Toran
It is due for completion in Dec 2026, with no extension on record; no MahaRERA orders on record; 25% of its units are booked.
Aundh, Pune 411007 · Promoter: Pandit Javdekar Associates
It is due for completion in Dec 2026, with no extension on record
- This projectRegistered 8 Jun 2023, completion promised 31 Dec 2026.
1 extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
The building
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100051254
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100051254 | 8 Jun 2023 | 31 Dec 2026 | 31 Dec 2026 | Pandit Javdekar Associates | Project page |
Documents166
2 documents held by Deedo, 164 filings listed on MahaRERA's project page
Finance
- PAN Card1 PAN Card.pdf · uploaded 20 Feb 2023Source
Legal
- Declaration Form BDECLARATION FORM B - PJA - RERA - TORAN_compressed.pdf · uploaded 20 Feb 2023Source
- Declaration Form BDECLARATION FORM B - CHAUBAL - RERA - TORAN_compressed.pdf · uploaded 20 Feb 2023Source
- Legal Title reportlegal title report d.pdf · uploaded 4 Mar 2023Source
- Other – LegalDECLARATION ABOUT COMMENCEMNT CERTI FICATE ( Form D ).pdf · uploaded 15 May 2023Source
- Other – LegalPART COMPLETION - TORAN.pdf · uploaded 15 Apr 2025Source
Show all 166 documentsShow fewer documents
Migrated
- 1 PAN Card1 PAN Card.pdf · uploaded 20 Feb 2023Source
- 1 Commencement Certificates / NA Order for plotted developmentTORAN 1ST SANCTION CC.pdf · uploaded 20 Feb 2023Source
- 1 Declaration in FORM BDECLARATION FORM B - PJA - RERA - TORAN_compressed.pdf · uploaded 20 Feb 2023Source
- 2 Declaration in FORM BDECLARATION FORM B - CHAUBAL - RERA - TORAN_compressed.pdf · uploaded 20 Feb 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsToran RAP DISC Int.PDF · uploaded 20 Feb 2023Source
- 2 Disclosure of Interest in Other Real Estate OrganizationsToran SAJ DISC Int.PDF · uploaded 20 Feb 2023Source
- 3 Disclosure of Interest in Other Real Estate OrganizationsAnnexure - A - Bharti Chaubal.pdf · uploaded 20 Feb 2023Source
- 4 Disclosure of Interest in Other Real Estate OrganizationsAnnexure A - Shamakant Chaubal.pdf · uploaded 20 Feb 2023Source
- 1 Proforma of Allotment letterALLOTMENT LETTER - RERA - TORAN_compressed.pdf · uploaded 20 Feb 2023Source
- 1 Deviation Report with respect to Allotment letterNO DEVIATION TO ALLOTMENT - TORAN.pdf · uploaded 20 Feb 2023Source
- 1 Deviation Report with respect to model copy of AgreementNO DEVIATION TO AGREEMENT - TORAN.pdf · uploaded 20 Feb 2023Source
- 1 a Details of encumbrances concerned to FinanceNO FINANCIAL ENCUMBRANCE - CHAUBAL - RERA - TORAN.pdf · uploaded 2 Mar 2023Source
- 2 a Details of encumbrances concerned to FinanceNO FINANCIAL ENCUMBRANCE - PJA - RERA - TORAN.pdf · uploaded 2 Mar 2023Source
- 3 a Details of encumbrances concerned to FinanceNO ENCUMBRANCE - CHAUBAL - RERA - TORAN.pdf · uploaded 2 Mar 2023Source
- 4 a Details of encumbrances concerned to FinanceNO ENCUMBRANCE - PJA - RERA - TORAN.pdf · uploaded 2 Mar 2023Source
- 1 b Details of encumbrances concerned to LegalNO FINANCIAL ENCUMBRANCE - CHAUBAL - RERA - TORAN.pdf · uploaded 2 Mar 2023Source
- 2 b Details of encumbrances concerned to LegalNO FINANCIAL ENCUMBRANCE - PJA - RERA - TORAN.pdf · uploaded 2 Mar 2023Source
- 3 b Details of encumbrances concerned to LegalNO ENCUMBRANCE - CHAUBAL - RERA - TORAN.pdf · uploaded 2 Mar 2023Source
- 4 b Details of encumbrances concerned to LegalNO ENCUMBRANCE - PJA - RERA - TORAN.pdf · uploaded 2 Mar 2023Source
- 1 Proforma of Agreement for saleAgreement to sale.pdf · uploaded 2 Mar 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFormat - A - Bharti Chaubal.pdf · uploaded 2 Mar 2023Source
- 2 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameBank ac Declaration.pdf · uploaded 2 Mar 2023Source
- 1 Copy of the legal title reportlegal title report d.pdf · uploaded 4 Mar 2023Source
- 1 Copy of Layout Approval (in case of layout)TORAN 1ST SANCTION PLAN 1-1_compressed (2).pdf · uploaded 4 Mar 2023Source
- 1 Building Plan Approval / NA Order for plotted developmentTORAN 1ST SANCTION PLAN 1-1_compressed (2).pdf · uploaded 4 Mar 2023Source
- 1 Declaration about Commencement CertificateFormat D Toran.PDF · uploaded 4 Mar 2023Source
- 1 CERSAI detailsCersai Report.pdf · uploaded 4 Mar 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Toran-FORM-3 CA Certificate.pdf · uploaded 4 Mar 2023Source
- 2 CERSAI detailsToran CERSAI crt.PDF · uploaded 21 Mar 2023Source
- 1 Other – LegalDECLARATION ABOUT COMMENCEMNT CERTI FICATE ( Form D ).pdf · uploaded 15 May 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Toran Form 1.PDF · uploaded 27 Jul 2023Source
- 1 Disclosure of sold/ booked inventoryTORAN SOLD INVENTORY.pdf · uploaded 27 Jul 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Toran 30092023.pdf · uploaded 12 Oct 2023Source
- 2 Disclosure of sold/ booked inventoryToran Sold Inventory.pdf · uploaded 12 Oct 2023Source
- 2 Building Plan Approval / NA Order for plotted developmentTORAN 2ND SANCTION PLAN 1 of 2.pdf · uploaded 19 Oct 2023Source
- 3 Building Plan Approval / NA Order for plotted developmentTORAN 2ND SANCTION PLAN 2 of 2.pdf · uploaded 19 Oct 2023Source
- 2 Commencement Certificates / NA Order for plotted developmentTORAN 2ND SANCTION CC.pdf · uploaded 19 Oct 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Toran Form 2 30092023.pdf · uploaded 19 Oct 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Toran Form 3 30092023.pdf · uploaded 19 Oct 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Toran Form 2.pdf · uploaded 20 Oct 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.PDF · uploaded 17 Jan 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.PDF · uploaded 17 Jan 2024Source
- 3 Disclosure of sold/ booked inventorySALES DISCLOSURE.PDF · uploaded 17 Jan 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3.pdf · uploaded 17 Jan 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 19 Apr 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 19 Apr 2024Source
- 4 Disclosure of sold/ booked inventorySales Disclosure.PDF · uploaded 19 Apr 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 19 Apr 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 19 Apr 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate_Toran (30-06-2024)_compressed.pdf · uploaded 17 Jul 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate_Toran (30-06-2024)_compressed.pdf · uploaded 17 Jul 2024Source
- 5 Disclosure of sold/ booked inventorySold Booked Inventory_Toran (30-06-2024)_compressed.pdf · uploaded 17 Jul 2024Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate_Toran (30-06-2024)_compressed.pdf · uploaded 17 Jul 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Toran Form 1.PDF · uploaded 21 Oct 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Toran Form 3.PDF · uploaded 21 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Toran Form 2.PDF · uploaded 21 Oct 2024Source
- 2 Disclosure of sold/ booked inventoryToran Sales Disclosure.PDF · uploaded 21 Oct 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Toran Form 2A.PDF · uploaded 21 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 Toran.PDF · uploaded 21 Oct 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_CA Certificate_Toran (30-06-2023)_compressed.pdf · uploaded 10 Jan 2025Source
- 1 Commencement Certificates / NA Order for plotted developmentPandit Javdekar Associates_Toran_4th Sanction CC.pdf · uploaded 10 Jan 2025Source
- 2 Commencement Certificates / NA Order for plotted developmentPandit Javdekar Associates_Toran_4th Sanction CC.pdf · uploaded 10 Jan 2025Source
- 1 Building Plan Approval / NA Order for plotted developmentPandit Javdekar Associates_Toran_4th Sanction Plan_1-2.pdf · uploaded 10 Jan 2025Source
- 4 Building Plan Approval / NA Order for plotted developmentPandit Javdekar Associates_Toran_4th Sanction Plan_2-2.pdf · uploaded 10 Jan 2025Source
- 3 Building Plan Approval / NA Order for plotted developmentPandit Javdekar Associates_Toran_4th Sanction Plan_1-2.pdf · uploaded 10 Jan 2025Source
- 2 Building Plan Approval / NA Order for plotted developmentPandit Javdekar Associates_Toran_4th Sanction Plan_2-2.pdf · uploaded 10 Jan 2025Source
- 3 Commencement Certificates / NA Order for plotted developmentTORAN 3RD SANCTION CC.pdf · uploaded 14 Jan 2025Source
- 6 Building Plan Approval / NA Order for plotted developmentTORAN 3RD SANCTION PLAN 2-2_compressed.pdf · uploaded 14 Jan 2025Source
- 5 Building Plan Approval / NA Order for plotted developmentTORAN 3RD SANCTION PLAN 1-2_compressed.pdf · uploaded 14 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Toran_Form 1_Architect Certificate (31-12-2024).PDF · uploaded 21 Jan 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Toran_Form 3_CA Certificate (31-12-2024)_compressed.pdf · uploaded 21 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Toran_Form 2_Engineer Certificate (31-12-2024).PDF · uploaded 21 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryToran_Sold Unsold Inventory (31-12-2024).PDF · uploaded 21 Jan 2025Source
- 1 Other – LegalPART COMPLETION - TORAN.pdf · uploaded 15 Apr 2025Source
- 1 Other – TechnicalPART COMPLETION - TORAN.pdf · uploaded 15 Apr 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Toran Form - 1 31-03-2025.PDF · uploaded 21 Apr 2025Source
- 1 Disclosure of sold/ booked inventoryToran Sales Disclosure 31-03-2025.PDF · uploaded 21 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Toran Form - 3.pdf · uploaded 2 May 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Toran Form 2.PDF · uploaded 2 May 2025Source
- 1 Commencement Certificates / NA Order for plotted developmentTORAN 4TH SANCTION CC.pdf · uploaded 10 May 2025Source
- 1 Building Plan Approval / NA Order for plotted developmentTORAN 4TH SANCTION PLAN 1-2.pdf · uploaded 10 May 2025Source
- 2 Building Plan Approval / NA Order for plotted developmentTORAN 4TH SANCTION PLAN 2-2.pdf · uploaded 10 May 2025Source
- Form 1Toran Form 1.PDF · uploaded 12 Aug 2025Source
- Form 1Form 1 Toran 30092023.pdf · uploaded 12 Aug 2025Source
- Form 1FORM 1.PDF · uploaded 12 Aug 2025Source
- Form 1Toran Form - 1 31-12-2024.PDF · uploaded 12 Aug 2025Source
- Form 1Toran Form 1 31-03-2024.PDF · uploaded 12 Aug 2025Source
- Form 1Toran Form 1 30-06-2024.PDF · uploaded 12 Aug 2025Source
- Form 1Toran Form 1 30-09-2024.PDF · uploaded 12 Aug 2025Source
- Form 1Toran Form - 1.PDF · uploaded 12 Aug 2025Source
- Form 2Toran Form 2.pdf · uploaded 12 Aug 2025Source
- Form 2Toran Form - 2.PDF · uploaded 12 Aug 2025Source
- Form 2FORM 2.PDF · uploaded 12 Aug 2025Source
- Form 2Form-2 Toran 31-12-2024.PDF · uploaded 12 Aug 2025Source
- Form 2Toran Form 2 31-03-2024.PDF · uploaded 12 Aug 2025Source
- Form 2Toran Form 2 30-06-2024.PDF · uploaded 12 Aug 2025Source
- Form 2Toran Form - 2 30-09-2024.PDF · uploaded 12 Aug 2025Source
- Form 2Toran Form 2.PDF · uploaded 12 Aug 2025Source
- Form 31 CA Certificate on Project Cost & Fund withdrawal (Form 3).pdf · uploaded 12 Aug 2025Source
- Form 3Toran Form 3 30092023.pdf · uploaded 12 Aug 2025Source
- Form 3FORM 3.pdf · uploaded 12 Aug 2025Source
- Form 3Form-3 Toran 31-12-2024.PDF · uploaded 12 Aug 2025Source
- Form 3Toran Form 3 31-03-2024_compressed.pdf · uploaded 12 Aug 2025Source
- Form 3Toran From 3 30-06-2024.PDF · uploaded 12 Aug 2025Source
- Form 3Toran Form 3.pdf · uploaded 12 Aug 2025Source
- Form 3Toran Form - 3.PDF · uploaded 12 Aug 2025Source
- Disclosure of Sold and Booked InventoryTORAN SOLD INVENTORY.pdf · uploaded 12 Aug 2025Source
- Disclosure of Sold and Booked InventoryToran Sold Inventory.pdf · uploaded 12 Aug 2025Source
- Disclosure of Sold and Booked InventorySALES DISCLOSURE.PDF · uploaded 12 Aug 2025Source
- Disclosure of Sold and Booked InventorySales Disclosure Toran 31-12-24.PDF · uploaded 12 Aug 2025Source
- Disclosure of Sold and Booked InventoryTORAN Sales Disclosure 31-03-2024.PDF · uploaded 12 Aug 2025Source
- Disclosure of Sold and Booked InventoryToran Sales Disclosure 30-06-2024.PDF · uploaded 12 Aug 2025Source
- Disclosure of Sold and Booked InventoryToran Sales Disclosure 30-09-2024.PDF · uploaded 12 Aug 2025Source
- Disclosure of Sold and Booked InventoryToran Sales Disclosure 31-03-2025.PDF · uploaded 12 Aug 2025Source
- Form 5 (FY 2024-2025)Toran Form 5.pdf · uploaded 30 Sep 2025Source
- Form 2A (FY 2024-2025)Toran 2A 31.3.2025.PDF · uploaded 6 Oct 2025Source
- Withdrawal Update Form 1Toran Form - 1 30-6-2025 (1).PDF · uploaded 16 Oct 2025Source
- Withdrawal Update Form 1Toran Form-1-30-9-25.PDF · uploaded 16 Oct 2025Source
- Withdrawal Update Form 2Toran Form 2.PDF · uploaded 16 Oct 2025Source
- Withdrawal Update Form 2Toran Form 2.PDF · uploaded 16 Oct 2025Source
- Withdrawal Update Form 3Toran Form - 3.PDF · uploaded 16 Oct 2025Source
- Withdrawal Update Form 3Toran Form - 3.PDF · uploaded 16 Oct 2025Source
- Form 2A (FY 2023-2024)Toran Form 2A 31-03-2024.PDF · uploaded 19 Nov 2025Source
- Form 5 (FY 2023-2024)Form 5 Toran 31-03-2024.PDF · uploaded 19 Nov 2025Source
- Form 2A (FY 2025-2026)Toran 2A 2025-26.PDF · uploaded 30 Jun 2026Source
- Withdrawal Update Form 1FORM 1.pdf · uploaded 10 Aug 2026Source
- Withdrawal Update Form 2Toran Form 2.PDF · uploaded 10 Aug 2026Source
- Withdrawal Update Form 3FORM 3.pdf · uploaded 10 Aug 2026Source
- Withdrawal Update Form 1FORM 1.pdf · uploaded 10 Sep 2026Source
- Withdrawal Update Form 1FORM 1.pdf · uploaded 10 Sep 2026Source
- Withdrawal Update Form 2Toran Form 2.PDF · uploaded 10 Sep 2026Source
- Withdrawal Update Form 2Toran Form 2.PDF · uploaded 10 Sep 2026Source
- Withdrawal Update Form 3FORM 3.pdf · uploaded 10 Sep 2026Source
- Withdrawal Update Form 3FORM 3.pdf · uploaded 10 Sep 2026Source
- Form 5 (FY 2025-2026)PJA_Toran_Form-5_ FY 2025-26.PDF · uploaded 30 Sep 2026Source
Technical
- DocumentTORAN 1ST SANCTION PLAN 1-1_compressed (2).pdf · uploaded 4 Mar 2023Source
- DocumentTORAN 1ST SANCTION PLAN 1-1_compressed (2).pdf · uploaded 4 Mar 2023Source
- DocumentTORAN 2ND SANCTION PLAN 1 of 2.pdf · uploaded 19 Oct 2023Source
- DocumentTORAN 2ND SANCTION PLAN 2 of 2.pdf · uploaded 19 Oct 2023Source
- DocumentPandit Javdekar Associates_Toran_4th Sanction Plan_1-2.pdf · uploaded 10 Jan 2025Source
- DocumentPandit Javdekar Associates_Toran_4th Sanction Plan_2-2.pdf · uploaded 10 Jan 2025Source
- DocumentPandit Javdekar Associates_Toran_4th Sanction Plan_1-2.pdf · uploaded 10 Jan 2025Source
- DocumentPandit Javdekar Associates_Toran_4th Sanction Plan_2-2.pdf · uploaded 10 Jan 2025Source
- DocumentTORAN 3RD SANCTION PLAN 1-2_compressed.pdf · uploaded 14 Jan 2025Source
- DocumentTORAN 3RD SANCTION PLAN 2-2_compressed.pdf · uploaded 14 Jan 2025Source
- Other – TechnicalPART COMPLETION - TORAN.pdf · uploaded 15 Apr 2025Source
- DocumentTORAN 4TH SANCTION PLAN 1-2.pdf · uploaded 10 May 2025Source
- DocumentTORAN 4TH SANCTION PLAN 2-2.pdf · uploaded 10 May 2025Source
- DocumentTORAN 4TH SANCTION PLAN 1-2.pdf · uploaded 11 Sep 2026Source
- DocumentTORAN 4TH SANCTION PLAN 2-2.pdf · uploaded 11 Sep 2026Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsCTS NO 1336, CTS NO 1336
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- 2BHK, 3BHK, 4BHK12 units in all
- Address
- Plot No 15, S No 132/2+3, Cts No 1336, Gulmohar Park, Aundh, Pune 411007, Gulmohar Park, AundhPIN 411007
- Village
- Aundh, Pune City taluka
- Location
- 18.55801, 73.80752
- Designated bank account
- 76
- Developed in phases
- No
Survey, CTS, gat or plot numbers
Boundaries
- North
- Cts No 1336 Part
- South
- Adjoining 9 Mtr Road
- East
- Cts No 1336 Part
- West
- Cts No 1336 Part
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking12 units
3 of 12 units booked (25%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 2BHK | 86.84 sq m · 935 sq ft | 1 | 0 |
| 3BHK | 122.58 sq m · 1,319 sq ft | 5 | 0 |
| 4BHK | 163.72 sq m · 1,762 sq ft | 6 | 3 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals4
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Architect Rohit Dasnurkar | — |
| Chartered accountant | Nitesh A Mukadam And Company | — |
| Engineer | Mr Uday Aradhye | — |
| Engineer | Niranjan Oak | — |
Source: MahaRERA project page. Contact details are not shown.