Dhiraj Riseonic

Certificate Signed

Ambegaon Bk, Pune 411046 |Promoter: M/s Dhiraj Construction

Residential / Group HousingRERAP52100055758
16 Apr 2024Registered with MahaRERA
31 Mar 2029Promised completion
31 Jul 2029Revised completionPushed back 4 months
2Buildings
68Units registered50 booked (74%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Buildings
2
Unit types
2BHK68 units in all
Address
43/1/1/3A/1A/2 (P) +43/1/4/1/1/11(P)+43/1/1/3B/2B/18, Dattanagar Jamburwadi Road, DattanagarPIN 411046
Designated bank account
171
Developed in phases
Yes

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 4 months

Registered
16 Apr 2024
Promised
31 Mar 2029
Revised
31 Jul 2029

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210005575816 Apr 202431 Mar 202931 Jul 2029M/s Dhiraj ConstructionProject page

2 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Wing A19—
Wing B2068

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

50 of 68 units booked (74%), as the promoter reported to MahaRERA

2BHK · 68 units
TypeCarpet areaUnitsBooked
2BHK60.82 sq m · 655 sq ft32
2BHK74.67 sq m · 804 sq ft3425
2BHK76.03 sq m · 818 sq ft2922
2BHK83.4 sq m · 898 sq ft21

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

1 document held by Deedo, 231 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardDHIRAJ CONSTRUCTION PAN CARD 01.PDF · uploaded 27 Mar 2024Source
  • Othersbank formate SIGNED 28062025.pdf · uploaded 28 Jun 2025Source

Legal

  • Legal Title report2 LEGAL TITLE REPORT-SIGNED.pdf · uploaded 27 Mar 2024Source
  • Legal Title report3 30 YEARS LEGAL TITLE REPORT-1-15.pdf · uploaded 27 Mar 2024Source
  • Legal Title report4 30 YEARS LEGAL TITLE REPORT-16-30.pdf · uploaded 27 Mar 2024Source
  • Declaration Form B20 Form B - Promoter.pdf · uploaded 27 Mar 2024Source
  • Other – LegalAmbegaon Bk_43_1_1_3अ_1अ_2_Satbara (1).pdf · uploaded 2 Apr 2024Source
Show all 232 documentsShow fewer documents

Legal

  • Other – LegalAmbegaon Bk_43_1_4_1_1_11_Satbara (2).pdf · uploaded 2 Apr 2024Source
  • Other – LegalAmbegaon Bk_43_1_1_3ब_2ब_18_Satbara (3).pdf · uploaded 2 Apr 2024Source
  • Other – LegalSD No- 6192 Suman Bhosale to Prakash Desai.pdf · uploaded 2 Apr 2024Source
  • Other – LegalSD NO - 2137 Sahebrao Dhamal to Prakash Desai.pdf · uploaded 2 Apr 2024Source
  • Other – LegalSD NO-4469 Dilip Dhumal to Prakash Desai.pdf · uploaded 2 Apr 2024Source
  • Other – LegalCorrection Deed NO-4518 Dilip Dhumal to Prakash Desai-1-10.pdf · uploaded 2 Apr 2024Source
  • Other – LegalSD NO 7874 Indrajeet Singh Babber to Prakash Desai.pdf · uploaded 2 Apr 2024Source
  • Other – LegalCorrection Deed NO 10744 Indrajeet to Prakash Desai.pdf · uploaded 2 Apr 2024Source
  • Other – LegalSD NO 1694 Venketesh Pawar to Prakash Desai.pdf · uploaded 2 Apr 2024Source
  • Other – LegalSD NO-1561 Kishor Phalke to Prakash Desai.pdf · uploaded 2 Apr 2024Source
  • Other – LegalSD NO-5607 Anjana Daud to Prakash Desai.pdf · uploaded 2 Apr 2024Source
  • Other – LegalSD NO - 1168 Raghunath Jadhav to prakash Desai.pdf · uploaded 2 Apr 2024Source
  • Other – LegalSD NO 3247 - Shivaji Dhumal to Vijaya Desai.pdf · uploaded 2 Apr 2024Source
  • Other – LegalSD NO- 2695 Vijaya madam to dadasaheb dhamal.pdf · uploaded 2 Apr 2024Source
  • Other – LegalSD NO- 6193 - Nalini Patne TO Vijaya Desai.pdf · uploaded 2 Apr 2024Source
  • Other – LegalSR NO-6668 Nandkumar to Vijaya Desai.pdf · uploaded 2 Apr 2024Source
  • Other – LegalSD NO 93 Baburao Rane to vijaya desai.pdf · uploaded 2 Apr 2024Source
  • Other – LegalExchange Deed 1924 Sankpal to Vijaya Desai.PDF · uploaded 2 Apr 2024Source
  • Other – LegalSD NO - 6194 Sushila Chavan to Dhiraj Con.pdf · uploaded 2 Apr 2024Source
  • Other – LegalSD NO - 4040 Jayshree Jagtap to DHEPL.PDF · uploaded 2 Apr 2024Source
  • Other – LegalSD NO-4350 - Raisoni to vijaya Desai.pdf · uploaded 2 Apr 2024Source
  • Other – LegalSD NO 94 Baburao Rane to vijaya desai.pdf · uploaded 2 Apr 2024Source

Migrated

  • 1 PAN CardDHIRAJ CONSTRUCTION PAN CARD 01.PDF · uploaded 27 Mar 2024Source
  • 1 Copy of the legal title report2 LEGAL TITLE REPORT-SIGNED.pdf · uploaded 27 Mar 2024Source
  • 2 Copy of the legal title report3 30 YEARS LEGAL TITLE REPORT-1-15.pdf · uploaded 27 Mar 2024Source
  • 3 Copy of the legal title report4 30 YEARS LEGAL TITLE REPORT-16-30.pdf · uploaded 27 Mar 2024Source
  • 1 a Details of encumbrances concerned to Finance5-6 Encumbrance to Finance and Legal.pdf · uploaded 27 Mar 2024Source
  • 1 b Details of encumbrances concerned to Legal5-6 Encumbrance to Finance and Legal.pdf · uploaded 27 Mar 2024Source
  • 1 Copy of Layout Approval (in case of layout)7 Layout 1.pdf · uploaded 27 Mar 2024Source
  • 2 Copy of Layout Approval (in case of layout)8 Plan 2 of 2.pdf · uploaded 27 Mar 2024Source
  • 1 Building Plan Approval / NA Order for plotted development9 Building Plan 1 of 8.pdf · uploaded 27 Mar 2024Source
  • 2 Building Plan Approval / NA Order for plotted development10 Building Plan 2 of 8.pdf · uploaded 27 Mar 2024Source
  • 3 Building Plan Approval / NA Order for plotted development11 Building Plan 3 of 8.pdf · uploaded 27 Mar 2024Source
  • 4 Building Plan Approval / NA Order for plotted development12 Building Plan 4 of 8.pdf · uploaded 27 Mar 2024Source
  • 5 Building Plan Approval / NA Order for plotted development13 Building Plan 5 of 8.pdf · uploaded 27 Mar 2024Source
  • 6 Building Plan Approval / NA Order for plotted development14 Building Plan 6 of 8.pdf · uploaded 27 Mar 2024Source
  • 7 Building Plan Approval / NA Order for plotted development15 Building Plan 7 of 8.pdf · uploaded 27 Mar 2024Source
  • 8 Building Plan Approval / NA Order for plotted development16 Building Plan 8 of 8.pdf · uploaded 27 Mar 2024Source
  • 1 Commencement Certificates / NA Order for plotted development17 - CC.pdf · uploaded 27 Mar 2024Source
  • 2 Commencement Certificates / NA Order for plotted development18 - CC.pdf · uploaded 27 Mar 2024Source
  • 1 Declaration about Commencement Certificate19 Declaration About Commencement Certificate.pdf · uploaded 27 Mar 2024Source
  • 1 Declaration in FORM B20 Form B - Promoter.pdf · uploaded 27 Mar 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)21 Form 1.pdf · uploaded 27 Mar 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)22 Form 2 Engg certificate.pdf · uploaded 27 Mar 2024Source
  • 1 CERSAI detailsSelf Declaration Regarding Cersai Report.pdf · uploaded 27 Mar 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)29 FORM 3 CA.pdf · uploaded 27 Mar 2024Source
  • 1 Disclosure of Interest in Other Real Estate Organizations30 interest in other real estate organisation-1.pdf · uploaded 27 Mar 2024Source
  • 2 Disclosure of Interest in Other Real Estate Organizations31 Interest in other real estate organisation-2.pdf · uploaded 27 Mar 2024Source
  • 3 Disclosure of Interest in Other Real Estate Organizations32 Interest in other real estate organisation-3.pdf · uploaded 27 Mar 2024Source
  • 4 Disclosure of Interest in Other Real Estate Organizations33 Interest in other real estate organisation-5.pdf · uploaded 27 Mar 2024Source
  • 1 Proforma of Allotment letter41 Allotment letter.pdf · uploaded 27 Mar 2024Source
  • 1 Proforma of Agreement for sale38 Agreement For Sale - Dhiraj Constrcution.pdf · uploaded 27 Mar 2024Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the same50 Declaration about Separate Bank Account.pdf · uploaded 27 Mar 2024Source
  • 1 Deviation Report with respect to Allotment letter51 Deviation Report to Allotment Letter.pdf · uploaded 27 Mar 2024Source
  • 1 Deviation Report with respect to model copy of AgreementDeviation Report- Agreement to sale.pdf · uploaded 27 Mar 2024Source
  • 1 Other – Technical48 Annexure A.pdf · uploaded 27 Mar 2024Source
  • 3 Copy of Layout Approval (in case of layout)9 Declaration Regarding Sanctioned Plan.pdf · uploaded 29 Mar 2024Source
  • 4 Copy of Layout Approval (in case of layout)9 Building Plan 1 of 8 - highlighted.pdf · uploaded 2 Apr 2024Source
  • 1 Other – LegalAmbegaon Bk_43_1_1_3अ_1अ_2_Satbara (1).pdf · uploaded 2 Apr 2024Source
  • 2 Other – LegalAmbegaon Bk_43_1_4_1_1_11_Satbara (2).pdf · uploaded 2 Apr 2024Source
  • 3 Other – LegalAmbegaon Bk_43_1_1_3ब_2ब_18_Satbara (3).pdf · uploaded 2 Apr 2024Source
  • 4 Other – LegalSD No- 6192 Suman Bhosale to Prakash Desai.pdf · uploaded 2 Apr 2024Source
  • 5 Other – LegalSD NO - 2137 Sahebrao Dhamal to Prakash Desai.pdf · uploaded 2 Apr 2024Source
  • 6 Other – LegalSD NO-4469 Dilip Dhumal to Prakash Desai.pdf · uploaded 2 Apr 2024Source
  • 7 Other – LegalCorrection Deed NO-4518 Dilip Dhumal to Prakash Desai-1-10.pdf · uploaded 2 Apr 2024Source
  • 8 Other – LegalSD NO 7874 Indrajeet Singh Babber to Prakash Desai.pdf · uploaded 2 Apr 2024Source
  • 9 Other – LegalCorrection Deed NO 10744 Indrajeet to Prakash Desai.pdf · uploaded 2 Apr 2024Source
  • 10 Other – LegalSD NO 1694 Venketesh Pawar to Prakash Desai.pdf · uploaded 2 Apr 2024Source
  • 11 Other – LegalSD NO-1561 Kishor Phalke to Prakash Desai.pdf · uploaded 2 Apr 2024Source
  • 12 Other – LegalSD NO-5607 Anjana Daud to Prakash Desai.pdf · uploaded 2 Apr 2024Source
  • 13 Other – LegalSD NO - 1168 Raghunath Jadhav to prakash Desai.pdf · uploaded 2 Apr 2024Source
  • 14 Other – LegalSD NO 3247 - Shivaji Dhumal to Vijaya Desai.pdf · uploaded 2 Apr 2024Source
  • 15 Other – LegalSD NO- 2695 Vijaya madam to dadasaheb dhamal.pdf · uploaded 2 Apr 2024Source
  • 16 Other – LegalSD NO- 6193 - Nalini Patne TO Vijaya Desai.pdf · uploaded 2 Apr 2024Source
  • 17 Other – LegalSR NO-6668 Nandkumar to Vijaya Desai.pdf · uploaded 2 Apr 2024Source
  • 18 Other – LegalSD NO 93 Baburao Rane to vijaya desai.pdf · uploaded 2 Apr 2024Source
  • 19 Other – LegalExchange Deed 1924 Sankpal to Vijaya Desai.PDF · uploaded 2 Apr 2024Source
  • 20 Other – LegalSD NO - 6194 Sushila Chavan to Dhiraj Con.pdf · uploaded 2 Apr 2024Source
  • 21 Other – LegalSD NO - 4040 Jayshree Jagtap to DHEPL.PDF · uploaded 2 Apr 2024Source
  • 22 Other – LegalSD NO-4350 - Raisoni to vijaya Desai.pdf · uploaded 2 Apr 2024Source
  • 23 Other – LegalSD NO 94 Baburao Rane to vijaya desai.pdf · uploaded 2 Apr 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM-1 ARCHITECT'S CERTIFICATE.pdf · uploaded 19 Jul 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM-2-ENGINEERS CERTIFICATE.pdf · uploaded 19 Jul 2024Source
  • 1 Disclosure of sold/ booked inventorySOLD.pdf · uploaded 19 Jul 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form - 3 CA Certificate_compressed.pdf · uploaded 19 Jul 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARC.pdf · uploaded 16 Oct 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA_compressed.pdf · uploaded 16 Oct 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGG.pdf · uploaded 16 Oct 2024Source
  • 2 Disclosure of sold/ booked inventorysold Inventory.pdf · uploaded 16 Oct 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARC.pdf · uploaded 11 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA_compressed (1).pdf · uploaded 11 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGG.pdf · uploaded 11 Jan 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGG1.pdf · uploaded 11 Jan 2025Source
  • 1 Disclosure of sold/ booked inventorySOLD UNSOLD INVENTORY.pdf · uploaded 11 Jan 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)2A.pdf · uploaded 11 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)250418- Architect Certificate- 18TH WITH S.pdf · uploaded 19 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA CERTIFICATE 150425 From-3.pdf · uploaded 19 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate Form-2.pdf · uploaded 19 Apr 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Engineer certificate Form-2A.pdf · uploaded 19 Apr 2025Source
  • 1 Disclosure of sold/ booked inventorySOLD INVENTORY.pdf · uploaded 19 Apr 2025Source
  • 1 Copy of Layout Approval (in case of layout)1.pdf · uploaded 28 Apr 2025Source
  • 1 Building Plan Approval / NA Order for plotted development2.pdf · uploaded 28 Apr 2025Source
  • 2 Building Plan Approval / NA Order for plotted development3.pdf · uploaded 28 Apr 2025Source
  • 3 Building Plan Approval / NA Order for plotted development4.pdf · uploaded 28 Apr 2025Source
  • 4 Building Plan Approval / NA Order for plotted development5.pdf · uploaded 28 Apr 2025Source
  • 5 Building Plan Approval / NA Order for plotted development6.pdf · uploaded 28 Apr 2025Source
  • 6 Building Plan Approval / NA Order for plotted development7.pdf · uploaded 28 Apr 2025Source
  • 7 Building Plan Approval / NA Order for plotted development8.pdf · uploaded 28 Apr 2025Source
  • 8 Building Plan Approval / NA Order for plotted development9.pdf · uploaded 28 Apr 2025Source
  • 9 Building Plan Approval / NA Order for plotted development10.pdf · uploaded 28 Apr 2025Source
  • 10 Building Plan Approval / NA Order for plotted development11.pdf · uploaded 28 Apr 2025Source
  • 1 Proforma of Agreement for saleAgree.pdf · uploaded 3 May 2025Source
  • 2 Proforma of Agreement for saleAgree.pdf · uploaded 3 May 2025Source
  • Form 1Architech Certificate.pdf · uploaded 22 Jul 2025Source
  • Form 2Engineer Certificate.pdf · uploaded 22 Jul 2025Source
  • Form 3CA CERTIFICATE_compressed.pdf · uploaded 22 Jul 2025Source
  • Disclosure of Sold and Booked InventoryRERA INVENTORY.pdf · uploaded 22 Jul 2025Source
  • Form 5 (FY 2024-2025)20254 2025 sign form 5.pdf · uploaded 30 Sep 2025Source
  • Withdrawal Update Form 1F1.pdf · uploaded 10 Oct 2025Source
  • Withdrawal Update Form 1F1.pdf · uploaded 10 Oct 2025Source
  • Withdrawal Update Form 1F1.pdf · uploaded 10 Oct 2025Source
  • Withdrawal Update Form 1F1.pdf · uploaded 10 Oct 2025Source
  • Withdrawal Update Form 1F1.pdf · uploaded 10 Oct 2025Source
  • Withdrawal Update Form 1F1.pdf · uploaded 10 Oct 2025Source
  • Withdrawal Update Form 1F1.pdf · uploaded 10 Oct 2025Source
  • Withdrawal Update Form 1F1.pdf · uploaded 10 Oct 2025Source
  • Withdrawal Update Form 1F1.pdf · uploaded 10 Oct 2025Source
  • Withdrawal Update Form 1F1.pdf · uploaded 10 Oct 2025Source
  • Withdrawal Update Form 2FORM-2-ENGINEERS CERTIFICATE.pdf · uploaded 10 Oct 2025Source
  • Withdrawal Update Form 2FORM-2-ENGINEERS CERTIFICATE.pdf · uploaded 10 Oct 2025Source
  • Withdrawal Update Form 2FORM-2-ENGINEERS CERTIFICATE.pdf · uploaded 10 Oct 2025Source
  • Withdrawal Update Form 2FORM-2-ENGINEERS CERTIFICATE.pdf · uploaded 10 Oct 2025Source
  • Withdrawal Update Form 2FORM-2-ENGINEERS CERTIFICATE.pdf · uploaded 10 Oct 2025Source
  • Withdrawal Update Form 2FORM-2-ENGINEERS CERTIFICATE.pdf · uploaded 10 Oct 2025Source
  • Withdrawal Update Form 2FORM-2-ENGINEERS CERTIFICATE.pdf · uploaded 10 Oct 2025Source
  • Withdrawal Update Form 2F2.pdf · uploaded 10 Oct 2025Source
  • Withdrawal Update Form 2F2.pdf · uploaded 10 Oct 2025Source
  • Withdrawal Update Form 2Withdrawal Application Form2.pdf · uploaded 10 Oct 2025Source
  • Withdrawal Update Form 3F3.pdf · uploaded 10 Oct 2025Source
  • Withdrawal Update Form 3F3.pdf · uploaded 10 Oct 2025Source
  • Withdrawal Update Form 3F3.pdf · uploaded 10 Oct 2025Source
  • Withdrawal Update Form 3F3.pdf · uploaded 10 Oct 2025Source
  • Withdrawal Update Form 3F3.pdf · uploaded 10 Oct 2025Source
  • Withdrawal Update Form 3F3.pdf · uploaded 10 Oct 2025Source
  • Withdrawal Update Form 3F3.pdf · uploaded 10 Oct 2025Source
  • Withdrawal Update Form 3F3.pdf · uploaded 10 Oct 2025Source
  • Withdrawal Update Form 3F3.pdf · uploaded 10 Oct 2025Source
  • Withdrawal Update Form 3F3.pdf · uploaded 10 Oct 2025Source
  • Withdrawal Update Form 1FORM 1.pdf · uploaded 13 Jan 2026Source
  • Withdrawal Update Form 2FORM 2.pdf · uploaded 13 Jan 2026Source
  • Withdrawal Update Form 3FORM 3.pdf · uploaded 13 Jan 2026Source
  • Withdrawal Update Form 1FORM 1.pdf · uploaded 9 Apr 2026Source
  • Withdrawal Update Form 2FORM 2.pdf · uploaded 9 Apr 2026Source
  • Withdrawal Update Form 3FORM 3.pdf · uploaded 9 Apr 2026Source
  • Withdrawal Update Form 1FORM-1.pdf · uploaded 10 Jul 2026Source
  • Withdrawal Update Form 2FORM 2.pdf · uploaded 10 Jul 2026Source
  • Withdrawal Update Form 3FORM-3.pdf · uploaded 10 Jul 2026Source
  • Withdrawal Update Form 1Form 1.pdf · uploaded 10 Oct 2026Source
  • Withdrawal Update Form 1Form 1.pdf · uploaded 10 Oct 2026Source
  • Withdrawal Update Form 1Form 1.pdf · uploaded 10 Oct 2026Source
  • Withdrawal Update Form 2FORM 2.pdf · uploaded 10 Oct 2026Source
  • Withdrawal Update Form 2FORM 2.pdf · uploaded 10 Oct 2026Source
  • Withdrawal Update Form 2Form 2.pdf · uploaded 10 Oct 2026Source
  • Withdrawal Update Form 3Form 3.pdf · uploaded 10 Oct 2026Source
  • Withdrawal Update Form 3Form 3.pdf · uploaded 10 Oct 2026Source
  • Withdrawal Update Form 3Form 3.pdf · uploaded 10 Oct 2026Source

Technical

  • Document7 Layout 1.pdf · uploaded 27 Mar 2024Source
  • Document8 Plan 2 of 2.pdf · uploaded 27 Mar 2024Source
  • Document9 Building Plan 1 of 8.pdf · uploaded 27 Mar 2024Source
  • Document10 Building Plan 2 of 8.pdf · uploaded 27 Mar 2024Source
  • Document11 Building Plan 3 of 8.pdf · uploaded 27 Mar 2024Source
  • Document12 Building Plan 4 of 8.pdf · uploaded 27 Mar 2024Source
  • Document13 Building Plan 5 of 8.pdf · uploaded 27 Mar 2024Source
  • Document14 Building Plan 6 of 8.pdf · uploaded 27 Mar 2024Source
  • Document15 Building Plan 7 of 8.pdf · uploaded 27 Mar 2024Source
  • Document16 Building Plan 8 of 8.pdf · uploaded 27 Mar 2024Source
  • Other – Technical48 Annexure A.pdf · uploaded 27 Mar 2024Source
  • Document9 Declaration Regarding Sanctioned Plan.pdf · uploaded 29 Mar 2024Source
  • Document9 Building Plan 1 of 8 - highlighted.pdf · uploaded 2 Apr 2024Source
  • Document1.pdf · uploaded 28 Apr 2025Source
  • Document2.pdf · uploaded 28 Apr 2025Source
  • Document3.pdf · uploaded 28 Apr 2025Source
  • Document4.pdf · uploaded 28 Apr 2025Source
  • Document5.pdf · uploaded 28 Apr 2025Source
  • Document6.pdf · uploaded 28 Apr 2025Source
  • Document7.pdf · uploaded 28 Apr 2025Source
  • Document8.pdf · uploaded 28 Apr 2025Source
  • Document9.pdf · uploaded 28 Apr 2025Source
  • Document10.pdf · uploaded 28 Apr 2025Source
  • Document11.pdf · uploaded 28 Apr 2025Source
  • Document1.pdf · uploaded 12 Jul 2025Source
  • Document2.pdf · uploaded 12 Jul 2025Source
  • Document3.pdf · uploaded 12 Jul 2025Source
  • Document4.pdf · uploaded 12 Jul 2025Source
  • Document5.pdf · uploaded 12 Jul 2025Source
  • Document6.pdf · uploaded 12 Jul 2025Source
  • Document7.pdf · uploaded 12 Jul 2025Source
  • Document8.pdf · uploaded 12 Jul 2025Source
  • Document9.pdf · uploaded 12 Jul 2025Source
  • Document10.pdf · uploaded 12 Jul 2025Source
  • Document11.pdf · uploaded 12 Jul 2025Source
  • DocumentSHEET NO - 1_compressed.pdf · uploaded 15 Nov 2025Source
  • DocumentSHEET NO - 2.pdf · uploaded 15 Nov 2025Source
  • DocumentSHEET NO - 3.PDF · uploaded 15 Nov 2025Source
  • DocumentSHEET NO - 4_compressed.pdf · uploaded 15 Nov 2025Source
  • DocumentSHEET NO - 5_compressed.pdf · uploaded 15 Nov 2025Source
  • DocumentSHEET NO - 6_compressed.pdf · uploaded 15 Nov 2025Source
  • DocumentSHEET NO - 7_compressed.pdf · uploaded 15 Nov 2025Source
  • DocumentSHEET NO - 8_compressed.pdf · uploaded 15 Nov 2025Source
  • DocumentSHEET NO - 9.PDF · uploaded 15 Nov 2025Source
  • DocumentSHEET NO - 10.PDF · uploaded 15 Nov 2025Source
  • DocumentSHEET NO - 11_compressed.pdf · uploaded 15 Nov 2025Source
  • DocumentSHEET NO - 12_compressed.pdf · uploaded 15 Nov 2025Source
  • DocumentSHEET NO - 13.PDF · uploaded 15 Nov 2025Source
  • DocumentSHEET NO - 14.PDF · uploaded 15 Nov 2025Source

Technical (Architect)

  • DocumentARC.pdf · uploaded 16 Oct 2024Source
  • DocumentARC.pdf · uploaded 11 Jan 2025Source
  • Document250418- Architect Certificate- 18TH WITH S.pdf · uploaded 19 Apr 2025Source
  • DocumentForm 1.pdf · uploaded 10 Oct 2026Source

Technical (Engineer)

  • DocumentENGG.pdf · uploaded 16 Oct 2024Source
  • DocumentENGG.pdf · uploaded 11 Jan 2025Source
  • DocumentENGG1.pdf · uploaded 11 Jan 2025Source
  • DocumentEngineer Certificate Form-2.pdf · uploaded 19 Apr 2025Source
  • DocumentForm 2.pdf · uploaded 10 Oct 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In AMBEGAON Bk, Haveli taluka

Survey, CTS, gat or plot numbers

43/1/1/3A/1A/2 (P) +43/1/4/1/1/11(P)+43/1/1/3B/2B/18

Boundaries

North
Part land for Survey No 43
South
Amenity space for MSR Olive Society
East
Road Dattavihar Society and Lilavati Apartment
West
Road and part land for Survey No 43

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectSunil Asalkar—
Chartered accountantANUPAMA shetty—
Chartered accountantGanesh Bhoyate—
Chartered accountantVishvajeet Nalage & Company—
Chartered accountantYashwant Khutwad—
EngineerMerit Consultancy—
EngineerSagar Shivaji Patil—

Source: MahaRERA project page. Contact details are not shown.