Profitbay - Bt Kawade Road
Certificate SignedGhorpadi, Pune 411001 |Promoter: Venturespro Projects LLP
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Commercial
- Status on MahaRERA
- Certificate Signed
- Buildings
- 1
- Unit types
- Office space, Shop53 units in all
- Address
- Sr No 464/B, 465, 466, 467, BT Kawade Road, GhorpodiPIN 411001
- Designated bank account
- 85
- Developed in phases
- No
Location
Coordinates as published by MahaRERA
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion promised for 31 Aug 2026
The latest completion date on record passed 2 months ago.
- Registered
- 14 Mar 2022
- Promised
- 31 Aug 2026
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100033914 | 14 Mar 2022 | 31 Aug 2026 | 31 Aug 2026 | Venturespro Projects LLP | Project page |
1 building
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| Profitbay | 3 | 53 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
15 of 53 units booked (28%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| Office space | 14.64 sq m · 158 sq ft | 3 | 0 |
| Office space | 17.3 sq m · 186 sq ft | 3 | 0 |
| Office space | 20.31 sq m · 219 sq ft | 3 | 0 |
| Office space | 20.52 sq m · 221 sq ft | 3 | 0 |
| Office space | 34.87 sq m · 375 sq ft | 3 | 0 |
| Shop | 13.35 sq m · 144 sq ft | 15 | 5 |
| Shop | 18.38 sq m · 198 sq ft | 3 | 0 |
| Shop | 19.48 sq m · 210 sq ft | 3 | 3 |
Show all 15 unit rowsShow fewer unit rows
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| Shop | 19.64 sq m · 211 sq ft | 6 | 4 |
| Shop | 20.06 sq m · 216 sq ft | 3 | 2 |
| Shop | 22 sq m · 237 sq ft | 3 | 1 |
| Shop | 23.03 sq m · 248 sq ft | 1 | 0 |
| Shop | 24.59 sq m · 265 sq ft | 2 | 0 |
| Shop | 25.11 sq m · 270 sq ft | 1 | 0 |
| Shop | 39.17 sq m · 422 sq ft | 1 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
1 document held by Deedo, 227 filings listed on MahaRERA's project page
Finance
- PAN CardFirm PAN Card.PDF · uploaded 17 Jan 2022Source
Legal
- Declaration Form BProfitbay BTKR - Form B Affidavit Cum Declaration.pdf · uploaded 4 Feb 2022Source
- Legal Title reportSearch and title report.pdf · uploaded 5 Mar 2022Source
- Declaration Form B06 Form B - BT Kawde Road.pdf · uploaded 8 Dec 2023Source
- Legal Title reportLTR_11zon.pdf · uploaded 5 Jan 2024Source
- Declaration Form B01 Form B-Affidavit cum declaration_Profitbay BT Kawade Road_rotated.pdf · uploaded 10 Oct 2024Source
Migrated
- 1 PAN CardFirm PAN Card.PDF · uploaded 17 Jan 2022Source
Show all 228 documentsShow fewer documents
Migrated
- 1 Copy of Layout Approval (in case of layout)Profitbay BTKR - Approved Plan_compressed.pdf · uploaded 17 Jan 2022Source
- 1 Building Plan Approval / NA Order for plotted developmentProfitbay BTKR - Approved Plan_compressed.pdf · uploaded 17 Jan 2022Source
- 1 Commencement Certificates / NA Order for plotted developmentProfitbay BTKR - Commencement Certificate-compressed.pdf · uploaded 17 Jan 2022Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Profitbay BTKR - Architect Certificate-compressed.pdf · uploaded 17 Jan 2022Source
- 1 Declaration about Commencement CertificateDeclaration about Certificate.pdf · uploaded 2 Feb 2022Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate Form 2.pdf · uploaded 2 Feb 2022Source
- 1 Details of encumbrancesProfitbay BTKR_No Encumbrances.PDF · uploaded 4 Feb 2022Source
- 1 Declaration in FORM BProfitbay BTKR - Form B Affidavit Cum Declaration.pdf · uploaded 4 Feb 2022Source
- 1 CERSAI detailsProfitbay BTKR_CERSAI_Search_Report.pdf · uploaded 4 Feb 2022Source
- 1 Proforma of Allotment letterDRAFT SHOP PURCHASE AGREEMENT - Profit Bay - BT Kawde Road.pdf · uploaded 4 Feb 2022Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Profitbay BTKR - Form 3 CA Certificate Compressed.pdf · uploaded 8 Feb 2022Source
- 1 Copy of the legal title reportSearch and title report.pdf · uploaded 5 Mar 2022Source
- 2 Proforma of Allotment letterProfitbay BTKR - Allotment Letter.pdf · uploaded 5 Mar 2022Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Profitbay BT Kawade Road 30 3 2022_Signed.pdf · uploaded 6 Mar 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Profitbay BT Kawade Road 30 6 2022_Signed.pdf · uploaded 6 Mar 2023Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Profitbay BT Kawade Road 30 9 2022_Signed_compressed.pdf · uploaded 6 Mar 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5_Profitbay BT Kawade Road_31st March 2022_3_11zon.pdf · uploaded 15 Mar 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Q4 01-04-2022 - 02 Form 2 Engineer Certificate.pdf · uploaded 18 Aug 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Q1 01-07-2022 - 02 Form 2 Engineer Certificate.pdf · uploaded 18 Aug 2023Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Q2 01-10-2022 - 02 Form 2 Engineer Certificate.pdf · uploaded 18 Aug 2023Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Q3 01-01-2023 - 02 Form 2 Engineer Certificate.pdf · uploaded 18 Aug 2023Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Q4 01-04-2023 - 02 Form 2 Engineer Certificate.pdf · uploaded 18 Aug 2023Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Q1 02-07-2023 - 02 Form 2 Engineer Certificate_11zon.pdf · uploaded 18 Aug 2023Source
- 2 Details of encumbrances07 Encumbrances concerned to Finance.pdf · uploaded 23 Aug 2023Source
- 3 a Details of encumbrances concerned to Finance08 Encumbrances concerned to Legal.pdf · uploaded 23 Aug 2023Source
- 1 b Details of encumbrances concerned to Legal08 Encumbrances concerned to Legal.pdf · uploaded 23 Aug 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Q4 01-04-2022.pdf · uploaded 23 Aug 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Q1 01-07-2022.pdf · uploaded 23 Aug 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Q2 01-10-2022.pdf · uploaded 23 Aug 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Q3 01-01-2023.pdf · uploaded 23 Aug 2023Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Q4 01-04-2023.pdf · uploaded 23 Aug 2023Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - 30-06-2023.pdf · uploaded 23 Aug 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)01 Form- 2A Quality Assurance Format_31-03-22.pdf · uploaded 23 Aug 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)02 Form- 2A Quality Assurance Format_31-03-23.pdf · uploaded 23 Aug 2023Source
- 1 Disclosure of sold/ booked inventoryQ4 Sold - Unsold - 31-03-2022.pdf · uploaded 23 Aug 2023Source
- 2 Disclosure of sold/ booked inventoryQ1 Sold - Unsold - 30-06-2022.pdf · uploaded 23 Aug 2023Source
- 3 Disclosure of sold/ booked inventoryQ2 Sold - Unsold - 30-09-2022.pdf · uploaded 23 Aug 2023Source
- 4 Disclosure of sold/ booked inventoryQ3 Sold - Unsold - 31-12-2022.pdf · uploaded 23 Aug 2023Source
- 5 Disclosure of sold/ booked inventoryQ4 Sold - Unsold - 31-03-2023.pdf · uploaded 23 Aug 2023Source
- 6 Disclosure of sold/ booked inventoryQ1 Sold - Unsold - 30-06-2023.pdf · uploaded 23 Aug 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the same09 Declaration For Designated Bank Account_Profitbay BT Kawade Road.pdf · uploaded 23 Aug 2023Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)1 Form 3 31-12-2022.pdf · uploaded 24 Aug 2023Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)2 Form 3 31-03-2023.pdf · uploaded 24 Aug 2023Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)3 Form 3 30-06-2023.pdf · uploaded 24 Aug 2023Source
- 1 Proforma of Agreement for saleAgr to Sell_B T Kawade Road_RERA format.pdf · uploaded 15 Sep 2023Source
- 3 Proforma of Allotment letterAllotment Letter .pdf · uploaded 15 Sep 2023Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Q2 Form 1 -30-09-2023.pdf · uploaded 10 Oct 2023Source
- 2 Copy of Layout Approval (in case of layout)PLAN-01-06_11zon_rotated.pdf · uploaded 14 Oct 2023Source
- 2 Commencement Certificates / NA Order for plotted developmentCC-2907-22 DT 03-02-2023_11zon.pdf · uploaded 14 Oct 2023Source
- 2 Declaration about Commencement Certificate00 Declaration about commencement (In case of revised commencement)_Profitbay BT Kawdae Road.pdf · uploaded 14 Oct 2023Source
- 7 Disclosure of sold/ booked inventorySold - Unsold - 30-09-2023 Profitbay BT Kawade Road.pdf · uploaded 17 Oct 2023Source
- 4 a Details of encumbrances concerned to Finance07 Encumbrances concerned to Finance_Profitbay BT Kawade Road.pdf · uploaded 7 Dec 2023Source
- 2 b Details of encumbrances concerned to Legal07 Encumbrances concerned to Finance_Profitbay BT Kawade Road.pdf · uploaded 7 Dec 2023Source
- 2 Declaration in FORM B06 Form B - BT Kawde Road.pdf · uploaded 8 Dec 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)VenturesPro Projects LLP (Profitbay BT Kawade Road).pdf · uploaded 21 Dec 2023Source
- 2 CERSAI detailsCERSAI_Search_Report_200291172543_For_Asset_Based_Search_26_12_2023_12_20_46_989 (1).pdf · uploaded 27 Dec 2023Source
- 2 Copy of the legal title reportLTR_11zon.pdf · uploaded 5 Jan 2024Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 6 Jan 2024Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - B T Kawadwde Road - 31 12 2023.pdf · uploaded 2 Feb 2024Source
- 2 Building Plan Approval / NA Order for plotted developmentPLAN-02-06_2_11zon.pdf · uploaded 26 Feb 2024Source
- 3 Building Plan Approval / NA Order for plotted developmentPLAN-03-06_3_11zon.pdf · uploaded 26 Feb 2024Source
- 4 Building Plan Approval / NA Order for plotted developmentPLAN-04-06_4_11zon.pdf · uploaded 26 Feb 2024Source
- 5 Building Plan Approval / NA Order for plotted developmentPLAN-05-06_5_11zon.pdf · uploaded 26 Feb 2024Source
- 6 Building Plan Approval / NA Order for plotted developmentPLAN-06-06_6_11zon.pdf · uploaded 26 Feb 2024Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)00 Form 2 Engineer Certificate Sep 2023.pdf · uploaded 26 Feb 2024Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)01 Form 2 Engineer Certificate Dec 2023.pdf · uploaded 26 Feb 2024Source
- 8 Disclosure of sold/ booked inventory04 Declaration for sold unsold format.pdf · uploaded 26 Feb 2024Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Profitbay BT Kawade Road Signed compressed.pdf · uploaded 26 Feb 2024Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Profitbay BT Kawade Road Signed compressed.pdf · uploaded 26 Feb 2024Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)04 Form 1 -31-03-2024.pdf · uploaded 8 Apr 2024Source
- 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)Venturespro - Profitbat BT Kawade Road Form 3 - Mar 24.pdf · uploaded 19 Jun 2024Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)PROFITBAY BT KAWADF ROAD FORM 2 31032024.pdf · uploaded 25 Jun 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)PROFITBAY BT KAWADF ROAD FORM 2A 28032023.pdf · uploaded 25 Jun 2024Source
- 9 Disclosure of sold/ booked inventoryPROFITBAY BT KAWADF ROAD Sold Unsold 31032024.pdf · uploaded 25 Jun 2024Source
- 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)Profitbay BT Kawade - Mar 24.pdf · uploaded 10 Jul 2024Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Profitbay B T Kawade RD 30-06-2024.pdf · uploaded 11 Jul 2024Source
- 10 Disclosure of sold/ booked inventoryProfitbay BT Kawdae Road -Sold Unsold-30-06-2024.pdf · uploaded 12 Aug 2024Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)Profitbay BT Kawdae Road -Form 2 - 30-06-2024.pdf · uploaded 13 Aug 2024Source
- 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - 30-06-2024- Final_compressed.pdf · uploaded 13 Aug 2024Source
- 1 Declaration in FORM B01 Form B-Affidavit cum declaration_Profitbay BT Kawade Road_rotated.pdf · uploaded 10 Oct 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Profitbay B T Kawade RD 30-09-2024.pdf · uploaded 17 Oct 2024Source
- 1 Disclosure of Interest in Other Real Estate Organizations01 Disclosure of Interest- Ashish Jain.pdf · uploaded 17 Oct 2024Source
- 2 Disclosure of Interest in Other Real Estate Organizations02 Disclosure of Interest- Bhawarlal Jain.pdf · uploaded 17 Oct 2024Source
- 3 Disclosure of Interest in Other Real Estate Organizations03 Disclosure of Interest- Manish Dilip Mehta.pdf · uploaded 17 Oct 2024Source
- 4 Disclosure of Interest in Other Real Estate Organizations04 Disclosure of Interest- Dinesh Dilip Mehta.pdf · uploaded 17 Oct 2024Source
- 5 Disclosure of Interest in Other Real Estate Organizations05 Disclosure of Interest- Dhanesh Dilip Mehta.pdf · uploaded 17 Oct 2024Source
- 6 Disclosure of Interest in Other Real Estate Organizations06 Disclosure of Interest- Rajesh Shiram Dhawan.pdf · uploaded 17 Oct 2024Source
- 7 Disclosure of Interest in Other Real Estate Organizations07 Disclosure of Interest- Rakshit Oswal.pdf · uploaded 17 Oct 2024Source
- 8 Disclosure of Interest in Other Real Estate Organizations08 Disclosure of Interest- Sunil Grover.pdf · uploaded 17 Oct 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - 30-09-2024.pdf · uploaded 18 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - 30-09-2024.pdf · uploaded 18 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - 30-09-2024.pdf · uploaded 18 Oct 2024Source
- 2 Disclosure of sold/ booked inventorySold Unsold - 30-09-2024.pdf · uploaded 18 Oct 2024Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFormat - A.pdf · uploaded 19 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Profitbay BT Kawdae - Form 5 - 05-09-2024.pdf · uploaded 15 Nov 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Copy.pdf · uploaded 9 Jan 2025Source
- 1 Disclosure of sold/ booked inventorySold - Unsold.pdf · uploaded 9 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3ready.pdf · uploaded 10 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Profitbay B T Kawade - Form 2 - 31-12-2024.pdf · uploaded 15 Feb 2025Source
- 1 Copy of Layout Approval (in case of layout)PLAN-01-06_11zon.pdf · uploaded 28 Mar 2025Source
- 1 Commencement Certificates / NA Order for plotted developmentBP -CC -3223-24 DT-24-01-2025.pdf · uploaded 28 Mar 2025Source
- 1 Building Plan Approval / NA Order for plotted developmentPLAN 06-06 compressed.pdf · uploaded 28 Mar 2025Source
- 1 Declaration about Commencement CertificateFINAL Declaration about commencement (In case of revised commencement)_Eternia Phase 2 (1).pdf · uploaded 28 Mar 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Final Form-3.pdf · uploaded 2 Apr 2025Source
- 1 Disclosure of sold/ booked inventoryFinal SoldUnsold.pdf · uploaded 2 Apr 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Profitbay BT Kawade Road.pdf · uploaded 16 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Profitbay BT Kawade Road.pdf · uploaded 19 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 3 - Profitbay BT Kawade Road.pdf · uploaded 19 Apr 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)02 Form 2 B T Kawade March 2024.pdf · uploaded 19 Apr 2025Source
- 1 Disclosure of sold/ booked inventorySold - Unsold - Eternia Phase 2.pdf · uploaded 19 Apr 2025Source
- 2 Disclosure of sold/ booked inventorySold - Unsold -Profitbay BT Kawade Road.pdf · uploaded 19 Apr 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 23 Jul 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_ProfitBay BT Kawade_June.pdf · uploaded 23 Jul 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 23 Jul 2025Source
- 1 Disclosure of sold/ booked inventorySold Unsold.pdf · uploaded 23 Jul 2025Source
- Form 1Form 1.pdf · uploaded 31 Jul 2025Source
- Form 2Form 2.pdf · uploaded 31 Jul 2025Source
- Form 3Form 3_ProfitBay BT Kawade_June.pdf · uploaded 31 Jul 2025Source
- Disclosure of Sold and Booked InventorySold Unsold.pdf · uploaded 31 Jul 2025Source
- Form 5 (FY 2024-2025)Form 5 - BT kawade.pdf · uploaded 4 Oct 2025Source
- Form 1Form 1.pdf · uploaded 28 Oct 2025Source
- Form 2Form 2.pdf · uploaded 28 Oct 2025Source
- Form 3Form 3.pdf · uploaded 28 Oct 2025Source
- Disclosure of Sold and Booked InventoryD-Sold unsold.pdf · uploaded 28 Oct 2025Source
- Form 1Form 1.pdf · uploaded 28 Oct 2025Source
- Form 2Form 2.pdf · uploaded 28 Oct 2025Source
- Form 3Form 3.pdf · uploaded 28 Oct 2025Source
- Disclosure of Sold and Booked InventoryD-Sold unsold.pdf · uploaded 28 Oct 2025Source
- Form 1Form 1.pdf · uploaded 28 Oct 2025Source
- Form 2Form 2.pdf · uploaded 28 Oct 2025Source
- Form 3Form 3.pdf · uploaded 28 Oct 2025Source
- Disclosure of Sold and Booked InventoryD-Sold Unsold.pdf · uploaded 28 Oct 2025Source
- Form 1Form 1.pdf · uploaded 28 Oct 2025Source
- Form 2Form 2.pdf · uploaded 28 Oct 2025Source
- Form 3Form 3.pdf · uploaded 28 Oct 2025Source
- Disclosure of Sold and Booked InventoryD-Sold unsold.pdf · uploaded 28 Oct 2025Source
- Form 1Form 1.pdf · uploaded 28 Oct 2025Source
- Form 2Form 2.pdf · uploaded 28 Oct 2025Source
- Form 3Form 3.pdf · uploaded 28 Oct 2025Source
- Disclosure of Sold and Booked InventoryD-Sold unsold.pdf · uploaded 28 Oct 2025Source
- Form 1Form 1.pdf · uploaded 28 Oct 2025Source
- Form 2Form 2.pdf · uploaded 28 Oct 2025Source
- Form 3Form 3.pdf · uploaded 28 Oct 2025Source
- Disclosure of Sold and Booked InventoryD-Sold Unsold.pdf · uploaded 28 Oct 2025Source
- Form 1Form 1.pdf · uploaded 28 Oct 2025Source
- Form 2Form 2.pdf · uploaded 28 Oct 2025Source
- Form 3Form 3.pdf · uploaded 28 Oct 2025Source
- Disclosure of Sold and Booked InventoryD-Sold Unsold.pdf · uploaded 28 Oct 2025Source
- Form 1Form 1.pdf · uploaded 28 Oct 2025Source
- Form 2Form 2.pdf · uploaded 28 Oct 2025Source
- Form 3Form 3.pdf · uploaded 28 Oct 2025Source
- Disclosure of Sold and Booked InventoryD-Sold unsold.pdf · uploaded 28 Oct 2025Source
- Form 1form 1.pdf · uploaded 28 Oct 2025Source
- Form 2Form 2.pdf · uploaded 28 Oct 2025Source
- Form 3Form 3.pdf · uploaded 28 Oct 2025Source
- Disclosure of Sold and Booked InventoryD-Sold unsold.pdf · uploaded 28 Oct 2025Source
- Form 1Form 1.pdf · uploaded 28 Oct 2025Source
- Form 2Form 2.pdf · uploaded 28 Oct 2025Source
- Form 3Form 3.pdf · uploaded 28 Oct 2025Source
- Disclosure of Sold and Booked InventoryD-Sold unsold.pdf · uploaded 28 Oct 2025Source
- Form 1Form 1.pdf · uploaded 28 Oct 2025Source
- Form 2Form 2.pdf · uploaded 28 Oct 2025Source
- Form 3Form 3.pdf · uploaded 28 Oct 2025Source
- Disclosure of Sold and Booked InventoryD-Sold Unsold.pdf · uploaded 28 Oct 2025Source
- Form 1Form 1.pdf · uploaded 28 Oct 2025Source
- Form 2Form 2.pdf · uploaded 28 Oct 2025Source
- Form 3Form 3.pdf · uploaded 28 Oct 2025Source
- Disclosure of Sold and Booked InventoryD-Sold unsold.pdf · uploaded 28 Oct 2025Source
- Form 1Form 1.pdf · uploaded 28 Oct 2025Source
- Form 2Form 2.pdf · uploaded 28 Oct 2025Source
- Form 3Form 3.pdf · uploaded 28 Oct 2025Source
- Disclosure of Sold and Booked InventoryD-sold unsold.pdf · uploaded 28 Oct 2025Source
- Form 2A (FY 2024-2025)Profitbay B.T. Kawdae Road.pdf · uploaded 31 Oct 2025Source
- Form 2A (FY 2021-2022)01 Form- 2A Quality Assurance Format_31-03-22.pdf · uploaded 1 Nov 2025Source
- Form 2A (FY 2022-2023)2023.pdf · uploaded 1 Nov 2025Source
- Form 2A (FY 2023-2024)2024.pdf · uploaded 1 Nov 2025Source
- Form 5 (FY 2021-2022)01 21-22.pdf · uploaded 1 Nov 2025Source
- Form 5 (FY 2022-2023)02 22-23.pdf · uploaded 1 Nov 2025Source
- Form 5 (FY 2023-2024)03 23-24.pdf · uploaded 1 Nov 2025Source
- Withdrawal Update Form 1Form 1.pdf · uploaded 3 Nov 2025Source
- Withdrawal Update Form 2Form 02.pdf · uploaded 3 Nov 2025Source
- Withdrawal Update Form 3Form 3 - BT Kawade - Signed.pdf · uploaded 3 Nov 2025Source
- Withdrawal Update Form 1Form 1.pdf · uploaded 4 Nov 2025Source
- Withdrawal Update Form 2Form 02.pdf · uploaded 4 Nov 2025Source
- Withdrawal Update Form 3Form 3 - BT Kawade - Signed.pdf · uploaded 4 Nov 2025Source
- Withdrawal Update Form 1Form 1 - BT Kawade - Dec 25.pdf · uploaded 13 Feb 2026Source
- Withdrawal Update Form 2Profitbay BT Kawade RD Form 2 Dec 25.pdf · uploaded 13 Feb 2026Source
- Withdrawal Update Form 3Form 3 Profitbay B T Kawade RD Signed.pdf · uploaded 13 Feb 2026Source
- Withdrawal Update Form 1Form 1 MArch 26.pdf · uploaded 19 May 2026Source
- Withdrawal Update Form 2Form 2 MArch 26.pdf · uploaded 19 May 2026Source
- Withdrawal Update Form 3Form 3 Sign.pdf · uploaded 19 May 2026Source
- Withdrawal Update Form 1Form 1 MArch 26.pdf · uploaded 24 Sep 2026Source
- Withdrawal Update Form 1Form 1.pdf · uploaded 24 Sep 2026Source
- Withdrawal Update Form 2Form 2 MArch 26.pdf · uploaded 24 Sep 2026Source
- Withdrawal Update Form 202 Form 2 B T Kawade.pdf · uploaded 24 Sep 2026Source
- Withdrawal Update Form 3FORM 3 JUNE 26 SIGNED.pdf · uploaded 24 Sep 2026Source
- Withdrawal Update Form 3FORM 3 JUNE 26 SIGNED.pdf · uploaded 24 Sep 2026Source
- Form 2A (FY 2025-2026)18 09 2026 - 02 Form - 2A Quality Assurance Revised - format 25-26 - Profitbay B T Kawade RD.pdf · uploaded 29 Sep 2026Source
Technical
- DocumentProfitbay BTKR - Approved Plan_compressed.pdf · uploaded 17 Jan 2022Source
- DocumentProfitbay BTKR - Approved Plan_compressed.pdf · uploaded 17 Jan 2022Source
- DocumentPLAN-01-06_11zon_rotated.pdf · uploaded 14 Oct 2023Source
- DocumentPLAN-02-06_2_11zon.pdf · uploaded 26 Feb 2024Source
- DocumentPLAN-03-06_3_11zon.pdf · uploaded 26 Feb 2024Source
- DocumentPLAN-04-06_4_11zon.pdf · uploaded 26 Feb 2024Source
- DocumentPLAN-05-06_5_11zon.pdf · uploaded 26 Feb 2024Source
- DocumentPLAN-06-06_6_11zon.pdf · uploaded 26 Feb 2024Source
- DocumentPLAN-01-06_11zon.pdf · uploaded 28 Mar 2025Source
- DocumentPLAN 06-06 compressed.pdf · uploaded 28 Mar 2025Source
Technical (Architect)
- DocumentForm 1 - Profitbay B T Kawade RD 30-09-2024.pdf · uploaded 17 Oct 2024Source
- DocumentForm 1 - 30-09-2024.pdf · uploaded 18 Oct 2024Source
- DocumentForm 1 - Copy.pdf · uploaded 9 Jan 2025Source
- DocumentForm 1 - Profitbay BT Kawade Road.pdf · uploaded 16 Apr 2025Source
- DocumentForm 1.pdf · uploaded 23 Jul 2025Source
- DocumentForm 1.pdf · uploaded 24 Sep 2026Source
Technical (Engineer)
- DocumentForm 2 - 30-09-2024.pdf · uploaded 18 Oct 2024Source
- DocumentProfitbay B T Kawade - Form 2 - 31-12-2024.pdf · uploaded 15 Feb 2025Source
- DocumentForm 3 - Profitbay BT Kawade Road.pdf · uploaded 19 Apr 2025Source
- Document02 Form 2 B T Kawade March 2024.pdf · uploaded 19 Apr 2025Source
- DocumentForm 2.pdf · uploaded 23 Jul 2025Source
- Document02 Form 2 B T Kawade.pdf · uploaded 24 Sep 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Ghorpadi, Haveli taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- Sr No 53-1
- South
- Sr No 53-4
- East
- Moujje Hadapsar
- West
- BT Kawade Road
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Jay Aeram | — |
| Chartered accountant | Anuj Agrawal | — |
| Chartered accountant | Patel and Sharma | — |
| Engineer | JW Consultant | — |
| Engineer | Ravindra Patil | — |
| Other | Lashkaria | — |
Source: MahaRERA project page. Contact details are not shown.