Dhanasampada
Certificate SignedErandwana, Pune 411004 |Promoter: Ranjekar Realty LLP
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Buildings
- 1
- Unit types
- Ext Owner 1001 3BHK, Ext Owner 1002 3BHK, Ext Owner 101 3BHK, Ext Owner 1101 3BHK, Ext Owner 201 3BHK, Ext Owner 301 2BHK, Ext Owner 302 2BHK, Ext Owner 401 2BHK, Ext Owner 402 2BHK, Ext Owner 501 2BHK, Ext Owner 502 2BHK, Ext Owner 601 3BHK, Ext Owner 701 3BHK, Ext Owner 702 3BHK, Ext Owner 703 3BHK, Ext Owner 801 3BHK, Ext Owner 802 3BHK, Ext Owner 803 3BHK, Ext Owner 901 2BHK, Ext Owner 902 2BHK, FLAT 1003 2BHK, FLAT 1004 2BHK, Flat 102 3BHK, Flat 103 2BHK, Flat 104 2BHK, FLAT 1102 3BHK, FLAT 1103 2BHK, FLAT 1104 2BHK, FLAT 202 3BHK, FLAT 203 2BHK, FLAT 204 2BHK, FLAT 303 3BHK, FLAT 304 2BHK, FLAT 305 2BHK, FLAT 403 3BHK, FLAT 404 2BHK, FLAT 405 2BHK, FLAT 503 3BHK, FLAT 504 2BHK, FLAT 505 2BHK, FLAT 602 3BHK, FLAT 603 2BHK, FLAT 604 2BHK, FLAT 903 3BHK, FLAT 904 2BHK, FLAT 905 2BHK46 units in all
- Address
- Plot No. 8 + 9, S. No. 37/A/2, CTS No. 149, Dhansampada Co-operative Housing Society, Erandawane, Pune 411004, Dhansampada Co-operative society, ErandwanePIN 411004
- Designated bank account
- 76
- Developed in phases
- No
Location
Coordinates as published by MahaRERA
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion pushed back 4 months
- Registered
- 22 Sep 2023
- Promised
- 31 Mar 2027
- Revised
- 31 Jul 2027
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100052758 | 22 Sep 2023 | 31 Mar 2027 | 31 Jul 2027 | Ranjekar Realty LLP | Project page |
1 building
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| Dhansampada | 12 | 46 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
7 of 46 units booked (15%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| Ext Owner 1001 3BHK | 126.42 sq m · 1,361 sq ft | 1 | 0 |
| Ext Owner 1002 3BHK | 98.97 sq m · 1,065 sq ft | 1 | 0 |
| Ext Owner 101 3BHK | 92.63 sq m · 997 sq ft | 1 | 0 |
| Ext Owner 1101 3BHK | 134.92 sq m · 1,452 sq ft | 1 | 0 |
| Ext Owner 201 3BHK | 92.63 sq m · 997 sq ft | 1 | 0 |
| Ext Owner 301 2BHK | 62.82 sq m · 676 sq ft | 1 | 0 |
| Ext Owner 302 2BHK | 66.11 sq m · 712 sq ft | 1 | 0 |
| Ext Owner 401 2BHK | 62.82 sq m · 676 sq ft | 1 | 0 |
Show all 46 unit rowsShow fewer unit rows
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| Ext Owner 402 2BHK | 66.11 sq m · 712 sq ft | 1 | 0 |
| Ext Owner 501 2BHK | 65.5 sq m · 705 sq ft | 1 | 1 |
| Ext Owner 502 2BHK | 66.11 sq m · 712 sq ft | 1 | 1 |
| Ext Owner 601 3BHK | 136.53 sq m · 1,470 sq ft | 1 | 0 |
| Ext Owner 701 3BHK | 117.25 sq m · 1,262 sq ft | 1 | 0 |
| Ext Owner 702 3BHK | 98.97 sq m · 1,065 sq ft | 1 | 0 |
| Ext Owner 703 3BHK | 105.27 sq m · 1,133 sq ft | 1 | 0 |
| Ext Owner 801 3BHK | 108.5 sq m · 1,168 sq ft | 1 | 0 |
| Ext Owner 802 3BHK | 98.97 sq m · 1,065 sq ft | 1 | 0 |
| Ext Owner 803 3BHK | 105.27 sq m · 1,133 sq ft | 1 | 0 |
| Ext Owner 901 2BHK | 65.5 sq m · 705 sq ft | 1 | 0 |
| Ext Owner 902 2BHK | 66.11 sq m · 712 sq ft | 1 | 0 |
| FLAT 1003 2BHK | 76.84 sq m · 827 sq ft | 1 | 0 |
| FLAT 1004 2BHK | 73.98 sq m · 796 sq ft | 1 | 0 |
| Flat 102 3BHK | 98.97 sq m · 1,065 sq ft | 1 | 0 |
| Flat 103 2BHK | 60 sq m · 646 sq ft | 1 | 0 |
| Flat 104 2BHK | 60 sq m · 646 sq ft | 1 | 0 |
| FLAT 1102 3BHK | 98.97 sq m · 1,065 sq ft | 1 | 0 |
| FLAT 1103 2BHK | 76.84 sq m · 827 sq ft | 1 | 0 |
| FLAT 1104 2BHK | 73.98 sq m · 796 sq ft | 1 | 0 |
| FLAT 202 3BHK | 98.97 sq m · 1,065 sq ft | 1 | 0 |
| FLAT 203 2BHK | 60 sq m · 646 sq ft | 1 | 0 |
| FLAT 204 2BHK | 60 sq m · 646 sq ft | 1 | 0 |
| FLAT 303 3BHK | 98.97 sq m · 1,065 sq ft | 1 | 0 |
| FLAT 304 2BHK | 60 sq m · 646 sq ft | 1 | 0 |
| FLAT 305 2BHK | 60 sq m · 646 sq ft | 1 | 0 |
| FLAT 403 3BHK | 98.97 sq m · 1,065 sq ft | 1 | 0 |
| FLAT 404 2BHK | 60 sq m · 646 sq ft | 1 | 0 |
| FLAT 405 2BHK | 60 sq m · 646 sq ft | 1 | 0 |
| FLAT 503 3BHK | 98.97 sq m · 1,065 sq ft | 1 | 1 |
| FLAT 504 2BHK | 60 sq m · 646 sq ft | 1 | 0 |
| FLAT 505 2BHK | 60 sq m · 646 sq ft | 1 | 0 |
| FLAT 602 3BHK | 98.97 sq m · 1,065 sq ft | 1 | 1 |
| FLAT 603 2BHK | 60 sq m · 646 sq ft | 1 | 1 |
| FLAT 604 2BHK | 60 sq m · 646 sq ft | 1 | 0 |
| FLAT 903 3BHK | 98.97 sq m · 1,065 sq ft | 1 | 1 |
| FLAT 904 2BHK | 60 sq m · 646 sq ft | 1 | 1 |
| FLAT 905 2BHK | 60 sq m · 646 sq ft | 1 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
2 documents held by Deedo, 126 filings listed on MahaRERA's project page
Show all 128 documentsShow fewer documents
Migrated
- 1 a Details of encumbrances concerned to FinanceDeclaration of no Encumbrance - Finance.pdf · uploaded 15 Jun 2023Source
- 2 a Details of encumbrances concerned to FinanceDeclaration of no Encumbrance - Legal DONE.pdf · uploaded 15 Jun 2023Source
- 1 b Details of encumbrances concerned to LegalDeclaration of no Encumbrance - Finance.pdf · uploaded 15 Jun 2023Source
- 2 b Details of encumbrances concerned to LegalDeclaration of no Encumbrance - Legal DONE.pdf · uploaded 15 Jun 2023Source
- 1 Commencement Certificates / NA Order for plotted developmentDhansampada Commencement Cert.pdf · uploaded 15 Jun 2023Source
- 1 CERSAI detailsUndertaking CERSAI.pdf · uploaded 15 Jun 2023Source
- 1 Disclosure of Interest in Other Real Estate Organizations7a Annexure A Disclosure of Interest in Entities Anirudha Ranjekar.pdf · uploaded 15 Jun 2023Source
- 2 Disclosure of Interest in Other Real Estate Organizations7b Annexure A Disclosure of Interest in Entities Harish Patil.pdf · uploaded 15 Jun 2023Source
- 3 Disclosure of Interest in Other Real Estate Organizations7c Annexure A Disclosure of Interest in Entities Ravindra Ranjekar.pdf · uploaded 15 Jun 2023Source
- 4 Disclosure of Interest in Other Real Estate Organizations7d Annexure A Disclosure of Interest in Entities Rohan Patil.pdf · uploaded 15 Jun 2023Source
- 1 Proforma of Allotment letterAllotment letter as per order 31.pdf · uploaded 15 Jun 2023Source
- 1 Copy of the legal title reportDhansampada Search dtd 28062023 FINAL.pdf · uploaded 30 Jun 2023Source
- 1 Copy of Layout Approval (in case of layout)plan dhan upload.pdf · uploaded 30 Jun 2023Source
- 1 Declaration about Commencement CertificateFormat D-Commencement Plan.pdf · uploaded 30 Jun 2023Source
- 1 Declaration in FORM BRanjekar Realty LLP Form B.pdf · uploaded 30 Jun 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FINAL DHANSAMPADA FORM 3 Chartered Accountant Certificate 27062023.pdf · uploaded 30 Jun 2023Source
- 1 Deviation Report with respect to Allotment letterDeviation Letter-Allotment Letter-Dhanasampada.pdf · uploaded 30 Jun 2023Source
- 1 Proforma of Agreement for saleATS-Draft for RERA Upload-Dhanasampada.pdf · uploaded 3 Jul 2023Source
- 1 Deviation Report with respect to model copy of AgreementDEVIATION LETTER - DHANSMAPADA-AGREEMENT.pdf · uploaded 3 Jul 2023Source
- 2 Copy of Layout Approval (in case of layout)Dhansampada POA 1.pdf · uploaded 12 Jul 2023Source
- 3 Copy of Layout Approval (in case of layout)Dhansampada POA 2.pdf · uploaded 12 Jul 2023Source
- 4 Copy of Layout Approval (in case of layout)Dhansampada POA 3.pdf · uploaded 12 Jul 2023Source
- 2 Commencement Certificates / NA Order for plotted developmentDhansampada POA 1.pdf · uploaded 12 Jul 2023Source
- 3 Commencement Certificates / NA Order for plotted developmentDhansampada POA 2.pdf · uploaded 12 Jul 2023Source
- 4 Commencement Certificates / NA Order for plotted developmentDhansampada POA 3.pdf · uploaded 12 Jul 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDeclaration about seperate bank account as per order 34.pdf · uploaded 12 Jul 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FINAL DHANSAMPADA FORM 3 Chartered Accountant Certificate 20072023.pdf · uploaded 20 Jul 2023Source
- 5 Copy of Layout Approval (in case of layout)Sheet 1.pdf · uploaded 1 Nov 2023Source
- 3 Building Plan Approval / NA Order for plotted developmentSheet 2.pdf · uploaded 1 Nov 2023Source
- 4 Building Plan Approval / NA Order for plotted developmentSheet 3.pdf · uploaded 1 Nov 2023Source
- 5 Building Plan Approval / NA Order for plotted developmentSheet 4.pdf · uploaded 1 Nov 2023Source
- 6 Building Plan Approval / NA Order for plotted developmentSheet 5.pdf · uploaded 1 Nov 2023Source
- 7 Building Plan Approval / NA Order for plotted developmentSheet 6.pdf · uploaded 1 Nov 2023Source
- 8 Building Plan Approval / NA Order for plotted developmentSheet 7.pdf · uploaded 1 Nov 2023Source
- 9 Building Plan Approval / NA Order for plotted developmentSheet 8.pdf · uploaded 1 Nov 2023Source
- 5 Commencement Certificates / NA Order for plotted developmentFinal Commencement.pdf · uploaded 1 Nov 2023Source
- 2 Declaration about Commencement CertificateFormat D-Commencement and Plan.pdf · uploaded 1 Nov 2023Source
- 3 a Details of encumbrances concerned to FinanceDeclaration of no Encumbrance - Dhansampada.pdf · uploaded 26 Dec 2023Source
- 3 b Details of encumbrances concerned to LegalDeclaration of no Encumbrance - Dhansampada.pdf · uploaded 26 Dec 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)DHANASAMPADA FORM 3 30092023.pdf · uploaded 12 Jan 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Dhansampada engineer's certificate Q7.pdf · uploaded 12 Feb 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)DHANSAMPADA FORM 3 as on 31 DEC 23.pdf · uploaded 12 Feb 2024Source
- 2 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDeclaration about seperate bank account as per order 34 dhan.pdf · uploaded 13 Mar 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 Engineer Certificate.pdf · uploaded 20 May 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A-FY 2023-24.pdf · uploaded 20 May 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architects Certificate Dhansampada.pdf · uploaded 21 May 2024Source
- 6 Copy of Layout Approval (in case of layout)Dhansampada Plan 1 dtd.pdf · uploaded 24 May 2024Source
- 10 Building Plan Approval / NA Order for plotted developmentDhansampada Plan 2 dtd.PDF · uploaded 24 May 2024Source
- 11 Building Plan Approval / NA Order for plotted developmentDhansampada Plan 3 dtd.pdf · uploaded 24 May 2024Source
- 12 Building Plan Approval / NA Order for plotted developmentDhansampada Plan 4 dtd.pdf · uploaded 24 May 2024Source
- 13 Building Plan Approval / NA Order for plotted developmentDhansampada Plan 5 dtd.pdf · uploaded 24 May 2024Source
- 14 Building Plan Approval / NA Order for plotted developmentDhansampada Plan 6 dtd.pdf · uploaded 24 May 2024Source
- 15 Building Plan Approval / NA Order for plotted developmentDhansampada Plan 7 dtd.pdf · uploaded 24 May 2024Source
- 16 Building Plan Approval / NA Order for plotted developmentDhansampada Plan 8 dtd.pdf · uploaded 24 May 2024Source
- 6 Commencement Certificates / NA Order for plotted developmentDhansampada Commencement Certificate dtd 21052024.pdf · uploaded 24 May 2024Source
- 3 Declaration about Commencement CertificateFormat D-Commencement and Plan.pdf · uploaded 24 May 2024Source
- 1 Disclosure of sold/ booked inventoryInventory Declaration Sold Unsold.pdf · uploaded 28 May 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)DHANSAMPADA AS ON 11 MARCH 2024.pdf · uploaded 28 May 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Dhansampada.pdf · uploaded 28 Jan 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Dhansampada 30 09 24.pdf · uploaded 28 Jan 2025Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 DHANSAMPADA as on 31 DEC 24.pdf · uploaded 25 Feb 2025Source
- Form 1Form 1 Architect certificate.pdf · uploaded 26 May 2025Source
- Form 2Form 2 Engineer Certificate- Updated Q4.pdf · uploaded 26 May 2025Source
- Form 3Form 3 Chartered Accountant Certificate Q4.pdf · uploaded 26 May 2025Source
- Disclosure of Sold and Booked InventoryInventory Declaration Sold Unsold- Updated Dhansampada.pdf · uploaded 26 May 2025Source
- Form 2A (FY 2023-2024)Form 2A 2023-24.pdf · uploaded 4 Jun 2025Source
- Form 2A (FY 2024-2025)Form 2A 2024-25.pdf · uploaded 4 Jun 2025Source
- Form 1Dhansampada Form 1 Q2 FY 2025-26.pdf · uploaded 25 Dec 2025Source
- Form 2Form 2 Engineer Certificate 30092025 Dhansampada.pdf · uploaded 25 Dec 2025Source
- Form 3Form 3 Chartered Accountant Certificate 30092025 Dhansampada.pdf · uploaded 25 Dec 2025Source
- Disclosure of Sold and Booked InventoryInventory Declaration Sold Unsold1.pdf · uploaded 25 Dec 2025Source
- Form 1Form 1 Architect certificate_Q1 2025-26.pdf · uploaded 25 Dec 2025Source
- Form 2Form 2 Engineer Certificate 30062025 Q1.pdf · uploaded 25 Dec 2025Source
- Form 3Form 3 CA Certificate 30062025 Q1.pdf · uploaded 25 Dec 2025Source
- Disclosure of Sold and Booked InventoryQ1 Inventory Declaration Sold Unsold.pdf · uploaded 25 Dec 2025Source
- Withdrawal Update Form 1Form 1 Architect Certificate Q3.pdf · uploaded 29 Jan 2026Source
- Withdrawal Update Form 2Form 2 Engineer Certificate Q3_Dhansampada.pdf · uploaded 29 Jan 2026Source
- Withdrawal Update Form 3Form 3 Chartered Accountant Certificate Q3 FY 2025-26 Dhansampada.pdf · uploaded 29 Jan 2026Source
- Form 5 (FY 2024-2025)FORM 5 Dhanasampada 24-25.pdf · uploaded 23 Feb 2026Source
- Withdrawal Update Form 1Form 1 Architect Certificate Q4 FY 2025-26.pdf · uploaded 13 Jun 2026Source
- Withdrawal Update Form 2Form 2 Engineer Certificate- DHANASAMPADA Q4.pdf · uploaded 13 Jun 2026Source
- Withdrawal Update Form 3Q4 Dhansampada FORM 3 Chartered Accountant Certificate.pdf · uploaded 13 Jun 2026Source
- Withdrawal Update Form 1Form 1 Architect Certificate Q4 FY 2025-26.pdf · uploaded 17 Jun 2026Source
- Withdrawal Update Form 1Form 1 Architect Certificate Q4 FY 2025-26.pdf · uploaded 17 Jun 2026Source
- Withdrawal Update Form 2Form 2 Engineer Certificate- DHANASAMPADA Q4.pdf · uploaded 17 Jun 2026Source
- Withdrawal Update Form 2Form 2 Engineer Certificate- DHANASAMPADA Q4.pdf · uploaded 17 Jun 2026Source
- Withdrawal Update Form 3Q4 Dhansampada FORM 3 Chartered Accountant Certificate.pdf · uploaded 17 Jun 2026Source
- Withdrawal Update Form 3Q4 Dhansampada FORM 3 Chartered Accountant Certificate.pdf · uploaded 17 Jun 2026Source
Technical
- DocumentDhansampadaPlan 2_compressed.pdf · uploaded 14 Jun 2023Source
- DocumentDhansampadaPlan 3_compressed.pdf · uploaded 14 Jun 2023Source
- Documentplan dhan upload.pdf · uploaded 30 Jun 2023Source
- DocumentDhansampada POA 1.pdf · uploaded 12 Jul 2023Source
- DocumentDhansampada POA 2.pdf · uploaded 12 Jul 2023Source
- DocumentDhansampada POA 3.pdf · uploaded 12 Jul 2023Source
- DocumentSheet 1.pdf · uploaded 1 Nov 2023Source
- DocumentSheet 2.pdf · uploaded 1 Nov 2023Source
- DocumentSheet 3.pdf · uploaded 1 Nov 2023Source
- DocumentSheet 4.pdf · uploaded 1 Nov 2023Source
- DocumentSheet 5.pdf · uploaded 1 Nov 2023Source
- DocumentSheet 6.pdf · uploaded 1 Nov 2023Source
- DocumentSheet 7.pdf · uploaded 1 Nov 2023Source
- DocumentSheet 8.pdf · uploaded 1 Nov 2023Source
- DocumentDhansampada Plan 2 dtd.PDF · uploaded 24 May 2024Source
- DocumentDhansampada Plan 3 dtd.pdf · uploaded 24 May 2024Source
- DocumentDhansampada Plan 4 dtd.pdf · uploaded 24 May 2024Source
- DocumentDhansampada Plan 5 dtd.pdf · uploaded 24 May 2024Source
- DocumentDhansampada Plan 6 dtd.pdf · uploaded 24 May 2024Source
- DocumentDhansampada Plan 7 dtd.pdf · uploaded 24 May 2024Source
- DocumentDhansampada Plan 8 dtd.pdf · uploaded 24 May 2024Source
- DocumentDhansampada Plan 1 dtd.pdf · uploaded 24 May 2024Source
- Documentplan 1 of 8.pdf · uploaded 22 Jun 2026Source
- DocumentPlan 2 of 8.pdf · uploaded 22 Jun 2026Source
- DocumentPlan 3 of 8.pdf · uploaded 22 Jun 2026Source
- Documentplan 4 of 8.pdf · uploaded 22 Jun 2026Source
- Documentplan 5 of 8.pdf · uploaded 22 Jun 2026Source
- Documentplan 6 of 8.pdf · uploaded 22 Jun 2026Source
- Documentplan 7 of 8.pdf · uploaded 22 Jun 2026Source
- Documentplan 8 of 8.pdf · uploaded 22 Jun 2026Source
Technical (Architect)
- DocumentForm 1 Architect Certificate Q4 FY 2025-26.pdf · uploaded 17 Jun 2026Source
Technical (Engineer)
- DocumentForm 2 Engineer Certificate- DHANASAMPADA Q4.pdf · uploaded 17 Jun 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Erandwana, Haveli taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- By Canal Road
- South
- By 6 m road and Plot No 07 and 10
- East
- By CTS No 153
- West
- By open space
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Manguesh Bhandekar | — |
| Chartered accountant | Kishor R Joshi and Associates | — |
| Chartered accountant | Phule Wagh & Associates LLP | — |
| Chartered accountant | Tejas Sant | — |
| Engineer | Aniruddha Ranjekar | — |
Source: MahaRERA project page. Contact details are not shown.