Alpine
Deedo IDDP-NSK-5T45Completion was pushed back 4 months, to Jul 2028; no MahaRERA orders on record; 43% of its units are booked.
Nashik 422003 · Promoter: Pushprit Realty
Completion was pushed back 4 months, to Jul 2028
- This projectRegistered 27 Jun 2023, completion promised 31 Mar 2028, revised to 31 Jul 2028.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
4 buildings
Open a building to see every flat, floor by floor.
- Building A7 floors · 66 units85% booked
- Building B7 floors · 56 units39% booked
- Building C7 floors · 36 units0% booked
- Building D6 floors · 24 units0% booked
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP51600051628
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51600051628 | 27 Jun 2023 | 31 Mar 2028 | 31 Jul 2028 | Pushprit Realty | Project page |
Documents231
1 document held by Deedo, 230 filings listed on MahaRERA's project page
Finance
- PAN CardPushprit_Pancard.pdf · uploaded 11 May 2023Source
- OthersPurchase Deed 1- Page No 1 to 19_11zon.pdf · uploaded 2 Jan 2026Source
- OthersPurchase Deed 1 - Page No 20 to 38_11zon.pdf · uploaded 2 Jan 2026Source
- OthersPurchase Deed 2- Page No 1 to 19.pdf · uploaded 2 Jan 2026Source
- OthersPurchase Deed 2- Page No 20 to 39.pdf · uploaded 2 Jan 2026Source
- OthersPurchase Deed - 3 Page No 1 to 24.pdf · uploaded 2 Jan 2026Source
- OthersPurchase deed 3 - Page NO 25 to 48.pdf · uploaded 2 Jan 2026Source
Show all 231 documentsShow fewer documents
Legal
- Legal Title reportLegal Title Search final-4-11.pdf · uploaded 11 May 2023Source
- Declaration Form Bform B.pdf · uploaded 12 May 2023Source
- OthersDeclaration Of Encumbrances Concerned To Legal.pdf · uploaded 1 Sep 2025Source
- Declaration Form B712 204.pdf · uploaded 1 Sep 2025Source
- Declaration Form BLegal Title.pdf · uploaded 3 Nov 2025Source
- Declaration Form Bform B.pdf · uploaded 3 Nov 2025Source
- OthersPurchase Deed 1- Page No 1 to 19_11zon.pdf · uploaded 2 Jan 2026Source
- OthersPurchase Deed 1 - Page No 20 to 38_11zon.pdf · uploaded 2 Jan 2026Source
- OthersPurchase Deed 2- Page No 1 to 19.pdf · uploaded 2 Jan 2026Source
- OthersPurchase Deed 2- Page No 20 to 39.pdf · uploaded 2 Jan 2026Source
- OthersPurchase Deed - 3 Page No 1 to 24.pdf · uploaded 2 Jan 2026Source
- OthersPurchase deed 3 - Page NO 25 to 48.pdf · uploaded 2 Jan 2026Source
Migrated
- 1 PAN CardPushprit_Pancard.pdf · uploaded 11 May 2023Source
- 1 Copy of the legal title reportLegal Title Search final-4-11.pdf · uploaded 11 May 2023Source
- 1 a Details of encumbrances concerned to FinanceDeclaration Of Encumbrances Concerned To Finance.pdf · uploaded 12 May 2023Source
- 2 a Details of encumbrances concerned to FinanceDeclaration Of Encumbrances Concerned To Legal.pdf · uploaded 12 May 2023Source
- 1 b Details of encumbrances concerned to LegalDeclaration Of Encumbrances Concerned To Finance.pdf · uploaded 12 May 2023Source
- 2 b Details of encumbrances concerned to LegalDeclaration Of Encumbrances Concerned To Legal.pdf · uploaded 12 May 2023Source
- 1 Copy of Layout Approval (in case of layout)Building Plan 4 NEW.pdf · uploaded 12 May 2023Source
- 2 Copy of Layout Approval (in case of layout)Building Plan NEW.pdf · uploaded 12 May 2023Source
- 3 Copy of Layout Approval (in case of layout)Building Plan 3 NEW.pdf · uploaded 12 May 2023Source
- 4 Copy of Layout Approval (in case of layout)Building Plan 2 NEW.pdf · uploaded 12 May 2023Source
- 5 Copy of Layout Approval (in case of layout)Building Plan 1 NEW.pdf · uploaded 12 May 2023Source
- 1 Building Plan Approval / NA Order for plotted developmentBuilding Plan 4 NEW.pdf · uploaded 12 May 2023Source
- 2 Building Plan Approval / NA Order for plotted developmentBuilding Plan NEW.pdf · uploaded 12 May 2023Source
- 3 Building Plan Approval / NA Order for plotted developmentBuilding Plan 3 NEW.pdf · uploaded 12 May 2023Source
- 4 Building Plan Approval / NA Order for plotted developmentBuilding Plan 2 NEW.pdf · uploaded 12 May 2023Source
- 5 Building Plan Approval / NA Order for plotted developmentBuilding Plan 1 NEW.pdf · uploaded 12 May 2023Source
- 1 Commencement Certificates / NA Order for plotted developmentAlpine_NMC Commencement Certificate.pdf · uploaded 12 May 2023Source
- 1 Declaration about Commencement CertificateDeclaration About Commencement Certificate.pdf · uploaded 12 May 2023Source
- 1 Declaration in FORM Bform B.pdf · uploaded 12 May 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Form 1.pdf · uploaded 12 May 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Form 2 Final.pdf · uploaded 12 May 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsDisclosure Of Interest in Other Estate Organization Pushkar.pdf · uploaded 12 May 2023Source
- 2 Disclosure of Interest in Other Real Estate OrganizationsDisclosure Of INterest in Other Estate Organization-Pritam Jain.pdf · uploaded 12 May 2023Source
- 3 Disclosure of Interest in Other Real Estate OrganizationsDisclosure Of INterest in Other Estate Organization-Rahul Burad.pdf · uploaded 12 May 2023Source
- 4 Disclosure of Interest in Other Real Estate OrganizationsDisclosure Of Interest in Other Estate Organization-Ashish Bora.pdf · uploaded 12 May 2023Source
- 1 Proforma of Agreement for saleAGREEMENT ALPINE- final.pdf · uploaded 12 May 2023Source
- 1 Proforma of Allotment letterallotment-alpine Final.pdf · uploaded 12 May 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameSperate Bank Details.pdf · uploaded 12 May 2023Source
- 1 Deviation Report with respect to Allotment letterDeclaration Of No Deviation In Model Copy Of Allotment Letter.pdf · uploaded 12 May 2023Source
- 1 Deviation Report with respect to model copy of AgreementDeclaration Of No Deviation In Model Copy Of Agreement.pdf · uploaded 12 May 2023Source
- 1 CERSAI detailsCERSAI_Search_Report_200268506916_For_Asset_Based_Search_12_05_2023_15_25_17_502.pdf · uploaded 13 May 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 (4)_compressed.pdf · uploaded 15 May 2023Source
- 2 CERSAI detailsCersai Declaration NEW.pdf · uploaded 30 May 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Rera Archi Cert.pdf · uploaded 7 Sep 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer stage 1.pdf · uploaded 7 Sep 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form -3 Alpine I- JUN 23 WTH SIN.pdf · uploaded 7 Sep 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1.pdf · uploaded 30 Oct 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 - Engineer's Certificate Q2 23.pdf · uploaded 30 Oct 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form -3 Alpine I - SEP 23.pdf · uploaded 30 Oct 2023Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate Form 2 Q3 23-24.pdf · uploaded 25 Jan 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form -3 Alpine I - Dec 23.pdf · uploaded 25 Jan 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Rera Archi Cert - Pushprit Jan 2024.pdf · uploaded 26 Jan 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form -3 Alpine I March 24 Signed_11zon.pdf · uploaded 8 May 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 13 May 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2A.pdf · uploaded 21 May 2024Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 20 Jul 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2_compressed.pdf · uploaded 20 Jul 2024Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form -3 Alpine I JUNE 24 final_compressed.pdf · uploaded 20 Jul 2024Source
- Form 5 (FY 2023-2024)FORM 5 FINAL.pdf · uploaded 28 Sep 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)FORM 5 FINAL.pdf · uploaded 7 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)FORM 5 FINAL.pdf · uploaded 7 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)FORM 5 FINAL.pdf · uploaded 7 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 10 Oct 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 - Engineer's Certificate.pdf · uploaded 10 Oct 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form -3 Alpine I - SEP 24.pdf · uploaded 10 Oct 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentREVISED APPROVED PLAN 2024.pdf · uploaded 10 Oct 2024Source
- 1 Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT CERTIFICATE REVISED.pdf · uploaded 10 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 10 Oct 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 - Engineer's Certificate.pdf · uploaded 10 Oct 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form -3 Alpine I - SEP 24.pdf · uploaded 10 Oct 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentREVISED APPROVED PLAN 2024.pdf · uploaded 10 Oct 2024Source
- 1 Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT CERTIFICATE REVISED.pdf · uploaded 10 Oct 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 10 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form -3 Alpine I - SEP 24.pdf · uploaded 10 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 - Engineer's Certificate.pdf · uploaded 10 Oct 2024Source
- 1 Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT CERTIFICATE REVISED.pdf · uploaded 10 Oct 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentREVISED APPROVED PLAN 2024.pdf · uploaded 10 Oct 2024Source
- 1 Copy of Layout Approval (in case of layout)REVISED APPROVED PLAN 2024-1 and 2.pdf · uploaded 16 Oct 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentREVISED APPROVED PLAN 2024-3.pdf · uploaded 16 Oct 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentREVISED APPROVED PLAN 2024-1 and 2.pdf · uploaded 16 Oct 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentREVISED APPROVED PLAN 2024-4.pdf · uploaded 16 Oct 2024Source
- 1 Copy of Layout Approval (in case of layout)REVISED APPROVED PLAN 2024-3.pdf · uploaded 16 Oct 2024Source
- 1 Copy of Layout Approval (in case of layout)REVISED APPROVED PLAN 2024-4.pdf · uploaded 16 Oct 2024Source
- 1 Copy of Layout Approval (in case of layout)REVISED APPROVED PLAN 2024-1 and 2.pdf · uploaded 16 Oct 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentREVISED APPROVED PLAN 2024-3.pdf · uploaded 16 Oct 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentREVISED APPROVED PLAN 2024-1 and 2.pdf · uploaded 16 Oct 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentREVISED APPROVED PLAN 2024-4.pdf · uploaded 16 Oct 2024Source
- 1 Copy of Layout Approval (in case of layout)REVISED APPROVED PLAN 2024-3.pdf · uploaded 16 Oct 2024Source
- 1 Copy of Layout Approval (in case of layout)REVISED APPROVED PLAN 2024-4.pdf · uploaded 16 Oct 2024Source
- 2 Copy of Layout Approval (in case of layout)REVISED APPROVED PLAN 2024-3.pdf · uploaded 16 Oct 2024Source
- 3 Copy of Layout Approval (in case of layout)REVISED APPROVED PLAN 2024-4.pdf · uploaded 16 Oct 2024Source
- 1 Copy of Layout Approval (in case of layout)REVISED APPROVED PLAN 2024-1 and 2.pdf · uploaded 16 Oct 2024Source
- 2 Building Plan Approval / NA Order for plotted developmentREVISED APPROVED PLAN 2024-3.pdf · uploaded 16 Oct 2024Source
- 3 Building Plan Approval / NA Order for plotted developmentREVISED APPROVED PLAN 2024-1 and 2.pdf · uploaded 16 Oct 2024Source
- 4 Building Plan Approval / NA Order for plotted developmentREVISED APPROVED PLAN 2024-4.pdf · uploaded 16 Oct 2024Source
- 1 Declaration about Commencement CertificateForm D - Declaration Commencement - for CC.pdf · uploaded 17 Oct 2024Source
- 1 Declaration about Commencement CertificateForm D - Declaration Commencement - for CC.pdf · uploaded 17 Oct 2024Source
- 1 Declaration about Commencement CertificateForm D - Declaration Commencement - for CC.pdf · uploaded 17 Oct 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentPlan Highlighed Area As per call disc pushprit 271124-3.pdf · uploaded 27 Nov 2024Source
- 1 Copy of Layout Approval (in case of layout)Plan Highlighed Area As per call disc pushprit 271124-3.pdf · uploaded 27 Nov 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentPlan Highlighed Area As per call disc pushprit 271124-3.pdf · uploaded 27 Nov 2024Source
- 1 Copy of Layout Approval (in case of layout)Plan Highlighed Area As per call disc pushprit 271124-3.pdf · uploaded 27 Nov 2024Source
- 4 Copy of Layout Approval (in case of layout)Plan Highlighed Area As per call disc pushprit 271124-3.pdf · uploaded 27 Nov 2024Source
- 5 Building Plan Approval / NA Order for plotted developmentPlan Highlighed Area As per call disc pushprit 271124-3.pdf · uploaded 27 Nov 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form -3 Alpine I - DEC 24.pdf · uploaded 28 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1.pdf · uploaded 28 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate.pdf · uploaded 28 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form -3 Alpine I - DEC 24.pdf · uploaded 28 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1.pdf · uploaded 28 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate.pdf · uploaded 28 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1.pdf · uploaded 28 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form -3 Alpine I - DEC 24.pdf · uploaded 28 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate.pdf · uploaded 28 Jan 2025Source
- 1 Copy of Layout Approval (in case of layout)Pushprit Realty NMC Drawing -1.pdf · uploaded 21 Apr 2025Source
- 2 Copy of Layout Approval (in case of layout)Pushprit Realty NMC Drawing -2.pdf · uploaded 21 Apr 2025Source
- 3 Copy of Layout Approval (in case of layout)Pushprit Realty NMC Drawing -3.pdf · uploaded 21 Apr 2025Source
- 4 Copy of Layout Approval (in case of layout)Pushprit Realty NMC Drawing -4.pdf · uploaded 21 Apr 2025Source
- 5 Copy of Layout Approval (in case of layout)Pushprit Realty NMC Drawing -5.pdf · uploaded 21 Apr 2025Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement ABC Wings.pdf · uploaded 21 Apr 2025Source
- 1 Building Plan Approval / NA Order for plotted developmentPushprit Realty NMC Drawing -1.pdf · uploaded 21 Apr 2025Source
- 2 Building Plan Approval / NA Order for plotted developmentPushprit Realty NMC Drawing -2.pdf · uploaded 21 Apr 2025Source
- 3 Building Plan Approval / NA Order for plotted developmentPushprit Realty NMC Drawing -3.pdf · uploaded 21 Apr 2025Source
- 4 Building Plan Approval / NA Order for plotted developmentPushprit Realty NMC Drawing -4.pdf · uploaded 21 Apr 2025Source
- 5 Building Plan Approval / NA Order for plotted developmentPushprit Realty NMC Drawing -5.pdf · uploaded 21 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3.pdf · uploaded 25 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 25 Apr 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 March 2025.pdf · uploaded 30 Apr 2025Source
- Form 1Form 1 March 2025.pdf · uploaded 30 Jun 2025Source
- Form 2FORM 2.pdf · uploaded 30 Jun 2025Source
- Form 3FORM 3.pdf · uploaded 30 Jun 2025Source
- Disclosure of Sold and Booked InventorySold unsold disclosure.pdf · uploaded 30 Jun 2025Source
- Form 2A (FY 2024-2025)Form 2A.pdf · uploaded 8 Jul 2025Source
- Form 5 (FY 2024-2025)Form 5.pdf · uploaded 26 Sep 2025Source
- Withdrawal Update Form 1form 1.pdf · uploaded 7 Oct 2025Source
- Withdrawal Update Form 2form 2.pdf · uploaded 7 Oct 2025Source
- Withdrawal Update Form 3Form 3.pdf · uploaded 7 Oct 2025Source
- Withdrawal Update Form 1Form1 FINAL.pdf · uploaded 17 Oct 2025Source
- Withdrawal Update Form 2Form2 FINAL.pdf · uploaded 17 Oct 2025Source
- Withdrawal Update Form 3final singed ca.pdf · uploaded 17 Oct 2025Source
- Withdrawal Update Form 1Form 1.pdf · uploaded 8 Apr 2026Source
- Withdrawal Update Form 2Form 2.pdf · uploaded 8 Apr 2026Source
- Withdrawal Update Form 3Form 3.pdf · uploaded 8 Apr 2026Source
- Withdrawal Update Form 1Form 1.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 2Form 2.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 3Form 3_compressed.pdf · uploaded 20 Apr 2026Source
- Form 2A (FY 2025-2026)Form 2A Final.pdf · uploaded 29 Jun 2026Source
- Withdrawal Update Form 1Form 1.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 2Form 2.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 3Form 3 uploaded.pdf · uploaded 20 Jul 2026Source
- Form 5 (FY 2025-2026)Form 5 Final signed.pdf · uploaded 11 Sep 2026Source
Technical
- DocumentBuilding Plan 4 NEW.pdf · uploaded 12 May 2023Source
- DocumentBuilding Plan NEW.pdf · uploaded 12 May 2023Source
- DocumentBuilding Plan 3 NEW.pdf · uploaded 12 May 2023Source
- DocumentBuilding Plan 2 NEW.pdf · uploaded 12 May 2023Source
- DocumentBuilding Plan 1 NEW.pdf · uploaded 12 May 2023Source
- DocumentBuilding Plan 4 NEW.pdf · uploaded 12 May 2023Source
- DocumentBuilding Plan NEW.pdf · uploaded 12 May 2023Source
- DocumentBuilding Plan 3 NEW.pdf · uploaded 12 May 2023Source
- DocumentBuilding Plan 2 NEW.pdf · uploaded 12 May 2023Source
- DocumentBuilding Plan 1 NEW.pdf · uploaded 12 May 2023Source
- DocumentREVISED APPROVED PLAN 2024.pdf · uploaded 10 Oct 2024Source
- DocumentREVISED APPROVED PLAN 2024.pdf · uploaded 10 Oct 2024Source
- DocumentREVISED APPROVED PLAN 2024.pdf · uploaded 10 Oct 2024Source
- DocumentREVISED APPROVED PLAN 2024-1 and 2.pdf · uploaded 16 Oct 2024Source
- DocumentREVISED APPROVED PLAN 2024-3.pdf · uploaded 16 Oct 2024Source
- DocumentREVISED APPROVED PLAN 2024-4.pdf · uploaded 16 Oct 2024Source
- DocumentREVISED APPROVED PLAN 2024-1 and 2.pdf · uploaded 16 Oct 2024Source
- DocumentREVISED APPROVED PLAN 2024-3.pdf · uploaded 16 Oct 2024Source
- DocumentREVISED APPROVED PLAN 2024-4.pdf · uploaded 16 Oct 2024Source
- DocumentREVISED APPROVED PLAN 2024-1 and 2.pdf · uploaded 16 Oct 2024Source
- DocumentREVISED APPROVED PLAN 2024-3.pdf · uploaded 16 Oct 2024Source
- DocumentREVISED APPROVED PLAN 2024-4.pdf · uploaded 16 Oct 2024Source
- DocumentREVISED APPROVED PLAN 2024-3.pdf · uploaded 16 Oct 2024Source
- DocumentREVISED APPROVED PLAN 2024-1 and 2.pdf · uploaded 16 Oct 2024Source
- DocumentREVISED APPROVED PLAN 2024-4.pdf · uploaded 16 Oct 2024Source
- DocumentREVISED APPROVED PLAN 2024-3.pdf · uploaded 16 Oct 2024Source
- DocumentREVISED APPROVED PLAN 2024-1 and 2.pdf · uploaded 16 Oct 2024Source
- DocumentREVISED APPROVED PLAN 2024-4.pdf · uploaded 16 Oct 2024Source
- DocumentREVISED APPROVED PLAN 2024-3.pdf · uploaded 16 Oct 2024Source
- DocumentREVISED APPROVED PLAN 2024-1 and 2.pdf · uploaded 16 Oct 2024Source
- DocumentREVISED APPROVED PLAN 2024-4.pdf · uploaded 16 Oct 2024Source
- DocumentPlan Highlighed Area As per call disc pushprit 271124-3.pdf · uploaded 27 Nov 2024Source
- DocumentPlan Highlighed Area As per call disc pushprit 271124-3.pdf · uploaded 27 Nov 2024Source
- DocumentPlan Highlighed Area As per call disc pushprit 271124-3.pdf · uploaded 27 Nov 2024Source
- DocumentPlan Highlighed Area As per call disc pushprit 271124-3.pdf · uploaded 27 Nov 2024Source
- DocumentPlan Highlighed Area As per call disc pushprit 271124-3.pdf · uploaded 27 Nov 2024Source
- DocumentPlan Highlighed Area As per call disc pushprit 271124-3.pdf · uploaded 27 Nov 2024Source
- DocumentPushprit Realty NMC Drawing -1.pdf · uploaded 21 Apr 2025Source
- DocumentPushprit Realty NMC Drawing -2.pdf · uploaded 21 Apr 2025Source
- DocumentPushprit Realty NMC Drawing -3.pdf · uploaded 21 Apr 2025Source
- DocumentPushprit Realty NMC Drawing -4.pdf · uploaded 21 Apr 2025Source
- DocumentPushprit Realty NMC Drawing -5.pdf · uploaded 21 Apr 2025Source
- DocumentPushprit Realty NMC Drawing -1.pdf · uploaded 21 Apr 2025Source
- DocumentPushprit Realty NMC Drawing -2.pdf · uploaded 21 Apr 2025Source
- DocumentPushprit Realty NMC Drawing -3.pdf · uploaded 21 Apr 2025Source
- DocumentPushprit Realty NMC Drawing -4.pdf · uploaded 21 Apr 2025Source
- DocumentPushprit Realty NMC Drawing -5.pdf · uploaded 21 Apr 2025Source
- OthersSold Unsold Disclose Sept 2025.pdf · uploaded 7 Nov 2025Source
- OthersSold Unsold Disclose June 2025.pdf · uploaded 7 Nov 2025Source
- OthersPurchase Deed 1- Page No 1 to 19_11zon.pdf · uploaded 2 Jan 2026Source
- OthersPurchase Deed 1 - Page No 20 to 38_11zon.pdf · uploaded 2 Jan 2026Source
- OthersPurchase Deed 2- Page No 1 to 19.pdf · uploaded 2 Jan 2026Source
- OthersPurchase Deed 2- Page No 20 to 39.pdf · uploaded 2 Jan 2026Source
- OthersPurchase Deed - 3 Page No 1 to 24.pdf · uploaded 2 Jan 2026Source
- OthersPurchase deed 3 - Page NO 25 to 48.pdf · uploaded 2 Jan 2026Source
Technical (Architect)
- DocumentForm 1.pdf · uploaded 10 Oct 2024Source
- DocumentForm 1.pdf · uploaded 10 Oct 2024Source
- DocumentForm 1.pdf · uploaded 10 Oct 2024Source
- Documentform 1.pdf · uploaded 28 Jan 2025Source
- Documentform 1.pdf · uploaded 28 Jan 2025Source
- Documentform 1.pdf · uploaded 28 Jan 2025Source
- DocumentForm 1 March 2025.pdf · uploaded 30 Apr 2025Source
- DocumentForm 1.pdf · uploaded 20 Jul 2026Source
Technical (Engineer)
- DocumentFORM 2 - Engineer's Certificate.pdf · uploaded 10 Oct 2024Source
- DocumentFORM 2 - Engineer's Certificate.pdf · uploaded 10 Oct 2024Source
- DocumentFORM 2 - Engineer's Certificate.pdf · uploaded 10 Oct 2024Source
- DocumentEngineer Certificate.pdf · uploaded 28 Jan 2025Source
- DocumentEngineer Certificate.pdf · uploaded 28 Jan 2025Source
- DocumentEngineer Certificate.pdf · uploaded 28 Jan 2025Source
- DocumentFORM 2.pdf · uploaded 25 Apr 2025Source
- DocumentForm 2.pdf · uploaded 20 Jul 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsS NO 204/1/1D/1/204/1/1D/2/3
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Unit types
- 2BHK, 3BHK, Shop182 units in all
- Address
- S No 204/1/1d/1+204/1/1d/2/3, Hirawadi Road Panchavati, PanchavatiPIN 422003
- Village
- Nashik, Nashik taluka
- Location
- 20.00955, 73.79188
- Designated bank account
- 76
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Boundaries
- North
- S No 204 Part
- South
- Road
- East
- 9 Mtrs Colony Road
- West
- S No 204-1-1d-1
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking182 units
78 of 182 units booked (43%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Building A | 2BHK | 56.49 sq m · 608 sq ft | 6 | 6 |
| Building A | 2BHK | 59.41 sq m · 639 sq ft | 24 | 20 |
| Building A | 2BHK | 62.1 sq m · 668 sq ft | 6 | 6 |
| Building A | 3BHK | 78.36 sq m · 843 sq ft | 10 | 9 |
| Building A | 3BHK | 78.41 sq m · 844 sq ft | 1 | 1 |
| Building A | 3BHK | 78.98 sq m · 850 sq ft | 1 | 1 |
| Building A | Shop | 19.03 sq m · 205 sq ft | 1 | 0 |
| Building A | Shop | 19.14 sq m · 206 sq ft | 1 | 1 |
Show all 50 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Building A | Shop | 19.36 sq m · 208 sq ft | 1 | 1 |
| Building A | Shop | 20.6 sq m · 222 sq ft | 1 | 1 |
| Building A | Shop | 20.87 sq m · 225 sq ft | 1 | 1 |
| Building A | Shop | 21.21 sq m · 228 sq ft | 1 | 1 |
| Building A | Shop | 22 sq m · 237 sq ft | 1 | 1 |
| Building A | Shop | 22.36 sq m · 241 sq ft | 1 | 1 |
| Building A | Shop | 23.22 sq m · 250 sq ft | 1 | 1 |
| Building A | Shop | 23.41 sq m · 252 sq ft | 1 | 1 |
| Building A | Shop | 24.75 sq m · 266 sq ft | 2 | 2 |
| Building A | Shop | 26.84 sq m · 289 sq ft | 1 | 0 |
| Building A | Shop | 27.5 sq m · 296 sq ft | 1 | 1 |
| Building A | Shop | 27.96 sq m · 301 sq ft | 1 | 0 |
| Building A | Shop | 28.47 sq m · 306 sq ft | 1 | 0 |
| Building A | Shop | 31.45 sq m · 339 sq ft | 1 | 0 |
| Building A | Shop | 41.58 sq m · 448 sq ft | 1 | 1 |
| Building B | 2BHK | 49.37 sq m · 531 sq ft | 24 | 6 |
| Building B | 2BHK | 62.95 sq m · 678 sq ft | 6 | 5 |
| Building B | 2BHK | 63.47 sq m · 683 sq ft | 6 | 3 |
| Building B | 3BHK | 84.11 sq m · 905 sq ft | 6 | 1 |
| Building B | 3BHK | 86.02 sq m · 926 sq ft | 6 | 6 |
| Building B | Shop | 21.29 sq m · 229 sq ft | 1 | 0 |
| Building B | Shop | 21.67 sq m · 233 sq ft | 2 | 1 |
| Building B | Shop | 22.05 sq m · 237 sq ft | 1 | 0 |
| Building B | Shop | 23.05 sq m · 248 sq ft | 1 | 0 |
| Building B | Shop | 26.64 sq m · 287 sq ft | 1 | 0 |
| Building B | Shop | 26.87 sq m · 289 sq ft | 1 | 0 |
| Building B | Shop | 36.19 sq m · 390 sq ft | 1 | 0 |
| Building C | 2BHK | 62.3 sq m · 671 sq ft | 12 | 0 |
| Building C | 3BHK | 83.86 sq m · 903 sq ft | 6 | 0 |
| Building C | 3BHK | 89.73 sq m · 966 sq ft | 6 | 0 |
| Building C | Shop | 21.75 sq m · 234 sq ft | 1 | 0 |
| Building C | Shop | 21.78 sq m · 234 sq ft | 1 | 0 |
| Building C | Shop | 21.94 sq m · 236 sq ft | 1 | 0 |
| Building C | Shop | 22.18 sq m · 239 sq ft | 1 | 0 |
| Building C | Shop | 22.81 sq m · 246 sq ft | 2 | 0 |
| Building C | Shop | 23.5 sq m · 253 sq ft | 1 | 0 |
| Building C | Shop | 23.56 sq m · 254 sq ft | 1 | 0 |
| Building C | Shop | 23.7 sq m · 255 sq ft | 3 | 0 |
| Building C | Shop | 39.89 sq m · 429 sq ft | 1 | 0 |
| Building D | 2BHK | 62.3 sq m · 671 sq ft | 12 | 0 |
| Building D | 3BHK | 83.86 sq m · 903 sq ft | 6 | 0 |
| Building D | 3BHK | 89.73 sq m · 966 sq ft | 6 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals7
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Sumit Kumath | — |
| Chartered accountant | Akshay Picha | — |
| Chartered accountant | Anuj Ashwin Bafna | — |
| Chartered accountant | CA Sanket Shantilal Shah | — |
| Engineer | Ajay Sambhaji Tapase | — |
| Engineer | Bhagyashree Prakash Girme | — |
| Engineer | Shubham Sanjay Patil | — |
Source: MahaRERA project page. Contact details are not shown.