Westbrook
Certificate SignedAmbegaon Bk, Pune 411046 |Promoter: Tara Constructions
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Buildings
- 2
- Unit types
- 2BHK, 3BHK, Shop122 units in all
- Address
- 4-1, 4-2-1, 4-2-2, 4-2-3, New Pune Satara Highway, AmbegaonPIN 411046
- Designated bank account
- 21
- Developed in phases
- Yes
Location
Coordinates as published by MahaRERA
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion pushed back 3 years and 8 months
The latest completion date on record passed 2 years and 5 months ago.
- Registered
- 4 Aug 2017
- Promised
- 30 Sep 2020
- Revised
- 31 May 2024
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100003178 | 4 Aug 2017 | 30 Sep 2020 | 31 May 2024 | Tara Constructions | Project page |
2 buildings
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| A Building | 14 | 41 |
| B Building | 14 | 81 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
103 of 122 units booked (84%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| A Building | 2BHK | 46.64 sq m · 502 sq ft | 4 | 4 |
| A Building | 2BHK | 46.71 sq m · 503 sq ft | 3 | 3 |
| A Building | 2BHK | 46.78 sq m · 504 sq ft | 3 | 3 |
| A Building | 2BHK | 46.93 sq m · 505 sq ft | 4 | 4 |
| A Building | 2BHK | 46.98 sq m · 506 sq ft | 3 | 3 |
| A Building | 2BHK | 46.99 sq m · 506 sq ft | 3 | 3 |
| A Building | 2BHK | 47.55 sq m · 512 sq ft | 4 | 4 |
| A Building | 2BHK | 47.69 sq m · 513 sq ft | 3 | 3 |
Show all 29 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| A Building | 2BHK | 66.16 sq m · 712 sq ft | 1 | 1 |
| A Building | 2BHK | 66.17 sq m · 712 sq ft | 6 | 6 |
| A Building | 2BHK | 66.23 sq m · 713 sq ft | 7 | 7 |
| B Building | 2BHK | 59.55 sq m · 641 sq ft | 6 | 3 |
| B Building | 2BHK | 60.85 sq m · 655 sq ft | 7 | 6 |
| B Building | 2BHK | 61.04 sq m · 657 sq ft | 5 | 5 |
| B Building | 2BHK | 62.24 sq m · 670 sq ft | 6 | 6 |
| B Building | 2BHK | 71.16 sq m · 766 sq ft | 14 | 14 |
| B Building | 2BHK | 74.14 sq m · 798 sq ft | 12 | 12 |
| B Building | 2BHK | 80.17 sq m · 863 sq ft | 6 | 3 |
| B Building | 2BHK | 81.29 sq m · 875 sq ft | 6 | 2 |
| B Building | 2BHK | 82.5 sq m · 888 sq ft | 5 | 4 |
| B Building | 2BHK | 82.96 sq m · 893 sq ft | 5 | 4 |
| B Building | 2BHK | 101.54 sq m · 1,093 sq ft | 1 | 1 |
| B Building | 3BHK | 101.08 sq m · 1,088 sq ft | 1 | 0 |
| B Building | 3BHK | 102.47 sq m · 1,103 sq ft | 1 | 1 |
| B Building | 3BHK | 105.07 sq m · 1,131 sq ft | 1 | 1 |
| B Building | Shop | 74 sq m · 797 sq ft | 1 | 0 |
| B Building | Shop | 354 sq m · 3,810 sq ft | 2 | 0 |
| B Building | Shop | 459 sq m · 4,941 sq ft | 1 | 0 |
| B Building | Shop | 472 sq m · 5,081 sq ft | 1 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
2 documents held by Deedo, 234 filings listed on MahaRERA's project page
Finance
- PAN CardTARA CONSTRUCTIONS PAN CARD.pdf · uploaded 26 Jul 2017Source
- PAN CardNSR (IND) - PAN CARD.pdf · uploaded 26 Jul 2017Source
- PAN CardRSR (IND) - PAN CARD.pdf · uploaded 26 Jul 2017Source
- PAN CardDP THAKUR PAN CARD.pdf · uploaded 26 Jul 2017Source
- PAN CardPAN CARD OF BIBVE, DODKE And BIDKAR INFRA.pdf · uploaded 26 Jul 2017Source
- Other – FinanceConsent Latter-Format-C.pdf · uploaded 16 Sep 2022Source
Show all 236 documentsShow fewer documents
Legal
- OtherAUTHORITY LETTER.pdf · uploaded 26 Jul 2017Source
- OtherCONVYANCE DEED DRAFT.PDF · uploaded 26 Jul 2017Source
- Legal Title reportSearch And Title 4 1.pdf · uploaded 26 Jul 2017Source
- Legal Title reportSearch And Title 4 2 2.pdf · uploaded 26 Jul 2017Source
- Legal Title reportSearch And Title 4 2 3.pdf · uploaded 26 Jul 2017Source
- Legal Title reportSearch And Title P M Khire.pdf · uploaded 26 Jul 2017Source
- Legal Title reportSearch And Title Surana.pdf · uploaded 26 Jul 2017Source
- Declaration Form BFORM 'B' -RERA REGISTRATION AMBEGAON.pdf · uploaded 26 Jul 2017Source
- OtherREGISTRATION FORM A FOR AMBEGAON.pdf · uploaded 30 Jul 2017Source
- OtherRegistration Certificate Of Firm.pdf · uploaded 30 Jul 2017Source
- Declaration Form BHAMITPATRA AND DECLARATION OF AMBEGAON.pdf · uploaded 30 Jul 2017Source
- Declaration Form BForm B Ambegaon.pdf · uploaded 15 Feb 2018Source
- OtherDECLARATION.pdf · uploaded 23 Jun 2018Source
- OtherDECLARATION.pdf · uploaded 23 Jun 2018Source
- Legal Title reportESCROW ACCOUNT LETTER.pdf · uploaded 19 Nov 2018Source
- Legal Title reportINDEX II OF MORTGAGE DEED.pdf · uploaded 19 Nov 2018Source
- Legal Title reportLETTER OF DETAILS ENCUMBRANCE.pdf · uploaded 19 Nov 2018Source
- OtherAGREEMENT DRAFT.pdf · uploaded 30 Nov 2018Source
- OtherCONSENT LETTER 1.pdf · uploaded 28 Jun 2019Source
- OtherCONSENT LETTER 2.pdf · uploaded 28 Jun 2019Source
- OtherCONSENT LETTER 3.pdf · uploaded 28 Jun 2019Source
- OtherCONSENT LETTER 4.pdf · uploaded 28 Jun 2019Source
- OtherCONSENT LETTER 5.pdf · uploaded 28 Jun 2019Source
- OtherCONSENT LETTER 6.pdf · uploaded 28 Jun 2019Source
- OtherCONSENT LETTER 7.pdf · uploaded 28 Jun 2019Source
- OtherCONSENT LETTER 8.pdf · uploaded 28 Jun 2019Source
- OtherCONSENT LETTER 9.pdf · uploaded 28 Jun 2019Source
- OtherCONSENT LETTER 10.pdf · uploaded 28 Jun 2019Source
- Othercomplition.pdf · uploaded 2 Nov 2021Source
- OtherFINAL CONCENT.pdf · uploaded 25 Jun 2022Source
- OtherSOLD UNSOLD.pdf · uploaded 25 Jun 2022Source
- OtherFINAL CONCENT.pdf · uploaded 29 Jun 2022Source
- OtherConsent Latter-Format-C.pdf · uploaded 16 Sep 2022Source
- Declaration Form BForm B Affidavit 12072023.pdf · uploaded 12 Jul 2023Source
Migrated
- 1 PAN CardTARA CONSTRUCTIONS PAN CARD.pdf · uploaded 26 Jul 2017Source
- 2 PAN CardNSR (IND) - PAN CARD.pdf · uploaded 26 Jul 2017Source
- 3 PAN CardRSR (IND) - PAN CARD.pdf · uploaded 26 Jul 2017Source
- 4 PAN CardDP THAKUR PAN CARD.pdf · uploaded 26 Jul 2017Source
- 5 PAN CardPAN CARD OF BIBVE, DODKE And BIDKAR INFRA.pdf · uploaded 26 Jul 2017Source
- 1 Copy of the legal title reportSearch And Title 4 1.pdf · uploaded 26 Jul 2017Source
- 2 Copy of the legal title reportSearch And Title 4 2 2.pdf · uploaded 26 Jul 2017Source
- 3 Copy of the legal title reportSearch And Title 4 2 3.pdf · uploaded 26 Jul 2017Source
- 4 Copy of the legal title reportSearch And Title P M Khire.pdf · uploaded 26 Jul 2017Source
- 5 Copy of the legal title reportSearch And Title Surana.pdf · uploaded 26 Jul 2017Source
- 1 Copy of Layout Approval (in case of layout)Ambegaon Layout Plan.pdf · uploaded 26 Jul 2017Source
- 1 Building Plan Approval (IOD)Ambegaon Plan 2 To 9.pdf · uploaded 26 Jul 2017Source
- 1 Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT CERFIFICATE.pdf · uploaded 26 Jul 2017Source
- 1 Declaration in FORM BFORM 'B' -RERA REGISTRATION AMBEGAON.pdf · uploaded 26 Jul 2017Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCHITECT CERTIFICATE.pdf · uploaded 26 Jul 2017Source
- 1 Proforma of Allotment letterAllotment And Sale Agreement Draft.pdf · uploaded 26 Jul 2017Source
- 1 OtherAUTHORITY LETTER.pdf · uploaded 26 Jul 2017Source
- 2 OtherCONVYANCE DEED DRAFT.PDF · uploaded 26 Jul 2017Source
- 1 Details of encumbrancesDENA MORTGAGE DEED.pdf · uploaded 30 Jul 2017Source
- 2 Declaration in FORM BHAMITPATRA AND DECLARATION OF AMBEGAON.pdf · uploaded 30 Jul 2017Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FINAL ENGINEERS CERTIFICATE OF AMBEGAON.pdf · uploaded 30 Jul 2017Source
- 1 Certificates of CA (Form 3)AMBEGAON CA CERTIFICATE.pdf · uploaded 30 Jul 2017Source
- 3 OtherREGISTRATION FORM A FOR AMBEGAON.pdf · uploaded 30 Jul 2017Source
- 4 OtherRegistration Certificate Of Firm.pdf · uploaded 30 Jul 2017Source
- 2 Building Plan Approval (IOD)PROPOSED COM GR FL AMBEGAON A WING And BWING PLANS.pdf · uploaded 15 Feb 2018Source
- 3 Building Plan Approval (IOD)PROPOSED COM FIRST FL AMBEGAON A WING and BWING PLANS.pdf · uploaded 15 Feb 2018Source
- 4 Building Plan Approval (IOD)PROPOSED AMBEGAON A WING And BWING 3rd to 15th fl PLANS.pdf · uploaded 15 Feb 2018Source
- 5 Building Plan Approval (IOD)PROPOSED AMBEGAON A WING And BWING 4th fl to 12th fl PLANS.pdf · uploaded 15 Feb 2018Source
- 3 Declaration in FORM BForm B Ambegaon.pdf · uploaded 15 Feb 2018Source
- 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCHITECT CERTIFICATE AMBEGAON Upto December 2017.pdf · uploaded 15 Feb 2018Source
- 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENGINEER CERTIFICATE AMBEGAON Upto June 2017.pdf · uploaded 15 Feb 2018Source
- 2 Certificates of CA (Form 3)Scan CA Certificate AG Upto June 2017 Revised.pdf · uploaded 15 Feb 2018Source
- 3 Certificates of CA (Form 3)Scan CA Certificate AG upto December.pdf · uploaded 15 Feb 2018Source
- 2 Copy of Layout Approval (in case of layout)1-2.pdf · uploaded 23 Jun 2018Source
- 3 Copy of Layout Approval (in case of layout)1-2.pdf · uploaded 23 Jun 2018Source
- 6 Building Plan Approval (IOD)1-3.pdf · uploaded 23 Jun 2018Source
- 7 Building Plan Approval (IOD)1-4.pdf · uploaded 23 Jun 2018Source
- 8 Building Plan Approval (IOD)1-5.pdf · uploaded 23 Jun 2018Source
- 9 Building Plan Approval (IOD)1-6.pdf · uploaded 23 Jun 2018Source
- 10 Building Plan Approval (IOD)1-7.pdf · uploaded 23 Jun 2018Source
- 11 Building Plan Approval (IOD)1-8.pdf · uploaded 23 Jun 2018Source
- 12 Building Plan Approval (IOD)1-9.pdf · uploaded 23 Jun 2018Source
- 13 Building Plan Approval (IOD)1-3.pdf · uploaded 23 Jun 2018Source
- 14 Building Plan Approval (IOD)1-4.pdf · uploaded 23 Jun 2018Source
- 2 Commencement Certificates / NA Order for plotted development1-1.pdf · uploaded 23 Jun 2018Source
- 3 Commencement Certificates / NA Order for plotted development1-1.pdf · uploaded 23 Jun 2018Source
- 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCHITECT CERTIFICATE.pdf · uploaded 23 Jun 2018Source
- 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENGINEERS CERTIFICATE.pdf · uploaded 23 Jun 2018Source
- 5 OtherDECLARATION.pdf · uploaded 23 Jun 2018Source
- 6 OtherDECLARATION.pdf · uploaded 23 Jun 2018Source
- 6 Copy of the legal title reportESCROW ACCOUNT LETTER.pdf · uploaded 19 Nov 2018Source
- 7 Copy of the legal title reportINDEX II OF MORTGAGE DEED.pdf · uploaded 19 Nov 2018Source
- 8 Copy of the legal title reportLETTER OF DETAILS ENCUMBRANCE.pdf · uploaded 19 Nov 2018Source
- 7 OtherAGREEMENT DRAFT.pdf · uploaded 30 Nov 2018Source
- 1 Certificates of CA (Form 5)FORM NO 5 FOR RERA WESTBROOK AMBEGAON.pdf · uploaded 15 Jan 2019Source
- 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCT WHALEKAR CERTIFICATE AMBEGAON.pdf · uploaded 24 Jan 2019Source
- 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENG CERTIFICATE OF AMBEGAON.pdf · uploaded 24 Jan 2019Source
- 4 Copy of Layout Approval (in case of layout)TOTAL LAY OUT PLAN 12.pdf · uploaded 28 Jun 2019Source
- 15 Building Plan Approval (IOD)AMENITY BUILD AREA CALCULATION PLAN 10.pdf · uploaded 28 Jun 2019Source
- 16 Building Plan Approval (IOD)AMENITY BUILD PLAN 9.pdf · uploaded 28 Jun 2019Source
- 17 Building Plan Approval (IOD)AREA CALCULATION FLOOR PLAN 3.pdf · uploaded 28 Jun 2019Source
- 18 Building Plan Approval (IOD)BASEMENTGROUND PARKING LAYOUT PLAN 1.pdf · uploaded 28 Jun 2019Source
- 19 Building Plan Approval (IOD)ELEVATION PLAN 8.pdf · uploaded 28 Jun 2019Source
- 20 Building Plan Approval (IOD)ELEVATION PLAN 11.pdf · uploaded 28 Jun 2019Source
- 21 Building Plan Approval (IOD)FLOOR NO 8 A B BUILD 5.pdf · uploaded 28 Jun 2019Source
- 22 Building Plan Approval (IOD)FLOOR NO 13 14 A B BUILD 6.pdf · uploaded 28 Jun 2019Source
- 23 Building Plan Approval (IOD)FLOOR PLAN.pdf · uploaded 28 Jun 2019Source
- 24 Building Plan Approval (IOD)FLOOR PLAN7.pdf · uploaded 28 Jun 2019Source
- 25 Building Plan Approval (IOD)GROUND MEZANINE FLOOR PLAN 2.pdf · uploaded 28 Jun 2019Source
- 26 Building Plan Approval (IOD)TOTAL LAY OUT PLAN 12.pdf · uploaded 28 Jun 2019Source
- 27 Building Plan Approval (IOD)AREA CALCULATION FLOOR PLAN 3.pdf · uploaded 28 Jun 2019Source
- 28 Building Plan Approval (IOD)BASEMENTGROUND PARKING LAYOUT PLAN 1.pdf · uploaded 28 Jun 2019Source
- 29 Building Plan Approval (IOD)FLOOR NO 13 14 A B BUILD 6.pdf · uploaded 28 Jun 2019Source
- 30 Building Plan Approval (IOD)FLOOR PLAN7.pdf · uploaded 28 Jun 2019Source
- 31 Building Plan Approval (IOD)GROUND MEZANINE FLOOR PLAN 2.pdf · uploaded 28 Jun 2019Source
- 4 Commencement Certificates / NA Order for plotted developmentNEW COMMENCEMENT CERTIFICATE.pdf · uploaded 28 Jun 2019Source
- 8 OtherCONSENT LETTER 1.pdf · uploaded 28 Jun 2019Source
- 9 OtherCONSENT LETTER 2.pdf · uploaded 28 Jun 2019Source
- 10 OtherCONSENT LETTER 3.pdf · uploaded 28 Jun 2019Source
- 11 OtherCONSENT LETTER 4.pdf · uploaded 28 Jun 2019Source
- 12 OtherCONSENT LETTER 5.pdf · uploaded 28 Jun 2019Source
- 13 OtherCONSENT LETTER 6.pdf · uploaded 28 Jun 2019Source
- 14 OtherCONSENT LETTER 7.pdf · uploaded 28 Jun 2019Source
- 15 OtherCONSENT LETTER 8.pdf · uploaded 28 Jun 2019Source
- 16 OtherCONSENT LETTER 9.pdf · uploaded 28 Jun 2019Source
- 17 OtherCONSENT LETTER 10.pdf · uploaded 28 Jun 2019Source
- 5 Copy of Layout Approval (in case of layout)TOTAL LAY OUT PLAN 12.pdf · uploaded 13 Jul 2019Source
- 32 Building Plan Approval (IOD)AMENITY BUILD AREA CALCULATION PLAN 10.pdf · uploaded 13 Jul 2019Source
- 33 Building Plan Approval (IOD)AMENITY BUILD PLAN 9.pdf · uploaded 13 Jul 2019Source
- 34 Building Plan Approval (IOD)AREA CALCULATION FLOOR PLAN 3.pdf · uploaded 13 Jul 2019Source
- 35 Building Plan Approval (IOD)BASEMENTGROUND PARKING LAYOUT PLAN 1.pdf · uploaded 13 Jul 2019Source
- 36 Building Plan Approval (IOD)ELEVATION PLAN 8.pdf · uploaded 13 Jul 2019Source
- 37 Building Plan Approval (IOD)ELEVATION PLAN 11.pdf · uploaded 13 Jul 2019Source
- 38 Building Plan Approval (IOD)FLOOR NO 8 A B BUILD 5.pdf · uploaded 13 Jul 2019Source
- 39 Building Plan Approval (IOD)FLOOR NO 8 A B BUILD 5.pdf · uploaded 13 Jul 2019Source
- 40 Building Plan Approval (IOD)FLOOR NO 13 14 A B BUILD 6.pdf · uploaded 13 Jul 2019Source
- 41 Building Plan Approval (IOD)FLOOR PLAN.pdf · uploaded 13 Jul 2019Source
- 42 Building Plan Approval (IOD)FLOOR PLAN7.pdf · uploaded 13 Jul 2019Source
- 43 Building Plan Approval (IOD)GROUND MEZANINE FLOOR PLAN 2.pdf · uploaded 13 Jul 2019Source
- 5 Commencement Certificates / NA Order for plotted developmentNEW COMMENCEMENT CERTIFICATE.pdf · uploaded 13 Jul 2019Source
- 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCHITECTS CERTIFICATE OF AMBEGAON SITE.pdf · uploaded 29 Jul 2019Source
- 5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)AMBEGAON WESTBROOK ENGINEERS CERTIFICATE.pdf · uploaded 29 Jul 2019Source
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentcomplition.pdf · uploaded 2 Nov 2021Source
- 18 Othercomplition.pdf · uploaded 2 Nov 2021Source
- 1 CERSAI detailsCERSAI_Search Result For All Assets1572599938551.pdf · uploaded 10 Jan 2022Source
- 2 Details of encumbrancesDEED OF RE-COVEYANCE OF DENA BANK KOTHRUD BRANCH FOR AMBEGAOUN PROPERTY DT 11-9-2018.pdf · uploaded 25 Jun 2022Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)ENG CERTIFICATE.pdf · uploaded 25 Jun 2022Source
- 2 Certificates of CA (Form 5)FORM 5.pdf · uploaded 25 Jun 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)FORM 5.pdf · uploaded 25 Jun 2022Source
- 19 OtherFINAL CONCENT.pdf · uploaded 25 Jun 2022Source
- 20 OtherSOLD UNSOLD.pdf · uploaded 25 Jun 2022Source
- 1 Declaration about Commencement CertificateForm D.pdf · uploaded 29 Jun 2022Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)ENG CERTIFICATE.pdf · uploaded 29 Jun 2022Source
- 1 Disclosure of sold/ booked inventorySOLD UNSOLD.pdf · uploaded 29 Jun 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)FORM 5.pdf · uploaded 29 Jun 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)FORM 5.pdf · uploaded 29 Jun 2022Source
- 21 OtherFINAL CONCENT.pdf · uploaded 29 Jun 2022Source
- 1 Other – TechnicalAmbegaon - extension letter.pdf · uploaded 29 Jun 2022Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)ENG CERTIFICATE.pdf · uploaded 16 Sep 2022Source
- 2 Disclosure of sold/ booked inventorySOLD UNSOLD INVENTORIES.pdf · uploaded 16 Sep 2022Source
- 3 Certificates of CA (Form 5)FORM 5.pdf · uploaded 16 Sep 2022Source
- 22 OtherConsent Latter-Format-C.pdf · uploaded 16 Sep 2022Source
- 1 Other – FinanceConsent Latter-Format-C.pdf · uploaded 16 Sep 2022Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)GetUserDocumentFileContent (1).pdf · uploaded 18 Apr 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)GetUserDocumentFileContent.pdf · uploaded 18 Apr 2023Source
- 1 Status of Formation of Legal Entity (Society/Co Op etc.)WESTBROOK.pdf · uploaded 18 Apr 2023Source
- 2 Status of Formation of Legal Entity (Society/Co Op etc.)WESTBROOK.pdf · uploaded 18 Apr 2023Source
- 1 Proforma of Agreement for saleAGREEMENT DRAFT - AG.pdf · uploaded 19 Apr 2023Source
- 1 Deviation Report with respect to Allotment letterAGREEMENT DRAFT - AG.pdf · uploaded 19 Apr 2023Source
- 3 Disclosure of sold/ booked inventorySold - Booked - Commercial.pdf · uploaded 7 Jun 2023Source
- 4 Disclosure of sold/ booked inventorySold-Booked Inventory - A Bldg.pdf · uploaded 7 Jun 2023Source
- 5 Disclosure of sold/ booked inventorySold-Booked Inventory - B Bldg.pdf · uploaded 7 Jun 2023Source
- 3 a Details of encumbrances concerned to FinanceLegal encumbrance declaration.pdf · uploaded 30 Jun 2023Source
- 1 b Details of encumbrances concerned to LegalLegal encumbrance declaration.pdf · uploaded 30 Jun 2023Source
- 1 Disclosure of Interest in Other Real Estate Organizationsdisclosure of interest in other real estate.pdf · uploaded 30 Jun 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the samedeclaration about separate bank account.pdf · uploaded 30 Jun 2023Source
- 1 Foreclosure of the Projectdeclaration about separate bank account.pdf · uploaded 30 Jun 2023Source
- 1 Deviation Report with respect to model copy of Agreementdeviation in agreement for sale.pdf · uploaded 30 Jun 2023Source
- 4 Declaration in FORM BForm B Affidavit 12072023.pdf · uploaded 12 Jul 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A 2023.pdf · uploaded 12 Jul 2023Source
- 6 Disclosure of sold/ booked inventorySold Booked statement - A bldg.pdf · uploaded 12 Jul 2023Source
- 7 Disclosure of sold/ booked inventorysold Booked statement - B bldg.pdf · uploaded 12 Jul 2023Source
- 2 Architect’s Certificate on Completion of Project (Form 4)Westbrook - Form 4.pdf · uploaded 31 Jan 2024Source
Technical
- DocumentAmbegaon Plan 2 To 9.pdf · uploaded 26 Jul 2017Source
- DocumentAmbegaon Layout Plan.pdf · uploaded 26 Jul 2017Source
- DocumentPROPOSED COM GR FL AMBEGAON A WING And BWING PLANS.pdf · uploaded 15 Feb 2018Source
- DocumentPROPOSED COM FIRST FL AMBEGAON A WING and BWING PLANS.pdf · uploaded 15 Feb 2018Source
- DocumentPROPOSED AMBEGAON A WING And BWING 3rd to 15th fl PLANS.pdf · uploaded 15 Feb 2018Source
- DocumentPROPOSED AMBEGAON A WING And BWING 4th fl to 12th fl PLANS.pdf · uploaded 15 Feb 2018Source
- Document1-2.pdf · uploaded 23 Jun 2018Source
- Document1-3.pdf · uploaded 23 Jun 2018Source
- Document1-4.pdf · uploaded 23 Jun 2018Source
- Document1-5.pdf · uploaded 23 Jun 2018Source
- Document1-6.pdf · uploaded 23 Jun 2018Source
- Document1-7.pdf · uploaded 23 Jun 2018Source
- Document1-8.pdf · uploaded 23 Jun 2018Source
- Document1-9.pdf · uploaded 23 Jun 2018Source
- Document1-2.pdf · uploaded 23 Jun 2018Source
- Document1-3.pdf · uploaded 23 Jun 2018Source
- Document1-4.pdf · uploaded 23 Jun 2018Source
- DocumentTOTAL LAY OUT PLAN 12.pdf · uploaded 28 Jun 2019Source
- DocumentAMENITY BUILD AREA CALCULATION PLAN 10.pdf · uploaded 28 Jun 2019Source
- DocumentAMENITY BUILD PLAN 9.pdf · uploaded 28 Jun 2019Source
- DocumentAREA CALCULATION FLOOR PLAN 3.pdf · uploaded 28 Jun 2019Source
- DocumentBASEMENTGROUND PARKING LAYOUT PLAN 1.pdf · uploaded 28 Jun 2019Source
- DocumentELEVATION PLAN 8.pdf · uploaded 28 Jun 2019Source
- DocumentELEVATION PLAN 11.pdf · uploaded 28 Jun 2019Source
- DocumentFLOOR NO 8 A B BUILD 5.pdf · uploaded 28 Jun 2019Source
- DocumentFLOOR NO 13 14 A B BUILD 6.pdf · uploaded 28 Jun 2019Source
- DocumentFLOOR PLAN.pdf · uploaded 28 Jun 2019Source
- DocumentFLOOR PLAN7.pdf · uploaded 28 Jun 2019Source
- DocumentGROUND MEZANINE FLOOR PLAN 2.pdf · uploaded 28 Jun 2019Source
- DocumentTOTAL LAY OUT PLAN 12.pdf · uploaded 28 Jun 2019Source
- DocumentAREA CALCULATION FLOOR PLAN 3.pdf · uploaded 28 Jun 2019Source
- DocumentBASEMENTGROUND PARKING LAYOUT PLAN 1.pdf · uploaded 28 Jun 2019Source
- DocumentFLOOR NO 13 14 A B BUILD 6.pdf · uploaded 28 Jun 2019Source
- DocumentFLOOR PLAN7.pdf · uploaded 28 Jun 2019Source
- DocumentGROUND MEZANINE FLOOR PLAN 2.pdf · uploaded 28 Jun 2019Source
- DocumentTOTAL LAY OUT PLAN 12.pdf · uploaded 13 Jul 2019Source
- DocumentAMENITY BUILD AREA CALCULATION PLAN 10.pdf · uploaded 13 Jul 2019Source
- DocumentAMENITY BUILD PLAN 9.pdf · uploaded 13 Jul 2019Source
- DocumentAREA CALCULATION FLOOR PLAN 3.pdf · uploaded 13 Jul 2019Source
- DocumentBASEMENTGROUND PARKING LAYOUT PLAN 1.pdf · uploaded 13 Jul 2019Source
- DocumentELEVATION PLAN 8.pdf · uploaded 13 Jul 2019Source
- DocumentELEVATION PLAN 11.pdf · uploaded 13 Jul 2019Source
- DocumentFLOOR NO 8 A B BUILD 5.pdf · uploaded 13 Jul 2019Source
- DocumentFLOOR NO 8 A B BUILD 5.pdf · uploaded 13 Jul 2019Source
- DocumentFLOOR NO 13 14 A B BUILD 6.pdf · uploaded 13 Jul 2019Source
- DocumentFLOOR PLAN.pdf · uploaded 13 Jul 2019Source
- DocumentFLOOR PLAN7.pdf · uploaded 13 Jul 2019Source
- DocumentGROUND MEZANINE FLOOR PLAN 2.pdf · uploaded 13 Jul 2019Source
- Other – TechnicalAmbegaon - extension letter.pdf · uploaded 29 Jun 2022Source
Technical (Architect)
- DocumentARCHITECTS CERTIFICATE OF AMBEGAON SITE.pdf · uploaded 29 Jul 2019Source
Technical (Engineer)
- DocumentAMBEGAON WESTBROOK ENGINEERS CERTIFICATE.pdf · uploaded 29 Jul 2019Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In AMBEGAON Bk, Haveli taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- National Highway 4
- South
- S No 59
- East
- S No 4 Hissa No 10
- West
- Division Pune Of Ambegaon
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Walhekar & Associates | — |
| Engineer | Delcon Structural Consultant | — |
| Engineer | Nehal Thakur | — |
| Other | Integrated Consultant | — |
| Other | Samit Shridhar Inamdar | — |
| Other | Suda Infrastructures Pvt Ltd | — |
Source: MahaRERA project page. Contact details are not shown.