The Metrozone Aspen C3

Completed

Nashik (M Corp.), Nashik 422009 |Promoter: Sanklecha Construction Private Limited

Residential / Group HousingRERAP51600007130
17 Aug 2017Registered with MahaRERA
30 Jun 2018Promised completion
31 Oct 2022Revised completionPushed back 4 years and 4 months
1Building
24Units registered
1MahaRERA listings and orders

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Unit types
3BHK24 units in all
Land area for this project
2,153 sq m (23,171 sq ft)
Permissible built-up area
2,153 sq m (23,171 sq ft)
Sanctioned built-up area
2,153 sq m (23,171 sq ft)
Address
Survey No 7/1 to 5 and 8/1 to 5PIN 422009
Designated bank account
State Bank Of India
Litigation declared by promoter
Yes
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.96937, 73.75532
The Metrozone Aspen C3 is at latitude 19.96937, longitude 73.75532.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 4 years and 4 months

The latest completion date on record passed 4 years ago.

Registered
17 Aug 2017
Promised
30 Jun 2018
Revised
31 Oct 2022

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5160000713017 Aug 201730 Jun 201831 Oct 2022Sanklecha Construction Private LimitedProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Aspen C31424

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

24 units registered

3BHK · 24 units
TypeCarpet areaUnits
3BHK118.22 sq m · 1,273 sq ft22
3BHK123.44 sq m · 1,329 sq ft2

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered000019
Open Space00005

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Aspen C3

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsCompleted Before Possession100%
  • Water SupplyCompleted Before Possession100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Completed Before Possession100%
  • Storm Water DrainsCompleted Before Possession100%
  • Landscaping & Tree PlantingCompleted Before Possession100%
  • Street LightingCompleted Before Possession100%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterCompleted Before Possession100%
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingCompleted Before Possession100%
  • Energy managemcntCompleted Before Possession100%
  • Fire protection and fire safety requirementsCompleted Before Possession100%
  • Electrical meter room, sub-station, receiving stationCompleted Before Possession100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingCompleted Before Possession100%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

26 documents held by Deedo, 27 filings listed on MahaRERA's project page

Others

Registration certificate

Extension certificate

Document library

  • Copy of the legal title reportSEARCH REPORT TMZ-ilovepdf-compressed (1).pdf · uploaded 27 Jul 2017View
  • Details of encumbrancesEncumbrances MZ.pdf · uploaded 27 Jul 2017View
  • Copy of Layout Approval (in case of layout)Metrozone layout-ilovepdf-compressed.pdf · uploaded 27 Jul 2017View
  • Proforma of Allotment letterAgreement - Uploadable Metrozone - C3.pdf · uploaded 27 Jul 2017View
  • Declaration in FORM BTMZ SCPL aspen c-3-ilovepdf-compressed.pdf · uploaded 27 Jul 2017View
  • Proforma of Allotment letterLetter of Allotment.pdf · uploaded 27 Jul 2017View
  • Building Plan Approval (IOD)Building C3.pdf · uploaded 27 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)C3.pdf · uploaded 29 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Aspen C3-1 to 3.pdf · uploaded 30 Jul 2017View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)C3 18-19.pdf · uploaded 28 Jan 2020View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)C3 1718.pdf · uploaded 28 Jan 2020View
  • Commencement Certificates / NA Order for plotted development1 CC_compressed.pdf · uploaded 31 Jul 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)C319.pdf · uploaded 31 Jul 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)C320.pdf · uploaded 31 Jul 2021View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)C31920.pdf · uploaded 31 Jul 2021View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)C32021.pdf · uploaded 31 Jul 2021View
  • Declaration about Commencement Certificatec3.pdf · uploaded 2 Aug 2021View
  • Disclosure of sold/ booked inventoryC3ID.pdf · uploaded 2 Aug 2021View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOC TMZ.pdf · uploaded 21 Feb 2022View
  • Architect’s Certificate on Completion of Project (Form 4)C3 f4.pdf · uploaded 1 Mar 2022View
  • Status of Formation of Legal Entity (Society/Co Op etc.)1 Status of Conveyance.pdf · uploaded 20 Sep 2022View
  • Status of Conveyance1 Status of Conveyance.pdf · uploaded 20 Sep 2022View

Promoter documents

  • Legal Title reportSEARCH REPORT TMZ-ilovepdf-compressed (1).pdf · uploaded 27 Jul 2017View
  • Declaration Form BTMZ SCPL aspen c-3-ilovepdf-compressed.pdf · uploaded 27 Jul 2017View

Technical documents

  • Layout ApprovalMetrozone layout-ilovepdf-compressed.pdfView
  • Building Plan ApprovalBuilding C3.pdfView

Proforma allotment letter

  • Proforma allotment letterLetter of Allotment.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

What MahaRERA has published about this project. A listing records what the authority published; it is not a judgment of the project.

  • Suo motu order1 Jan 2020Matched by RERA number

    Suo motu order: Secretary, MahaRERA Versus Sanklecha Construction Private Limited (Suo Motu Case No. 41 of 2020) dated 01st January 2020

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nashik (M Corp.), Nashik taluka

Survey, CTS, gat or plot numbers

8/1 to 5Survey No 7/1 to 5

As published on MahaRERA's project page

Survey No 7/1 to 5 and 8/1 to 5

Boundaries

North
Internal Road and Open Space
South
Internal Road
East
Internal Road and Parking
West
Building C2

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectG V Katale & Assocites—

Source: MahaRERA project page. Contact details are not shown.

Data through11 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project page · MahaRERA regulatory lists and ordersData through is when MahaRERA's project page was last read.Methodology