · uploaded 5 Jan 2022Source
Show all 188 documentsShow fewer documents
Migrated
- 1 Declaration in FORM BFrm B - Builder_compressed.pdf · uploaded 5 Jan 2022Source
- 1 Copy of Layout Approval (in case of layout)1 BUILDING LAYOUT Compress.pdf · uploaded 15 Jan 2022Source
- 1 Building Plan Approval / NA Order for plotted development01 - LOWER PARKING FLOOR PLAN.pdf · uploaded 15 Jan 2022Source
- 2 Building Plan Approval / NA Order for plotted development02 - UPPER PARKING FLOOR PLAN.pdf · uploaded 15 Jan 2022Source
- 3 Building Plan Approval / NA Order for plotted development03 - LOFT AND UPPER GROUND FLOOR PLAN.pdf · uploaded 15 Jan 2022Source
- 4 Building Plan Approval / NA Order for plotted development04 - FIRST AND SECOND FL PLAN.pdf · uploaded 15 Jan 2022Source
- 1 Declaration about Commencement Certificate2ND DECLARATION ABT COMMECEMENT CERTIFICATE.pdf · uploaded 15 Jan 2022Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA CERTIFICATE.pdf · uploaded 15 Jan 2022Source
- 1 Proforma of Allotment letterAllottment letter.pdf · uploaded 15 Jan 2022Source
- 2 Proforma of Allotment letterAGREEMENT TO SALE1.pdf · uploaded 15 Jan 2022Source
- 1 CERSAI detailsDeclaration cum Undertaking.pdf · uploaded 18 Jan 2022Source
- 2 Details of encumbrancesEncumbrance Details.pdf · uploaded 13 Jul 2023Source
- 2 CERSAI detailsCERSAI - PLOT.pdf · uploaded 13 Jul 2023Source
- 3 CERSAI detailsCERSAI - LG SHOPS.pdf · uploaded 13 Jul 2023Source
- 4 CERSAI detailsCERSAI - SF FLAT.pdf · uploaded 13 Jul 2023Source
- 5 CERSAI detailsCERSAI - TF FLATS.pdf · uploaded 13 Jul 2023Source
- 6 CERSAI detailsCERSAI - UG SHOPS.pdf · uploaded 13 Jul 2023Source
- 2 Copy of Layout Approval (in case of layout)LAYOUT.pdf · uploaded 25 Mar 2024Source
- 5 Building Plan Approval / NA Order for plotted development1RPLAN2.pdf · uploaded 25 Mar 2024Source
- 6 Building Plan Approval / NA Order for plotted development2RPALN2.pdf · uploaded 25 Mar 2024Source
- 7 Building Plan Approval / NA Order for plotted development3RPLAN2.pdf · uploaded 25 Mar 2024Source
- 2 Commencement Certificates / NA Order for plotted developmentCC 310323.pdf · uploaded 25 Mar 2024Source
- 7 CERSAI detailsCERSAI REPORT.pdf · uploaded 25 Mar 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)22 23 FORM 5.pdf · uploaded 25 Mar 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCH FORM 1.pdf · uploaded 5 Apr 2024Source
- 1 a Details of encumbrances concerned to Finance1 encubrance legal.pdf · uploaded 22 Feb 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 22 Feb 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 CA CER.pdf · uploaded 22 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 ENGG CER.pdf · uploaded 22 Feb 2025Source
- 1 Disclosure of sold/ booked inventory3 sold inventory.pdf · uploaded 22 Feb 2025Source
- 1 Deviation Report with respect to Allotment letter5 deviation allotment letter.pdf · uploaded 22 Feb 2025Source
- 1 b Details of encumbrances concerned to Legal1 encubrance legal.pdf · uploaded 22 Feb 2025Source
- 1 Deviation Report with respect to model copy of Agreement4 deviation agreement.pdf · uploaded 22 Feb 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)FORM 2A -2022.pdf · uploaded 22 Feb 2025Source
- 1 Proforma of Agreement for saleAGREEMENT TO SALE.pdf · uploaded 22 Feb 2025Source
- 1 Disclosure of Interest in Other Real Estate Organizations6 disclosure of interest in other project.pdf · uploaded 22 Feb 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)FORM 2A -2023.pdf · uploaded 22 Feb 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2A -2024.pdf · uploaded 22 Feb 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)FORM 5 CACER.pdf · uploaded 22 Feb 2025Source
- 1 Disclosure for secured/unsecured finance availed for the project2 secured finace aviled for project.pdf · uploaded 22 Feb 2025Source
- Form 5 (FY 2022-2023)22 23 FORM 5.pdf · uploaded 27 Dec 2025Source
- Form 5 (FY 2023-2024)FORM 5 CACER.pdf · uploaded 27 Dec 2025Source
- Form 5 (FY 2024-2025)Form 5.pdf · uploaded 27 Dec 2025Source
- Disclosure of Sold and Booked Inventory3 sold inventory.pdf · uploaded 29 Dec 2025Source
- Form 1Form 1.pdf · uploaded 29 Dec 2025Source
- Form 2FORM 2 ENGG CER.pdf · uploaded 29 Dec 2025Source
- Form 3FORM 3 CA CER.pdf · uploaded 29 Dec 2025Source
- Form 1Form 1.pdf · uploaded 29 Dec 2025Source
- Form 2FORM 2 ENGG CER.pdf · uploaded 29 Dec 2025Source
- Form 3FORM 3 CA CER.pdf · uploaded 29 Dec 2025Source
- Disclosure of Sold and Booked Inventory6 disclosure of interest in other project.pdf · uploaded 29 Dec 2025Source
- Form 1Form 1.pdf · uploaded 29 Dec 2025Source
- Form 2FORM 2 ENGG CER.pdf · uploaded 29 Dec 2025Source
- Form 3FORM 3 CA CER.pdf · uploaded 29 Dec 2025Source
- Disclosure of Sold and Booked Inventory6 disclosure of interest in other project.pdf · uploaded 29 Dec 2025Source
- Form 1Form 1.pdf · uploaded 29 Dec 2025Source
- Form 2FORM 2 ENGG CER.pdf · uploaded 29 Dec 2025Source
- Form 3FORM 3 CA CER.pdf · uploaded 29 Dec 2025Source
- Disclosure of Sold and Booked Inventory6 disclosure of interest in other project.pdf · uploaded 29 Dec 2025Source
- Form 1Form 1.pdf · uploaded 29 Dec 2025Source
- Form 2FORM 2 ENGG CER.pdf · uploaded 29 Dec 2025Source
- Form 3FORM 3 CA CER.pdf · uploaded 29 Dec 2025Source
- Disclosure of Sold and Booked Inventory6 disclosure of interest in other project.pdf · uploaded 29 Dec 2025Source
- Form 1Form 1.pdf · uploaded 29 Dec 2025Source
- Form 2FORM 2 ENGG CER.pdf · uploaded 29 Dec 2025Source
- Form 3FORM 3 CA CER.pdf · uploaded 29 Dec 2025Source
- Disclosure of Sold and Booked Inventory6 disclosure of interest in other project.pdf · uploaded 29 Dec 2025Source
- Form 1Form 1.pdf · uploaded 29 Dec 2025Source
- Form 2FORM 2 ENGG CER.pdf · uploaded 29 Dec 2025Source
- Form 3FORM 3 CA CER.pdf · uploaded 29 Dec 2025Source
- Disclosure of Sold and Booked Inventory6 disclosure of interest in other project.pdf · uploaded 29 Dec 2025Source
- Form 1Form 1.pdf · uploaded 29 Dec 2025Source
- Form 2FORM 2 ENGG CER.pdf · uploaded 29 Dec 2025Source
- Form 3FORM 3 CA CER.pdf · uploaded 29 Dec 2025Source
- Disclosure of Sold and Booked Inventory6 disclosure of interest in other project.pdf · uploaded 29 Dec 2025Source
- Form 1Form 1.pdf · uploaded 29 Dec 2025Source
- Form 2FORM 2 ENGG CER.pdf · uploaded 29 Dec 2025Source
- Form 3FORM 3 CA CER.pdf · uploaded 29 Dec 2025Source
- Disclosure of Sold and Booked Inventory6 disclosure of interest in other project.pdf · uploaded 29 Dec 2025Source
- Form 1Form 1.pdf · uploaded 29 Dec 2025Source
- Form 2FORM 2 ENGG CER.pdf · uploaded 29 Dec 2025Source
- Form 3FORM 3 CA CER.pdf · uploaded 29 Dec 2025Source
- Disclosure of Sold and Booked Inventory6 disclosure of interest in other project.pdf · uploaded 29 Dec 2025Source
- Form 1Form 1.pdf · uploaded 29 Dec 2025Source
- Form 2FORM 2 ENGG CER.pdf · uploaded 29 Dec 2025Source
- Form 3FORM 3 CA CER.pdf · uploaded 29 Dec 2025Source
- Disclosure of Sold and Booked Inventory6 disclosure of interest in other project.pdf · uploaded 29 Dec 2025Source
- Form 1Form 1.pdf · uploaded 29 Dec 2025Source
- Form 2FORM 2 ENGG CER.pdf · uploaded 29 Dec 2025Source
- Form 3FORM 3 CA CER.pdf · uploaded 29 Dec 2025Source
- Disclosure of Sold and Booked Inventory6 disclosure of interest in other project.pdf · uploaded 29 Dec 2025Source
- Form 1Form 1.pdf · uploaded 29 Dec 2025Source
- Form 2FORM 2 ENGG CER.pdf · uploaded 29 Dec 2025Source
- Form 3FORM 3 CA CER.pdf · uploaded 29 Dec 2025Source
- Disclosure of Sold and Booked Inventory6 disclosure of interest in other project.pdf · uploaded 29 Dec 2025Source
- Form 2A (FY 2021-2022)FORM 2A -2022.pdf · uploaded 29 Dec 2025Source
- Form 2A (FY 2022-2023)FORM 2A -2023.pdf · uploaded 29 Dec 2025Source
- Form 2A (FY 2023-2024)FORM 2A -2024.pdf · uploaded 29 Dec 2025Source
- Withdrawal Update Form 1Form 1.pdf · uploaded 30 Dec 2025Source
- Withdrawal Update Form 2FORM 2 ENGG CER.pdf · uploaded 30 Dec 2025Source
- Withdrawal Update Form 3FORM 3 CA CER.pdf · uploaded 30 Dec 2025Source
- Withdrawal Update Form 1Form 1 - architecture.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 1Form 1 - architecture.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 1Form 1 - architecture.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 1Form 1 - architecture.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 1Form 1 - architecture.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 1Form 1 - architecture.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 1Form 1 - architecture.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 1Form 1 - architecture.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 1Form 1 - architecture.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 1Form 1 - architecture.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 1Form 1 - architecture.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 1Form 1 - architecture.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 1Form 1 - architecture.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 1Form 1 - architecture.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 1Form 1 - architecture.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 1Form 1 - architecture.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 1Form 1 - architecture.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 1Form 1 - architecture.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 1Form 1 - architecture.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 1Form 1 - architecture.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 1Form 1 - architecture.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 1Form 1 - architecture.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 2Form 2 - Engineer.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 2Form 2 - Engineer.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 2Form 2 - Engineer.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 2Form 2 - Engineer.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 2Form 2 - Engineer.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 2Form 2 - Engineer.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 2Form 2 - Engineer.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 2Form 2 - Engineer.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 2Form 2 - Engineer.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 2Form 2 - Engineer.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 2Form 2 - Engineer.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 2Form 2 - Engineer.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 2Form 2 - Engineer.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 2Form 2 - Engineer.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 2Form 2 - Engineer.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 2Form 2 - Engineer.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 2Form 2 - Engineer.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 2Form 2 - Engineer.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 2Form 2 - Engineer.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 2Form 2 - Engineer.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 2Form 2 - Engineer.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 2Form 2 - Engineer.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 3Form -3 CA CERTIFICATE.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 3Form -3 CA CERTIFICATE.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 3Form -3 CA CERTIFICATE.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 3Form -3 CA CERTIFICATE.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 3Form -3 CA CERTIFICATE.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 3Form -3 CA CERTIFICATE.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 3Form -3 CA CERTIFICATE.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 3Form -3 CA CERTIFICATE.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 3Form -3 CA CERTIFICATE.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 3Form -3 CA CERTIFICATE.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 3Form -3 CA CERTIFICATE.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 3Form -3 CA CERTIFICATE.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 3Form -3 CA CERTIFICATE.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 3Form -3 CA CERTIFICATE.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 3Form -3 CA CERTIFICATE.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 3Form -3 CA CERTIFICATE.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 3Form -3 CA CERTIFICATE.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 3Form -3 CA CERTIFICATE.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 3Form -3 CA CERTIFICATE.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 3Form -3 CA CERTIFICATE.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 3Form -3 CA CERTIFICATE.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 3Form -3 CA CERTIFICATE.pdf · uploaded 19 Jan 2026Source
- Form 2A (FY 2024-2025)FORM 2A- ENGG CER. QUALITY.pdf · uploaded 19 Jan 2026Source
Technical
- Document1 BUILDING LAYOUT Compress.pdf · uploaded 15 Jan 2022Source
- Document01 - LOWER PARKING FLOOR PLAN.pdf · uploaded 15 Jan 2022Source
- Document02 - UPPER PARKING FLOOR PLAN.pdf · uploaded 15 Jan 2022Source
- Document03 - LOFT AND UPPER GROUND FLOOR PLAN.pdf · uploaded 15 Jan 2022Source
- Document04 - FIRST AND SECOND FL PLAN.pdf · uploaded 15 Jan 2022Source
- DocumentLAYOUT.pdf · uploaded 25 Mar 2024Source
- Document1RPLAN2.pdf · uploaded 25 Mar 2024Source
- Document2RPALN2.pdf · uploaded 25 Mar 2024Source
- Document3RPLAN2.pdf · uploaded 25 Mar 2024Source
Technical (Architect)
Technical (Engineer)
- DocumentForm 2 - Engineer.pdf · uploaded 19 Jan 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Katraj, Haveli taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- Gujarwadi Fhata Road Sr No 560
- South
- Property Of Dhyaneshwaer Kemade Sr No 506
- East
- Nala And Sr No 56
- West
- Pune Satara Road
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Swapnali Ghadge | — |
| Chartered accountant | Anil Yadav | — |
| Chartered accountant | Sanjay Suryawanshi | — |
| Engineer | Amit Kondhe | — |
Source: MahaRERA project page. Contact details are not shown.