Skip to content
Deedo home
Menu
Others · 3 buildings · 242 unitsRERA P52100048911

Vrinda

Completion was pushed back 4 months, to Jul 2027; no MahaRERA orders on record; 40% of its units are booked.

Aalandi, Pune 412105 · Promoter: Sapphire Developers

DeliveryExtended 4 moPromised Mar 2027 · now due Jul 2027RegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales40% booked98 of 242 units · as the promoter reported to MahaRERA

Completion was pushed back 4 months, to Jul 2027

  • This projectRegistered 24 Jan 2023, completion promised 31 Mar 2027, revised to 31 Jul 2027.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales, rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

3 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52100048911
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210004891124 Jan 202331 Mar 202731 Jul 2027Sapphire DevelopersProject page
Documents140

1 document held by Deedo, 139 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN Card6) Sapphire Developers Pan Card.pdf · uploaded 11 Jan 2023Source

Legal

  • Legal Title report1) LEGAL TITLE REPORT FOR RERA (2)_compressed (1).pdf · uploaded 11 Jan 2023Source
  • Declaration Form B8) FORM B-Developers.pdf · uploaded 11 Jan 2023Source

Migrated

  • 1 PAN Card6) Sapphire Developers Pan Card.pdf · uploaded 11 Jan 2023Source
  • 1 Copy of the legal title report1) LEGAL TITLE REPORT FOR RERA (2)_compressed (1).pdf · uploaded 11 Jan 2023Source
  • 1 a Details of encumbrances concerned to Financeilovepdf_merged (14).pdf · uploaded 11 Jan 2023Source
  • 1 b Details of encumbrances concerned to Legalilovepdf_merged (14).pdf · uploaded 11 Jan 2023Source
Show all 140 documentsShow fewer documents

Migrated

  • 1 Copy of Layout Approval (in case of layout)5) Sanctioned Plan-Part1_compressed.pdf · uploaded 11 Jan 2023Source
  • 1 Building Plan Approval / NA Order for plotted development5) Sanctioned Plan-Part2_compressed.pdf · uploaded 11 Jan 2023Source
  • 1 Commencement Certificates / NA Order for plotted development4)Commencement Certificate.pdf · uploaded 11 Jan 2023Source
  • 1 Declaration about Commencement Certificate13) Declaration Abount Commencement Certificate.pdf · uploaded 11 Jan 2023Source
  • 1 Declaration in FORM B8) FORM B-Developers.pdf · uploaded 11 Jan 2023Source
  • 1 Proforma of Allotment letter7) Allotment Letter_compressed.pdf · uploaded 11 Jan 2023Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameSeprate Bank account details.pdf · uploaded 11 Jan 2023Source
  • 1 Deviation Report with respect to model copy of AgreementDeviation to agreement for sale_compressed.pdf · uploaded 11 Jan 2023Source
  • 1 CERSAI detailsCERSAI SAPPHIRE.pdf · uploaded 12 Jan 2023Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Updated form 3_compressed.pdf · uploaded 12 Jan 2023Source
  • 1 Deviation Report with respect to Allotment letter7) Deviation to Allotment Letter.pdf · uploaded 12 Jan 2023Source
  • 1 Disclosure of Interest in Other Real Estate Organizations24) Self Declaration-Ghasnshyam Patil.pdf · uploaded 16 Jan 2023Source
  • 2 Disclosure of Interest in Other Real Estate Organizations27) Self Declaration-Vivekanand Botre.pdf · uploaded 16 Jan 2023Source
  • 3 Disclosure of Interest in Other Real Estate Organizations23) Self Declaration-Chetan Waghmare (1).pdf · uploaded 16 Jan 2023Source
  • 4 Disclosure of Interest in Other Real Estate Organizations29) Self Declaration-Shrikant Kute.pdf · uploaded 16 Jan 2023Source
  • 5 Disclosure of Interest in Other Real Estate Organizations26) Self Declaration-Swapnil Waghmare.pdf · uploaded 16 Jan 2023Source
  • 6 Disclosure of Interest in Other Real Estate Organizations28) Self Declaration-Sunil Eknath Barawkar.pdf · uploaded 16 Jan 2023Source
  • 7 Disclosure of Interest in Other Real Estate Organizations25) Self Declaration-Mansukhlal Lodha (1).pdf · uploaded 16 Jan 2023Source
  • 8 Disclosure of Interest in Other Real Estate Organizations22) Self Declaration-Anand Phulfagar.pdf · uploaded 16 Jan 2023Source
  • 1 Proforma of Agreement for sale18)Draft Agreement - Vrinda (1).pdf · uploaded 16 Jan 2023Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form1-Vrinda.pdf · uploaded 19 May 2023Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2A vrinda.pdf · uploaded 19 May 2023Source
  • 1 Disclosure of sold/ booked inventorySold Unit Details-31-03-23.pdf · uploaded 19 May 2023Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Vrinda-31-03-23-compressed.pdf · uploaded 19 May 2023Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Vrinda-31-03-23-2.pdf · uploaded 19 May 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)FORM 5 VRINDA.pdf · uploaded 19 May 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)FORM 5 VRINDA-31-03-23.pdf · uploaded 19 May 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM-1-Q1-23-24-Sapphire.pdf · uploaded 2 Aug 2023Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2A-Q1-23-24-Sapphire.pdf · uploaded 2 Aug 2023Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form3- Rera-Q1-23-24-Sapphire_compressed.pdf · uploaded 2 Aug 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 and table AB-Q2-23-24.pdf · uploaded 17 Oct 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)FORM 2A-Q2-23-24.pdf · uploaded 17 Oct 2023Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM3-Q2-23-24_compressed.pdf · uploaded 17 Oct 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)FORM 5 VRINDA.pdf · uploaded 17 Oct 2023Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2-Q2-23-24.pdf · uploaded 20 Oct 2023Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 15 Jan 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 15 Jan 2024Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 15 Jan 2024Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 15 Jan 2024Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Table A B-Q4-23-24.pdf · uploaded 17 Apr 2024Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form2-Q-23-24.pdf · uploaded 17 Apr 2024Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form3-Q4-23-24.pdf · uploaded 17 Apr 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)FORM 5 FY 23-24.pdf · uploaded 12 Aug 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1.pdf · uploaded 14 Oct 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Q2.pdf · uploaded 14 Oct 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Q1 FY 24-25.pdf · uploaded 14 Oct 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3- Q2-FY 24-25.pdf · uploaded 14 Oct 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Rera Form2.pdf · uploaded 15 Oct 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Q2 FY 24-25.pdf · uploaded 15 Oct 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Rera_form_1_Q3-24-25-Sapphire Developers.pdf · uploaded 27 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3-Q3-24-25-Sapphire Developers_compress 2.pdf · uploaded 27 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form_2_Q3.pdf · uploaded 27 Jan 2025Source
  • 1 Architect’s Certificate on Completion of Project (Form 4)Form_4_Architect's_Certificate_1 (1).pdf · uploaded 30 Jan 2025Source
  • 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentForm_4_Architect's_Certificate_1 (1).pdf · uploaded 30 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)sapphire form 1 table A B.pdf · uploaded 21 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM_3 _VRINDA_Q4 _2024-25_compressed.pdf · uploaded 21 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 21 Apr 2025Source
  • Form 3Form 3 Vrinda-31-03-23-2.pdf · uploaded 14 Jul 2025Source
  • Form 1Form1-Vrinda.pdf · uploaded 14 Jul 2025Source
  • Form 2Form 2A vrinda-1.pdf · uploaded 14 Jul 2025Source
  • Disclosure of Sold and Booked InventorySold Unit Details-31-03-23.pdf · uploaded 14 Jul 2025Source
  • Form 5 (FY 2023-2024)FORM 5 FY 23-24.pdf · uploaded 14 Jul 2025Source
  • Form 1sapphire form 1 table A B.pdf · uploaded 28 Jul 2025Source
  • Form 2Form 2.pdf · uploaded 28 Jul 2025Source
  • Form 3FORM_3 _VRINDA_Q4 _2024-25_compressed.pdf · uploaded 28 Jul 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure of sold unsold.pdf · uploaded 28 Jul 2025Source
  • Withdrawal Update Form 1Rera_form_1_Q2_25-26.pdf · uploaded 24 Dec 2025Source
  • Withdrawal Update Form 1Rera_form_1_Q2_25-26.pdf · uploaded 24 Dec 2025Source
  • Withdrawal Update Form 2RERA_form_2_Q2_25-26.pdf · uploaded 24 Dec 2025Source
  • Withdrawal Update Form 2RERA_form_2_Q2_25-26.pdf · uploaded 24 Dec 2025Source
  • Withdrawal Update Form 3RERA FORM-3-Q2-24-25.pdf · uploaded 24 Dec 2025Source
  • Withdrawal Update Form 3RERA FORM-3-Q2-24-25.pdf · uploaded 24 Dec 2025Source
  • Withdrawal Update Form 1RERA Form 1 Table A and B 3rd Quarter 25-26.pdf · uploaded 31 Mar 2026Source
  • Withdrawal Update Form 2RERA_form_2_Q2_25-26.pdf · uploaded 31 Mar 2026Source
  • Withdrawal Update Form 3RERA Form 3 Q3 2025-26.pdf · uploaded 31 Mar 2026Source
  • Withdrawal Update Form 1Rera_form1.pdf · uploaded 5 May 2026Source
  • Withdrawal Update Form 1Rera_form1.pdf · uploaded 5 May 2026Source
  • Withdrawal Update Form 2Rera_Form2.pdf · uploaded 5 May 2026Source
  • Withdrawal Update Form 2Rera_Form2.pdf · uploaded 5 May 2026Source
  • Withdrawal Update Form 3RERA Form 3 Q3 2025-26.pdf · uploaded 5 May 2026Source
  • Withdrawal Update Form 3Rera Form 3 Q4-Sapphire Developers.pdf · uploaded 5 May 2026Source
  • Withdrawal Update Form 1Form_1_Q1.pdf · uploaded 25 Aug 2026Source
  • Withdrawal Update Form 2RERA_Form_2.pdf · uploaded 25 Aug 2026Source
  • Withdrawal Update Form 3Rera form 3 2026-27.pdf · uploaded 25 Aug 2026Source
  • Form 1FORM-1-Q1-23-24-Sapphire.pdf · uploaded 28 Sep 2026Source
  • Form 2FORM 2A-Q1-23-24-Sapphire.pdf · uploaded 28 Sep 2026Source
  • Form 3Form3- Rera-Q1-23-24-Sapphire_compressed.pdf · uploaded 28 Sep 2026Source
  • Disclosure of Sold and Booked InventoryDisclosure sold unsold inventory.pdf · uploaded 28 Sep 2026Source
  • Form 1Form 1 and table AB-Q2-23-24.pdf · uploaded 28 Sep 2026Source
  • Form 2Form 2-Q2-23-24.pdf · uploaded 28 Sep 2026Source
  • Form 3FORM3-Q2-23-24_compressed.pdf · uploaded 28 Sep 2026Source
  • Disclosure of Sold and Booked InventoryDisclosure sold unsold inventory.pdf · uploaded 28 Sep 2026Source
  • Form 1Form 1.pdf · uploaded 28 Sep 2026Source
  • Form 2Form 2.pdf · uploaded 28 Sep 2026Source
  • Form 3Form 3.pdf · uploaded 28 Sep 2026Source
  • Disclosure of Sold and Booked InventoryDisclosure sold unsold inventory.pdf · uploaded 28 Sep 2026Source
  • Form 1Form 1 Table A B-Q4-23-24.pdf · uploaded 28 Sep 2026Source
  • Form 2Form2-Q-23-24.pdf · uploaded 28 Sep 2026Source
  • Form 3Form3-Q4-23-24.pdf · uploaded 28 Sep 2026Source
  • Disclosure of Sold and Booked InventoryDisclosure sold unsold inventory.pdf · uploaded 28 Sep 2026Source
  • Form 1form 1 table AB.pdf · uploaded 28 Sep 2026Source
  • Form 2Rera Form2.pdf · uploaded 28 Sep 2026Source
  • Form 3Form 3 Q1 FY 24-25.pdf · uploaded 28 Sep 2026Source
  • Disclosure of Sold and Booked InventoryDisclosure sold unsold inventory.pdf · uploaded 28 Sep 2026Source
  • Form 1Form 1 Q2.pdf · uploaded 28 Sep 2026Source
  • Form 2Form 2 Q2 FY 24-25.pdf · uploaded 28 Sep 2026Source
  • Form 3Form 3- Q2-FY 24-25.pdf · uploaded 28 Sep 2026Source
  • Disclosure of Sold and Booked InventoryDisclosure sold unsold inventory.pdf · uploaded 28 Sep 2026Source
  • Form 1Rera_form_1_Q3-24-25-Sapphire Developers.pdf · uploaded 28 Sep 2026Source
  • Form 2Form_2_Q3.pdf · uploaded 28 Sep 2026Source
  • Form 3Form 3-Q3-24-25-Sapphire Developers_compressed.pdf · uploaded 28 Sep 2026Source
  • Disclosure of Sold and Booked InventoryDisclosure sold unsold inventory.pdf · uploaded 28 Sep 2026Source
  • Form 2A (FY 2022-2023)form2A_22-23.pdf · uploaded 28 Sep 2026Source
  • Form 2A (FY 2023-2024)form_2A_23-24.pdf · uploaded 28 Sep 2026Source
  • Form 2A (FY 2024-2025)form_2A_24-25.pdf · uploaded 28 Sep 2026Source
  • Form 2A (FY 2025-2026)form_2A_25-26.pdf · uploaded 28 Sep 2026Source
  • Form 5 (FY 2022-2023)FORM 5 VRINDA.pdf · uploaded 28 Sep 2026Source
  • Form 5 (FY 2024-2025)RERA FORM 5 -24-24 -SAPPHIRE DEVELOPERS.pdf · uploaded 28 Sep 2026Source
  • Form 5 (FY 2025-2026)Form 5 2025-26.pdf · uploaded 28 Sep 2026Source
  • Occupational CertificateFULL_OC_Sapphire Developers Through Its Partener Ghanshyam Dnyaneshwar Patil.pdf · uploaded 28 Sep 2026Source

Technical

  • Document5) Sanctioned Plan-Part1_compressed.pdf · uploaded 11 Jan 2023Source
  • Document5) Sanctioned Plan-Part2_compressed.pdf · uploaded 11 Jan 2023Source

Technical (Architect)

  • Documentform 1.pdf · uploaded 14 Oct 2024Source
  • DocumentForm 1 Q2.pdf · uploaded 14 Oct 2024Source
  • DocumentRera_form_1_Q3-24-25-Sapphire Developers.pdf · uploaded 27 Jan 2025Source
  • Documentsapphire form 1 table A B.pdf · uploaded 21 Apr 2025Source
  • DocumentForm_1_Q1.pdf · uploaded 25 Aug 2026Source

Technical (Engineer)

  • DocumentRera Form2.pdf · uploaded 15 Oct 2024Source
  • DocumentForm 2 Q2 FY 24-25.pdf · uploaded 15 Oct 2024Source
  • DocumentForm_2_Q3.pdf · uploaded 27 Jan 2025Source
  • DocumentForm 2.pdf · uploaded 21 Apr 2025Source
  • DocumentRERA_Form_2.pdf · uploaded 22 Aug 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvals138/2

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Unit types
Office space, Shop, 1BHK, 2BHK, 3BHK242 units in all
Address
138/2, 138/2, Dehu Phata Chowk, Chowiswadi Taluka Haveli District Pune, AlandiPIN 412105
Village
Aalandi
Designated bank account
76
Developed in phases
Yes

Survey, CTS, gat or plot numbers

138/2

Boundaries

North
S No 129
South
136 2 Mr Bhikaji Baban Tapkir Family Propert
East
Remaining plot of remaining plot out of 101 guntha
West
Pune Alandi Road and Part of 138 1

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking242 units

98 of 242 units booked (40%), as the promoter reported to MahaRERA

Office space · 14 unitsShop · 22 units1BHK · 54 units2BHK · 150 units3BHK · 2 units
BuildingTypeCarpet areaUnitsBooked
A WingOffice space21.68 sq m · 233 sq ft43
A WingOffice space21.82 sq m · 235 sq ft21
A WingOffice space23.75 sq m · 256 sq ft11
A WingOffice space25.28 sq m · 272 sq ft11
A WingOffice space28.48 sq m · 307 sq ft11
A WingOffice space29.13 sq m · 314 sq ft10
A WingOffice space35.64 sq m · 384 sq ft20
A WingOffice space38.96 sq m · 419 sq ft11
Show all 39 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
A WingOffice space41.68 sq m · 449 sq ft11
A WingShop18.8 sq m · 202 sq ft10
A WingShop22.7 sq m · 244 sq ft10
A WingShop24.19 sq m · 260 sq ft10
A WingShop24.47 sq m · 263 sq ft11
A WingShop24.52 sq m · 264 sq ft10
A WingShop24.77 sq m · 267 sq ft10
A WingShop25.68 sq m · 276 sq ft11
A WingShop27.17 sq m · 292 sq ft11
A WingShop27.53 sq m · 296 sq ft10
A WingShop29.02 sq m · 312 sq ft11
A WingShop30.5 sq m · 328 sq ft10
A WingShop32 sq m · 344 sq ft10
A WingShop32.3 sq m · 348 sq ft11
A WingShop34.07 sq m · 367 sq ft10
A WingShop36.83 sq m · 396 sq ft10
A WingShop38.32 sq m · 412 sq ft10
A WingShop39.8 sq m · 428 sq ft11
A WingShop43.44 sq m · 468 sq ft10
A WingShop44.9 sq m · 483 sq ft10
A WingShop53.35 sq m · 574 sq ft10
A WingShop54.84 sq m · 590 sq ft10
A WingShop56.33 sq m · 606 sq ft10
B Wing1BHK39.03 sq m · 420 sq ft2610
B Wing1BHK40.08 sq m · 431 sq ft2619
B Wing2BHK53.26 sq m · 573 sq ft269
B Wing2BHK55.8 sq m · 601 sq ft4832
B Wing3BHK72.87 sq m · 784 sq ft22
C Wing1BHK44.3 sq m · 477 sq ft21
C Wing2BHK68.84 sq m · 741 sq ft748
C Wing2BHK69.78 sq m · 751 sq ft22

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals5

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectGhanshyam Dnyaneshwar Patil—
Chartered accountantKishor Mansukhlal Lodha—
Chartered accountantKumar Phulfagar—
EngineerRushikesh Govind Madane—
EngineerSuhas V Jadhav—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology