Residential / Group Housing · 2 buildingsRERA P99000026476

Mrida Homes

It is due for completion in Jun 2027, with no extension on record; no MahaRERA orders on record.

Vasai, Maharashtra 401305 · Promoter: Fin Whales Lifestyle LLP

DeliveryDue Jun 2027No extension on recordRegulatoryNo ordersNot in any MahaRERA list or order Deedo has read
Mrida Homes project report cardPDF: delivery, regulatory orders, people on record, every tower and the registered deals — for your bank or lawyerSee what's inside · from ₹1,499

It is due for completion in Jun 2027, with no extension on record

  • This projectRegistered 25 Sep 2020, completion promised 30 Jun 2027.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales, rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

2 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP99000026476
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P9900002647625 Sep 202030 Jun 202730 Jun 2027Fin Whales Lifestyle LLPProject page
Documents133

1 document held by Deedo, 132 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardPan Card Copy.pdf · uploaded 3 Sep 2020Source

Legal

  • Legal Title reportmrida title compressed.pdf · uploaded 2 Jun 2020Source
  • OtherCERTIFICATE OF INCORPORATION.pdf · uploaded 3 Sep 2020Source
  • Declaration Form BFINWAHLE-BUILDERSFORM-B_.pdf · uploaded 5 Sep 2020Source
  • OtherFORM 2A.pdf · uploaded 18 Oct 2021Source

Migrated

  • 1 Copy of Layout Approval (in case of layout)00000001-converted_compressed.pdf · uploaded 27 May 2020Source
  • 1 Copy of the legal title reportmrida title compressed.pdf · uploaded 2 Jun 2020Source
Show all 133 documentsShow fewer documents

Migrated

  • 1 Building Plan Approval / NA Order for plotted developmentmrida layout.pdf · uploaded 2 Jun 2020Source
  • 1 Details of encumbrancesNo Encubrances.pdf · uploaded 3 Jun 2020Source
  • 2 Details of encumbrancesThe property is free from encumbrances.pdf · uploaded 3 Jun 2020Source
  • 1 Commencement Certificates / NA Order for plotted developmentmrida cc_compressed.pdf · uploaded 3 Jun 2020Source
  • 1 PAN CardPan Card Copy.pdf · uploaded 3 Sep 2020Source
  • 1 OtherCERTIFICATE OF INCORPORATION.pdf · uploaded 3 Sep 2020Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER CERTIFICATE.pdf · uploaded 4 Sep 2020Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FIN WHALES_LLP_FORM 3.pdf · uploaded 4 Sep 2020Source
  • 1 Proforma of Allotment letterAllotment_Letter_FINWHALES.pdf · uploaded 4 Sep 2020Source
  • 1 Declaration in FORM BFINWAHLE-BUILDERSFORM-B_.pdf · uploaded 5 Sep 2020Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECHT-FORM-1.pdf · uploaded 21 Sep 2020Source
  • 1 Declaration about Commencement CertificateCOMMENCEMENT DECLARATION.pdf · uploaded 14 Aug 2021Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)FORM 2A 19-20 DECLARATION.pdf · uploaded 14 Aug 2021Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)form 2a 20-21.pdf · uploaded 14 Aug 2021Source
  • 1 Disclosure of sold/ booked inventorySOLD DISCLOSURE.pdf · uploaded 14 Aug 2021Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3.pdf · uploaded 14 Aug 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)FORM 5 17-18.pdf · uploaded 14 Aug 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)FORM 5 18-19.pdf · uploaded 14 Aug 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)FORM 5 19-20.pdf · uploaded 14 Aug 2021Source
  • 2 Commencement Certificates / NA Order for plotted developmentrevised cc.pdf · uploaded 18 Oct 2021Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGG CERTIFICATE-compressed.pdf · uploaded 18 Oct 2021Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3.pdf · uploaded 18 Oct 2021Source
  • 2 OtherFORM 2A.pdf · uploaded 18 Oct 2021Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERT.pdf · uploaded 19 Oct 2021Source
  • 2 Declaration about Commencement CertificateDeclaration About Commencement Certificate.pdf · uploaded 13 Nov 2021Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)FORM 2A.pdf · uploaded 13 Nov 2021Source
  • 2 Disclosure of sold/ booked inventoryDisclosure of Sold -Booking Inventory-compressed_compressed.pdf · uploaded 13 Nov 2021Source
  • 3 Declaration about Commencement CertificateCOMMENCEMENT DECLARATION.pdf · uploaded 22 Dec 2021Source
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)FORM 2A.pdf · uploaded 22 Dec 2021Source
  • 3 Disclosure of sold/ booked inventorySOLD UNSOLD DECLARATION.pdf · uploaded 22 Dec 2021Source
  • 1 CERSAI detailsCERSAI DECLARATION.pdf · uploaded 7 Jan 2022Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT-compressed.pdf · uploaded 17 Feb 2022Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate q3.pdf · uploaded 17 Feb 2022Source
  • 4 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Fin whales Lifestyle dec 2021.pdf · uploaded 17 Feb 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)FORM 5 FINWHALES.pdf · uploaded 21 Feb 2022Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)architect cert-compressed.pdf · uploaded 11 Jun 2022Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)engg cert_compressed.pdf · uploaded 11 Jun 2022Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)finwhales lifestyle form -2A_compressed.pdf · uploaded 11 Jun 2022Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT_compressed.pdf · uploaded 8 Aug 2022Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGG_compressed.pdf · uploaded 8 Aug 2022Source
  • 5 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)2A_compressed.pdf · uploaded 8 Aug 2022Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECH CERT.pdf · uploaded 28 Oct 2022Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGG CERTIFICATE_compressed.pdf · uploaded 28 Oct 2022Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 29 Apr 2023Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2A.pdf · uploaded 29 Apr 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)FORM 2A.pdf · uploaded 29 Apr 2023Source
  • 3 a Details of encumbrances concerned to Financelegal encumbrance.pdf · uploaded 19 May 2023Source
  • 1 b Details of encumbrances concerned to Legallegal encumbrance.pdf · uploaded 19 May 2023Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameformat A bank accont.pdf · uploaded 19 May 2023Source
  • 1 Deviation Report with respect to Allotment letterno devaition.pdf · uploaded 19 May 2023Source
  • 1 Deviation Report with respect to model copy of Agreementno devaition.pdf · uploaded 19 May 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)FORM 2A.pdf · uploaded 29 Jun 2023Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3.pdf · uploaded 29 Jun 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)form 5 21-22.pdf · uploaded 29 Jun 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)form 5 finwhales.pdf · uploaded 28 Sep 2023Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 12 Oct 2023Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2.pdf · uploaded 12 Oct 2023Source
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1.pdf · uploaded 20 Jan 2024Source
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2.pdf · uploaded 20 Jan 2024Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3.pdf · uploaded 9 Feb 2024Source
  • 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1.pdf · uploaded 25 Apr 2024Source
  • 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2.pdf · uploaded 25 Apr 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2A.pdf · uploaded 7 May 2024Source
  • 2 Copy of Layout Approval (in case of layout)1_compressed.pdf · uploaded 1 Jul 2024Source
  • 2 Building Plan Approval / NA Order for plotted development2_compressed.pdf · uploaded 1 Jul 2024Source
  • 3 Building Plan Approval / NA Order for plotted development3_compressed.pdf · uploaded 1 Jul 2024Source
  • 4 Building Plan Approval / NA Order for plotted development4 kunti_new1_compressed.pdf · uploaded 1 Jul 2024Source
  • 5 Building Plan Approval / NA Order for plotted development5 kunti_new2_compressed.pdf · uploaded 1 Jul 2024Source
  • 3 Commencement Certificates / NA Order for plotted developmentFirst CC building no 1.pdf · uploaded 1 Jul 2024Source
  • 4 Commencement Certificates / NA Order for plotted developmentSecond CC building no 1.pdf · uploaded 1 Jul 2024Source
  • 5 Commencement Certificates / NA Order for plotted developmentthird CC building no 2_compressed.pdf · uploaded 1 Jul 2024Source
  • 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 1 Jul 2024Source
  • 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 1 Jul 2024Source
  • 1 Disclosure for secured/unsecured finance availed for the projectdisclosure of interest.pdf · uploaded 1 Jul 2024Source
  • 2 Disclosure for secured/unsecured finance availed for the projectdisclosure of interest 2.pdf · uploaded 1 Jul 2024Source
  • 3 Disclosure for secured/unsecured finance availed for the projectdisclosure of interest 2.pdf · uploaded 1 Jul 2024Source
  • 4 Disclosure of sold/ booked inventorySOLD UNSOLD.pdf · uploaded 1 Jul 2024Source
  • 1 Disclosure of Interest in Other Real Estate Organizationsdisclosure of interest.pdf · uploaded 1 Jul 2024Source
  • 5 Disclosure of sold/ booked inventorysold unsold.pdf · uploaded 2 Jul 2024Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3_compressed.pdf · uploaded 2 Jul 2024Source
  • 3 Copy of Layout Approval (in case of layout)5692 rdp sht_compressed (2)-1_rotated (1)_compressed.pdf · uploaded 7 Jul 2024Source
  • 6 Building Plan Approval / NA Order for plotted development5692 rdp sht_compressed (3)-2_compressed.pdf · uploaded 7 Jul 2024Source
  • 7 Building Plan Approval / NA Order for plotted development5692 rdp sht_compressed (3)-3_compressed.pdf · uploaded 7 Jul 2024Source
  • 8 Building Plan Approval / NA Order for plotted development5692 rdp sht_compressed (3)-4_compressed.pdf · uploaded 7 Jul 2024Source
  • Form 1FORM 1 .pdf · uploaded 26 Sep 2024Source
  • Form 2FORM 2 .pdf · uploaded 26 Sep 2024Source
  • Form 3FORM 3.pdf · uploaded 26 Sep 2024Source
  • Disclosure of Sold and Booked InventorySOLD UNSOLD.pdf · uploaded 26 Sep 2024Source
  • Form 5 (FY 2023-2024)Form 5 (FY 2023-2024) · uploaded 1 Oct 2024Source
  • 1 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 13 Oct 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)form 5 23-24 sgned.pdf · uploaded 15 Oct 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)KUNTI FORM 1.pdf · uploaded 16 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2.pdf · uploaded 16 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 18 Apr 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2A.pdf · uploaded 18 Apr 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)FORM 2.pdf · uploaded 13 May 2025Source
  • Form 5 (FY 2024-2025)Form 5 Fy24-25.pdf · uploaded 26 Sep 2025Source
  • Form 1form 1.pdf · uploaded 31 Dec 2025Source
  • Form 2form 2.pdf · uploaded 31 Dec 2025Source
  • Form 3form 3.pdf · uploaded 31 Dec 2025Source
  • Disclosure of Sold and Booked Inventorysold unsold.pdf · uploaded 31 Dec 2025Source
  • Form 1form 1.pdf · uploaded 31 Dec 2025Source
  • Form 2form 2.pdf · uploaded 31 Dec 2025Source
  • Form 3form 3.pdf · uploaded 31 Dec 2025Source
  • Disclosure of Sold and Booked Inventorysold unsold.pdf · uploaded 31 Dec 2025Source
  • Form 1form 1.pdf · uploaded 31 Dec 2025Source
  • Form 2form 2.pdf · uploaded 31 Dec 2025Source
  • Form 3form 3.pdf · uploaded 31 Dec 2025Source
  • Disclosure of Sold and Booked Inventorysold unsold.pdf · uploaded 31 Dec 2025Source

Technical

  • Document00000001-converted_compressed.pdf · uploaded 27 May 2020Source
  • Documentmrida layout.pdf · uploaded 2 Jun 2020Source
  • Document1_compressed.pdf · uploaded 1 Jul 2024Source
  • Document2_compressed.pdf · uploaded 1 Jul 2024Source
  • Document3_compressed.pdf · uploaded 1 Jul 2024Source
  • Document4 kunti_new1_compressed.pdf · uploaded 1 Jul 2024Source
  • Document5 kunti_new2_compressed.pdf · uploaded 1 Jul 2024Source
  • Document5692 rdp sht_compressed (2)-1_rotated (1)_compressed.pdf · uploaded 7 Jul 2024Source
  • Document5692 rdp sht_compressed (3)-2_compressed.pdf · uploaded 7 Jul 2024Source
  • Document5692 rdp sht_compressed (3)-3_compressed.pdf · uploaded 7 Jul 2024Source
  • Document5692 rdp sht_compressed (3)-4_compressed.pdf · uploaded 7 Jul 2024Source

Technical (Architect)

  • Document913d27df-c99e-483b-bc76-8b012e5b8455.pdf · uploaded 21 Sep 2024Source
  • DocumentKUNTI FORM 1.pdf · uploaded 16 Jan 2025Source
  • DocumentFORM 1.pdf · uploaded 18 Apr 2025Source

Technical (Engineer)

  • DocumentFORM 2 NEW.pdf · uploaded 21 Sep 2024Source
  • Documentform 2.pdf · uploaded 16 Jan 2025Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvals231 HNO. 2, 7

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Address
231 Hno. 2, 7, 8, 9, 10, Near Narangi Railway Phatak, Virar EastPIN 401305
Designated bank account
76
Developed in phases
Yes

Survey, CTS, gat or plot numbers

231 HNO. 278

Boundaries

North
Shivcharan Building
South
Sno 231 Hno 3
East
Kashi Apartment
West
D P Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals6

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectUmesh Kekre Kekre—
Chartered accountantRaveena Vivek Sankhala—
Chartered accountantSankhala And Co—
EngineerJay Shree Krishna—
OtherChoice Infra Construction Private Limited—
OtherJayantibhai Patel—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology