Optima Aspire

Certificate Signed

Ambegaon Bk, Pune 411046 |Promoter: Optima Highrise

23 Oct 2024Registered with MahaRERA
31 Dec 2027Promised completion
30 Apr 2028Revised completionPushed back 4 months
2Buildings
94Units registered2 booked (2%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Buildings
2
Unit types
201 Landowner Unit, 205 Landowner Unit, 2BHK, 301 Landowner Unit, 305 Landowner Unit, 306 Landowner Unit, 405 Landowner Unit, 406 Landowner Unit, F 13 Landowner Unit, F 14 Landowner Unit, F 15 Landowner Unit, F 6 Landowner Unit, F 7 Landowner Unit, F 8 Landowner Unit, G 10 Landowner Unit, G 13 Landowner Unit, G 14 Landowner Unit, G 15 Landowner Unit, G 6 Landowner Unit, G 7 Landowner Unit, G 8 Landowner Unit, Office space, Shop, 1BHK, 202 Landowner Unit, 203 Landowner Unit, 206 Landowner Unit, 207 Landowner Unit, 208 Landowner Unit, 209 Landowner Unit, 304 Landowner Unit, F 17 Landowner Unit, F 18 Landowner Unit, F 20 Landowner Unit, F 24 Landowner Unit, F 25 Landowner Unit, G 18 Landowner Unit, G 20 Landowner Unit, G 25 Landowner Unit, G 26 Landowner Unit94 units in all
Address
Survey No 28, Hissa No 1/2, 1/6, 1/9, 2, 1/7, 1/8PIN 411046
Designated bank account
76
Developed in phases
Yes

Registered transactions

110 registered documents matched to this project. Consideration is the value declared in the document; the Index II opens inside Deedo.

All 110 records
Registered transactions in this project
RegisteredUnitTypeConsideration₹ / sq.ftDocument
15 Oct 2026
Bldg मधील · Unit 1204
Primary sale≈ ₹44 L≈ ₹10,498
15 Oct 2026
Bldg मधील · Unit 803
Primary sale≈ ₹45 L≈ ₹6,996
15 Oct 2026
Bldg मधील · Unit 106
Primary sale≈ ₹44 L≈ ₹7,531
15 Oct 2026
Bldg मधील · Unit 1301
Primary sale≈ ₹45 L≈ ₹7,186
15 Oct 2026
Bldg मधील · Unit 1206
Primary sale≈ ₹44 L≈ ₹7,187
23 Sep 2026
Bldg मधील · Unit 1304
Other≈ ₹30 L—
16 Sep 2026
Bldg मधील · Unit 403
Primary sale≈ ₹44 L≈ ₹6,840
7 Sep 2026
Bldg मधील · Unit 1007
Mortgage≈ ₹38 L—
1 Sep 2026
Bldg मधील · Unit 1207
Primary sale≈ ₹44 L≈ ₹7,343
31 Aug 2026
Bldg मधील · Unit 206
Primary sale≈ ₹45 L≈ ₹7,350
24 Aug 2026
Bldg मधील · Unit 506
Primary sale≈ ₹48 L≈ ₹8,215
20 Aug 2026
Bldg मधील · Unit 902
Primary sale≈ ₹45 L≈ ₹7,411
20 Aug 2026
Bldg मधील · Unit 505
Primary sale≈ ₹45 L≈ ₹7,085
13 Aug 2026
Bldg मधील · Unit 1105
Primary sale≈ ₹44 L≈ ₹7,222
13 Aug 2026
Bldg मधील · Unit 605
Primary sale≈ ₹44 L≈ ₹6,927
6 Aug 2026
Bldg मधील · Unit 807
Primary sale≈ ₹44 L≈ ₹7,343
4 Aug 2026
Bldg मधील · Unit 905
Primary sale≈ ₹44 L≈ ₹7,222
30 Jul 2026
Bldg मधील · Unit 1203
Primary sale≈ ₹45 L≈ ₹6,996
29 Jul 2026
Bldg मधील · Unit 605
Primary sale≈ ₹44 L≈ ₹7,222
24 Jul 2026
Bldg मधील · Unit 505
Primary sale≈ ₹45 L≈ ₹7,386
24 Jul 2026
Bldg मधील · Unit 1309
Primary sale≈ ₹35 L≈ ₹8,251
24 Jul 2026
Bldg मधील
Primary sale≈ ₹17 L≈ ₹10,960
24 Jul 2026
Bldg मधील · Unit 801
Primary sale≈ ₹45 L≈ ₹7,129
23 Jul 2026
Bldg मधील · Unit 204
Primary sale≈ ₹45 L≈ ₹7,140
9 Jul 2026
Bldg मधील · Unit 702
Primary sale≈ ₹45 L≈ ₹7,095
30 Jun 2026
Bldg मधील · Unit 603
Primary sale≈ ₹38 L≈ ₹8,897
25 Jun 2026
Bldg मधील · Unit 1203
Primary sale≈ ₹34 L≈ ₹7,960
22 Jun 2026
Bldg मधील · Unit 1007
Primary sale≈ ₹44 L≈ ₹7,343
19 Jun 2026
Bldg मधील · Unit 804
Primary sale≈ ₹45 L≈ ₹7,140
18 Jun 2026
Bldg मधील · Unit 502
Primary sale≈ ₹44 L≈ ₹7,246
1 Jun 2026
Bldg मधील · Unit 1305
Primary sale≈ ₹45 L≈ ₹7,386
1 Jun 2026
Bldg मधील · Unit 1005
Primary sale≈ ₹45 L≈ ₹7,386
1 Jun 2026
Bldg मधील · Unit 504
Primary sale≈ ₹44 L≈ ₹6,982
1 Jun 2026
Bldg मधील · Unit 1304
Primary sale≈ ₹45 L≈ ₹7,140
21 May 2026
Bldg मधील · Unit 1301
Primary sale≈ ₹45 L≈ ₹7,129
21 May 2026
Bldg मधील · Unit 1302
Primary sale≈ ₹44 L≈ ₹7,246
19 May 2026
Bldg मधील · Unit 1006
Primary sale≈ ₹44 L≈ ₹7,531
18 May 2026
Bldg मधील · Unit 1304
Primary sale≈ ₹34 L≈ ₹8,112
13 May 2026
Bldg मधील · Unit 1106
Primary sale≈ ₹45 L≈ ₹7,350
13 May 2026
Bldg मधील · Unit 501
Primary sale≈ ₹45 L≈ ₹7,186
11 May 2026
Bldg मधील · Unit 1005
Primary sale≈ ₹44 L≈ ₹6,927
11 May 2026
Bldg मधील · Unit 206
Primary sale≈ ₹45 L≈ ₹7,702
30 Apr 2026
Bldg मधील · Unit 503
Primary sale≈ ₹45 L≈ ₹6,996
30 Apr 2026
Bldg मधील · Unit 1306
Primary sale≈ ₹44 L≈ ₹7,187
29 Apr 2026
Bldg मधील · Unit 402
Primary sale≈ ₹60 L≈ ₹9,882
29 Apr 2026
Bldg मधील · Unit 1002
Primary sale≈ ₹45 L≈ ₹7,095
20 Apr 2026
Bldg मधील · Unit 706
Primary sale≈ ₹44 L≈ ₹7,531
9 Apr 2026
Bldg मधील · Unit 1102
Primary sale≈ ₹45 L≈ ₹7,095
5 Apr 2026
Bldg मधील · Unit 604
Primary sale≈ ₹45 L≈ ₹7,140
29 Mar 2026
Bldg मधील · Unit 1103
Primary sale≈ ₹45 L≈ ₹6,996

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 4 months

Registered
23 Oct 2024
Promised
31 Dec 2027
Revised
30 Apr 2028

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210007771223 Oct 202431 Dec 202730 Apr 2028Optima HighriseProject page

2 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Wing A1451
Wing B1443

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

2 of 94 units booked (2%), as the promoter reported to MahaRERA

201 Landowner Unit · 2 units205 Landowner Unit · 1 unit2BHK · 17 units301 Landowner Unit · 1 unit305 Landowner Unit · 2 units306 Landowner Unit · 2 units405 Landowner Unit · 1 unit406 Landowner Unit · 1 unitF 13 Landowner Unit · 1 unitF 14 Landowner Unit · 1 unitF 15 Landowner Unit · 1 unitF 6 Landowner Unit · 1 unitF 7 Landowner Unit · 1 unitF 8 Landowner Unit · 1 unitG 10 Landowner Unit · 1 unitG 13 Landowner Unit · 1 unitG 14 Landowner Unit · 1 unitG 15 Landowner Unit · 1 unitG 6 Landowner Unit · 1 unitG 7 Landowner Unit · 1 unitG 8 Landowner Unit · 1 unitOffice space · 6 unitsShop · 28 units1BHK · 4 units202 Landowner Unit · 1 unit203 Landowner Unit · 1 unit206 Landowner Unit · 1 unit207 Landowner Unit · 1 unit208 Landowner Unit · 1 unit209 Landowner Unit · 1 unit304 Landowner Unit · 1 unitF 17 Landowner Unit · 1 unitF 18 Landowner Unit · 1 unitF 20 Landowner Unit · 1 unitF 24 Landowner Unit · 1 unitF 25 Landowner Unit · 1 unitG 18 Landowner Unit · 1 unitG 20 Landowner Unit · 1 unitG 25 Landowner Unit · 1 unitG 26 Landowner Unit · 1 unit
BuildingTypeCarpet areaUnitsBooked
Wing A201 Landowner Unit69.12 sq m · 744 sq ft10
Wing A205 Landowner Unit69.86 sq m · 752 sq ft10
Wing A2BHK65.03 sq m · 700 sq ft10
Wing A2BHK67.63 sq m · 728 sq ft10
Wing A2BHK67.63 sq m · 728 sq ft10
Wing A2BHK67.63 sq m · 728 sq ft10
Wing A2BHK69.12 sq m · 744 sq ft10
Wing A2BHK69.58 sq m · 749 sq ft10
Show all 94 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
Wing A2BHK69.58 sq m · 749 sq ft10
Wing A2BHK69.58 sq m · 749 sq ft10
Wing A2BHK69.58 sq m · 749 sq ft11
Wing A2BHK69.86 sq m · 752 sq ft10
Wing A2BHK69.86 sq m · 752 sq ft10
Wing A2BHK69.86 sq m · 752 sq ft10
Wing A2BHK69.86 sq m · 752 sq ft10
Wing A301 Landowner Unit69.12 sq m · 744 sq ft10
Wing A305 Landowner Unit69.86 sq m · 752 sq ft10
Wing A306 Landowner Unit65.03 sq m · 700 sq ft10
Wing A405 Landowner Unit69.86 sq m · 752 sq ft10
Wing A406 Landowner Unit65.03 sq m · 700 sq ft10
Wing AF 13 Landowner Unit18.21 sq m · 196 sq ft10
Wing AF 14 Landowner Unit21 sq m · 226 sq ft10
Wing AF 15 Landowner Unit18.02 sq m · 194 sq ft10
Wing AF 6 Landowner Unit12.91 sq m · 139 sq ft10
Wing AF 7 Landowner Unit12.17 sq m · 131 sq ft10
Wing AF 8 Landowner Unit14.79 sq m · 159 sq ft10
Wing AG 10 Landowner Unit18.95 sq m · 204 sq ft10
Wing AG 13 Landowner Unit18.3 sq m · 197 sq ft10
Wing AG 14 Landowner Unit18.02 sq m · 194 sq ft10
Wing AG 15 Landowner Unit18.02 sq m · 194 sq ft10
Wing AG 6 Landowner Unit12.93 sq m · 139 sq ft10
Wing AG 7 Landowner Unit12.17 sq m · 131 sq ft10
Wing AG 8 Landowner Unit14.79 sq m · 159 sq ft10
Wing AOffice space67.54 sq m · 727 sq ft10
Wing AOffice space77.11 sq m · 830 sq ft10
Wing AShop12.91 sq m · 139 sq ft10
Wing AShop12.91 sq m · 139 sq ft10
Wing AShop12.91 sq m · 139 sq ft10
Wing AShop13.75 sq m · 148 sq ft10
Wing AShop14.68 sq m · 158 sq ft10
Wing AShop14.96 sq m · 161 sq ft10
Wing AShop16.17 sq m · 174 sq ft10
Wing AShop16.54 sq m · 178 sq ft11
Wing AShop17.09 sq m · 184 sq ft10
Wing AShop17.63 sq m · 190 sq ft10
Wing AShop17.93 sq m · 193 sq ft10
Wing AShop17.93 sq m · 193 sq ft10
Wing AShop17.93 sq m · 193 sq ft10
Wing AShop18.95 sq m · 204 sq ft10
Wing AShop19.79 sq m · 213 sq ft10
Wing AShop19.97 sq m · 215 sq ft10
Wing B1BHK42.27 sq m · 455 sq ft10
Wing B1BHK42.36 sq m · 456 sq ft10
Wing B1BHK43.2 sq m · 465 sq ft10
Wing B1BHK43.29 sq m · 466 sq ft10
Wing B201 Landowner Unit69.03 sq m · 743 sq ft10
Wing B202 Landowner Unit67.73 sq m · 729 sq ft10
Wing B203 Landowner Unit43.29 sq m · 466 sq ft10
Wing B206 Landowner Unit66.8 sq m · 719 sq ft10
Wing B207 Landowner Unit62.52 sq m · 673 sq ft10
Wing B208 Landowner Unit42.27 sq m · 455 sq ft10
Wing B209 Landowner Unit43.2 sq m · 465 sq ft10
Wing B2BHK62.52 sq m · 673 sq ft10
Wing B2BHK63.73 sq m · 686 sq ft10
Wing B2BHK67.73 sq m · 729 sq ft10
Wing B2BHK69.03 sq m · 743 sq ft10
Wing B304 Landowner Unit42.36 sq m · 456 sq ft10
Wing B305 Landowner Unit63.73 sq m · 686 sq ft10
Wing B306 Landowner Unit66.8 sq m · 719 sq ft10
Wing BF 17 Landowner Unit21.18 sq m · 228 sq ft10
Wing BF 18 Landowner Unit20.81 sq m · 224 sq ft10
Wing BF 20 Landowner Unit14.31 sq m · 154 sq ft10
Wing BF 24 Landowner Unit14.4 sq m · 155 sq ft10
Wing BF 25 Landowner Unit12.17 sq m · 131 sq ft10
Wing BG 18 Landowner Unit18.02 sq m · 194 sq ft10
Wing BG 20 Landowner Unit14.96 sq m · 161 sq ft10
Wing BG 25 Landowner Unit10.41 sq m · 112 sq ft10
Wing BG 26 Landowner Unit14.96 sq m · 161 sq ft10
Wing BOffice space43.11 sq m · 464 sq ft10
Wing BOffice space66.33 sq m · 714 sq ft10
Wing BOffice space67.54 sq m · 727 sq ft10
Wing BOffice space135.27 sq m · 1,456 sq ft10
Wing BShop10.41 sq m · 112 sq ft10
Wing BShop10.5 sq m · 113 sq ft10
Wing BShop10.71 sq m · 115 sq ft10
Wing BShop14.31 sq m · 154 sq ft10
Wing BShop18.02 sq m · 194 sq ft10
Wing BShop18.02 sq m · 194 sq ft10
Wing BShop18.12 sq m · 195 sq ft10
Wing BShop18.21 sq m · 196 sq ft10
Wing BShop18.21 sq m · 196 sq ft10
Wing BShop18.3 sq m · 197 sq ft10
Wing BShop19.32 sq m · 208 sq ft10
Wing BShop21 sq m · 226 sq ft10

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

1 document held by Deedo, 121 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardOptima Highrise Pan Card.pdf · uploaded 27 Apr 2024Source

Legal

  • Declaration Form BForm-B for Promoter.pdf · uploaded 27 Apr 2024Source
  • Other – LegalPARTNERSHIP DEED.pdf · uploaded 18 May 2024Source
  • Legal Title reportLegal Title Report.pdf · uploaded 7 Oct 2024Source
  • Other – LegalPartnership Deed NEW.pdf · uploaded 10 May 2025Source

Migrated

  • 1 PAN CardOptima Highrise Pan Card.pdf · uploaded 27 Apr 2024Source
  • 1 Copy of Layout Approval (in case of layout)Plan 1.pdf · uploaded 27 Apr 2024Source
Show all 122 documentsShow fewer documents

Migrated

  • 1 Declaration in FORM BForm-B for Promoter.pdf · uploaded 27 Apr 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate.pdf · uploaded 27 Apr 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate.pdf · uploaded 27 Apr 2024Source
  • 1 Commencement Certificates / NA Order for plotted developmentCC Pune Mahanagarpalika.pdf · uploaded 27 Apr 2024Source
  • 1 Building Plan Approval / NA Order for plotted developmentPlan 2.pdf · uploaded 27 Apr 2024Source
  • 2 Building Plan Approval / NA Order for plotted developmentPlan 3.pdf · uploaded 27 Apr 2024Source
  • 3 Building Plan Approval / NA Order for plotted developmentPlan 4.pdf · uploaded 27 Apr 2024Source
  • 4 Building Plan Approval / NA Order for plotted developmentPlan 5.pdf · uploaded 27 Apr 2024Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFormat-A Bank declaration.pdf · uploaded 27 Apr 2024Source
  • 8 Disclosure of Interest in Other Real Estate OrganizationsYogesh Shilimkar.pdf · uploaded 27 Apr 2024Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsAbhijit Chirke.pdf · uploaded 27 Apr 2024Source
  • 2 Disclosure of Interest in Other Real Estate OrganizationsAbhijit Shilimkar.pdf · uploaded 27 Apr 2024Source
  • 3 Disclosure of Interest in Other Real Estate OrganizationsMayur Yele.pdf · uploaded 27 Apr 2024Source
  • 4 Disclosure of Interest in Other Real Estate OrganizationsPotawale.pdf · uploaded 27 Apr 2024Source
  • 5 Disclosure of Interest in Other Real Estate OrganizationsSandip Dangat.pdf · uploaded 27 Apr 2024Source
  • 6 Disclosure of Interest in Other Real Estate OrganizationsSandip Zagade.pdf · uploaded 27 Apr 2024Source
  • 7 Disclosure of Interest in Other Real Estate OrganizationsTukaram Anarse.pdf · uploaded 27 Apr 2024Source
  • 1 a Details of encumbrances concerned to FinanceEncumbrance letter Legal.pdf · uploaded 4 May 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)RERA CA Certificate.pdf · uploaded 4 May 2024Source
  • 1 b Details of encumbrances concerned to LegalEncumbrance letter Legal.pdf · uploaded 4 May 2024Source
  • 1 Other – TechnicalAnnexure A.pdf · uploaded 4 May 2024Source
  • 1 Other – LegalPARTNERSHIP DEED.pdf · uploaded 18 May 2024Source
  • 1 Declaration about Commencement CertificateDeclaration About CC.pdf · uploaded 20 May 2024Source
  • 2 a Details of encumbrances concerned to FinanceEncumbrance - Finance.pdf · uploaded 11 Jun 2024Source
  • 3 a Details of encumbrances concerned to FinanceEncumbrance - Legal.pdf · uploaded 11 Jun 2024Source
  • 1 CERSAI detailsCERSAI.pdf · uploaded 11 Jun 2024Source
  • 2 b Details of encumbrances concerned to LegalEncumbrance - Finance.pdf · uploaded 11 Jun 2024Source
  • 3 b Details of encumbrances concerned to LegalEncumbrance - Legal.pdf · uploaded 11 Jun 2024Source
  • 1 Copy of the legal title reportLegal Title Report.pdf · uploaded 7 Oct 2024Source
  • 1 Deviation Report with respect to Allotment letterNo deviation for allotment letter.pdf · uploaded 7 Oct 2024Source
  • 1 Deviation Report with respect to model copy of AgreementNO DEVIATION FROM MODEL AFS.pdf · uploaded 7 Oct 2024Source
  • 1 Proforma of Allotment letterPROFORMA OF ALLOTMENT LETTER.pdf · uploaded 18 Oct 2024Source
  • 1 Proforma of Agreement for saleoptima sale agree.pdf · uploaded 21 Oct 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate - Q2 Form 1.pdf · uploaded 23 Jan 2025Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate - Form 1 Q3.pdf · uploaded 23 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 CA Certificate Q2.pdf · uploaded 23 Jan 2025Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 CA Certificate Q3.pdf · uploaded 23 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate - Q2-Form 2.pdf · uploaded 23 Jan 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate-Form 2 Q3.pdf · uploaded 23 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate - Q2 Form 1.pdf · uploaded 23 Jan 2025Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate - Form 1 Q3.pdf · uploaded 23 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 CA Certificate Q2.pdf · uploaded 23 Jan 2025Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 CA Certificate Q3.pdf · uploaded 23 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate - Q2-Form 2.pdf · uploaded 23 Jan 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate-Form 2 Q3.pdf · uploaded 23 Jan 2025Source
  • 1 Copy of Layout Approval (in case of layout)Optima Plan 1.pdf · uploaded 10 May 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)01 Architect Certificate - Form 1 Q4 (1).pdf · uploaded 10 May 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Form 3 Q4.pdf · uploaded 10 May 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)02 Engineer Certificate-Form 2 Q4.pdf · uploaded 10 May 2025Source
  • 1 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 10 May 2025Source
  • 1 Building Plan Approval / NA Order for plotted developmentOptima Plan 1.pdf · uploaded 10 May 2025Source
  • 2 Building Plan Approval / NA Order for plotted developmentOptima Plan 2.pdf · uploaded 10 May 2025Source
  • 3 Building Plan Approval / NA Order for plotted developmentOptima Plan 3.pdf · uploaded 10 May 2025Source
  • 4 Building Plan Approval / NA Order for plotted developmentOptima Plan 4.pdf · uploaded 10 May 2025Source
  • 5 Building Plan Approval / NA Order for plotted developmentOptima Plan 5.pdf · uploaded 10 May 2025Source
  • 1 Other – LegalPartnership Deed NEW.pdf · uploaded 10 May 2025Source
  • 1 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD AND BOOKED INVENTORY.pdf · uploaded 10 May 2025Source
  • 1 Declaration about Commencement CertificateDECLARATION ABOUT COMMENCEMENT CERTIFICATE.pdf · uploaded 10 May 2025Source
  • Form 101 Architect Certificate - Form 1 Q4 (1).pdf · uploaded 2 Jun 2025Source
  • Form 1Architect Certificate - Form 1 Q3.pdf · uploaded 2 Jun 2025Source
  • Form 202 Engineer Certificate-Form 2 Q4.pdf · uploaded 2 Jun 2025Source
  • Form 2Engineer Certificate-Form 2 Q3.pdf · uploaded 2 Jun 2025Source
  • Form 3CA Certificate Form 3 Q4.pdf · uploaded 2 Jun 2025Source
  • Form 3Form 3 CA Certificate Q3.pdf · uploaded 2 Jun 2025Source
  • Disclosure of Sold and Booked InventoryDISCLOSURE OF SOLD AND BOOKED INVENTORY.pdf · uploaded 2 Jun 2025Source
  • Form 2A (FY 2024-2025)Form 2A -2024-25.pdf · uploaded 2 Jun 2025Source
  • Form 5 (FY 2024-2025)FORM 5-F Y 2024-25.pdf · uploaded 2 Jun 2025Source
  • Withdrawal Update Form 1FORM 1 ARCHITECT CERTIFICATE.pdf · uploaded 24 Nov 2025Source
  • Withdrawal Update Form 2Highrise - Engineeru0027s Certificate Q1.pdf · uploaded 24 Nov 2025Source
  • Withdrawal Update Form 3Highrise- CA Certificate Q1.pdf · uploaded 24 Nov 2025Source
  • Withdrawal Update Form 1FORM 1 ARCHITECT CERTIFICATE.pdf · uploaded 28 Nov 2025Source
  • Withdrawal Update Form 2FORM 2 ENGINEER CERTIFICATE.pdf · uploaded 28 Nov 2025Source
  • Withdrawal Update Form 3FORM 3 CA CERTIFICATE.pdf · uploaded 28 Nov 2025Source
  • Withdrawal Update Form 1FORM 1 ARCHITECT CERTIFICATE.pdf · uploaded 24 Mar 2026Source
  • Withdrawal Update Form 2FORM 2 ENGINEER CERTIFICATE.pdf · uploaded 24 Mar 2026Source
  • Withdrawal Update Form 3FORM 3 CA CERTIFICATE.pdf · uploaded 24 Mar 2026Source
  • Form 5 (FY 2025-2026)Form 5.pdf · uploaded 18 Jun 2026Source
  • Withdrawal Update Form 1Architect Certificate Q4_Aspire.pdf · uploaded 22 Jun 2026Source
  • Withdrawal Update Form 2Engineer Certificate Q4_Aspire.pdf · uploaded 22 Jun 2026Source
  • Withdrawal Update Form 3CA Certificate Q4_Aspire (1).pdf · uploaded 22 Jun 2026Source
  • Form 2A (FY 2025-2026)form 2A.pdf · uploaded 22 Jun 2026Source
  • Withdrawal Update Form 1FORM 1 ARCHITECT CERTIFICATE.pdf · uploaded 2 Sep 2026Source
  • Withdrawal Update Form 2FORM 2 ENGINEER CERTIFICATE.pdf · uploaded 2 Sep 2026Source
  • Withdrawal Update Form 3FORM 3 CA CERTIFICATE.pdf · uploaded 2 Sep 2026Source

Technical

  • DocumentPlan 5.pdf · uploaded 27 Apr 2024Source
  • DocumentPlan 4.pdf · uploaded 27 Apr 2024Source
  • DocumentPlan 3.pdf · uploaded 27 Apr 2024Source
  • DocumentPlan 2.pdf · uploaded 27 Apr 2024Source
  • DocumentPlan 1.pdf · uploaded 27 Apr 2024Source
  • Other – TechnicalAnnexure A.pdf · uploaded 4 May 2024Source
  • DocumentOptima Plan 1.pdf · uploaded 10 May 2025Source
  • DocumentOptima Plan 1.pdf · uploaded 10 May 2025Source
  • DocumentOptima Plan 2.pdf · uploaded 10 May 2025Source
  • DocumentOptima Plan 3.pdf · uploaded 10 May 2025Source
  • DocumentOptima Plan 4.pdf · uploaded 10 May 2025Source
  • DocumentOptima Plan 5.pdf · uploaded 10 May 2025Source
  • DocumentPLAN 1-6.pdf · uploaded 24 Mar 2026Source
  • DocumentPLAN 2-6.pdf · uploaded 24 Mar 2026Source
  • DocumentPLAN 3-6.pdf · uploaded 24 Mar 2026Source
  • DocumentPLAN 4-6.pdf · uploaded 24 Mar 2026Source
  • DocumentPLAN 5-6.pdf · uploaded 24 Mar 2026Source
  • DocumentPLAN 6-6.pdf · uploaded 24 Mar 2026Source

Technical (Architect)

  • DocumentArchitect Certificate - Q2 Form 1.pdf · uploaded 23 Jan 2025Source
  • DocumentArchitect Certificate - Form 1 Q3.pdf · uploaded 23 Jan 2025Source
  • DocumentArchitect Certificate - Q2 Form 1.pdf · uploaded 23 Jan 2025Source
  • DocumentArchitect Certificate - Form 1 Q3.pdf · uploaded 23 Jan 2025Source
  • Document01 Architect Certificate - Form 1 Q4 (1).pdf · uploaded 10 May 2025Source
  • DocumentFORM 1 ARCHITECT CERTIFICATE.pdf · uploaded 2 Sep 2026Source

Technical (Engineer)

  • DocumentEngineer Certificate - Q2-Form 2.pdf · uploaded 23 Jan 2025Source
  • DocumentEngineer Certificate-Form 2 Q3.pdf · uploaded 23 Jan 2025Source
  • DocumentEngineer Certificate - Q2-Form 2.pdf · uploaded 23 Jan 2025Source
  • DocumentEngineer Certificate-Form 2 Q3.pdf · uploaded 23 Jan 2025Source
  • Document02 Engineer Certificate-Form 2 Q4.pdf · uploaded 10 May 2025Source
  • DocumentFORM 2 ENGINEER CERTIFICATE.pdf · uploaded 2 Sep 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In AMBEGAON Bk, Haveli taluka

Survey, CTS, gat or plot numbers

1/61/71/81/92Hissa No 1/2Survey No 28

Boundaries

North
Property belongs to Katkar Mahadik and Sakpal
South
9 mtr wide road and property belong Balaji co-op
East
Property belongs to Sarjeroa G Shilimkar
West
18 mtr wide DP Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectRushikesh G Zagade—
Chartered accountantGanesh Prabhakar Dhindle—
Chartered accountantGaurav Kailas Joshi—
EngineerMahesh Savata Zagade—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology