Panchami Residency

Completed

Nashik (M Corp.), Nashik 422010 |Promoter: S K Buildcon

Residential / Group HousingRERAP51600018928
17 Dec 2018Registered with MahaRERA
30 Dec 2022Promised completion
1Building
16Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Unit types
1BHK16 units in all
Land area for this project
376 sq m (4,047 sq ft)
Permissible built-up area
572 sq m (6,162 sq ft)
Sanctioned built-up area
572 sq m (6,162 sq ft)
Address
Plot 5, S No 297/1b Pathardi Shivar, Nashik, Near Sales Tax Office, Opp Water Tank, PathardiPIN 422010
Designated bank account
Saraswat Cooperative Bank Limited
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.94715, 73.75906
Panchami Residency is at latitude 19.94715, longitude 73.75906.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Dec 2022

The latest completion date on record passed 3 years and 10 months ago.

Registered
17 Dec 2018
Promised
30 Dec 2022

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5160001892817 Dec 201830 Dec 2022—S K BuildconProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Panchami Residency616

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

16 units registered

1BHK · 16 units
TypeCarpet areaUnits
1BHK32.46 sq m · 349 sq ft8
1BHK33.07 sq m · 356 sq ft8

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered000023
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Panchami Residency

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water Supply100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)CHAMBER100%
  • Storm Water DrainsSEPTIC TANKNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalLINESNot applicable
  • Water conservation /Rain water harvesting100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationELECTRIC BOX BELOW STAIRCASE100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

26 documents held by Deedo, 28 filings listed on MahaRERA's project page

Title report

Encumbrance details

Commencement certificate

Form B

Form 2A (2)

Form 1 (2)

Show all 54 documentsShow fewer documents

Form 2 (2)

Occupancy / completion certificate

  • Occupancy / completion certificate5 May 2020ViewSource

Form 4

Other (9)

Form 5

Registration certificate

Layout plan

Building plan

Allotment letter

Document library

  • Declaration in FORM BForm B.pdf · uploaded 13 Dec 2018View
  • Details of encumbrancesNo Litigation and No encumbrance.pdf · uploaded 13 Dec 2018View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1.pdf · uploaded 13 Dec 2018View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2.pdf · uploaded 13 Dec 2018View
  • Copy of the legal title reportTitle Search.pdf · uploaded 13 Dec 2018View
  • Commencement Certificates / NA Order for plotted developmentcommencement certificate.pdf · uploaded 13 Dec 2018View
  • Building Plan Approval (IOD)Approved Building Plan.pdf · uploaded 13 Dec 2018View
  • Proforma of Allotment letterDeclaration For Allotment Letter and Agreement.pdf · uploaded 13 Dec 2018View
  • Copy of Layout Approval (in case of layout)Approved Plot Layout.pdf · uploaded 13 Dec 2018View
  • Form 2A2A ENG CERTIFICATE QUALITY ASSURANCE.pdf · uploaded 12 Jan 2019View
  • Form 2AFOR 2A- UPDATION 30 JUNE 2019.pdf · uploaded 20 Jul 2019View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2.pdf · uploaded 8 Feb 2020View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1.pdf · uploaded 8 Feb 2020View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2.pdf · uploaded 8 Feb 2020View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOCCUPANCY CERTIFICATE.pdf · uploaded 5 May 2020View
  • Architect’s Certificate on Completion of Project (Form 4)Form 4.pdf · uploaded 6 May 2020View
  • Status of Formation of Legal Entity (Society/Co Op etc.)SOCIETY FORMATION.pdf · uploaded 6 May 2020View
  • Status of Formation of Legal Entity (Society/Co Op etc.)SOCIETY FORMATION1.pdf · uploaded 6 May 2020View
  • Status of Formation of Legal Entity (Society/Co Op etc.)SOCIETY FORMATION2.pdf · uploaded 6 May 2020View
  • Status of Formation of Legal Entity (Society/Co Op etc.)SOCEITY FORMATION3.pdf · uploaded 6 May 2020View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form - 1_compressed.pdf · uploaded 10 Sep 2020View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form - 2_compressed.pdf · uploaded 10 Sep 2020View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)form 5.pdf · uploaded 10 Sep 2020View

Promoter documents

  • Declaration Form BForm B.pdf · uploaded 13 Dec 2018View
  • Legal Title reportTitle Search.pdf · uploaded 13 Dec 2018View

Technical documents

  • Building Plan ApprovalApproved Building Plan.pdfView
  • Layout ApprovalApproved Plot Layout.pdfView

Proforma allotment letter

  • Proforma allotment letterDeclaration For Allotment Letter and Agreement.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nashik (M Corp.), Nashik taluka

Survey, CTS, gat or plot numbers

5PLOT 5S NO 297/1B PATHARDI SHIVAR

As published on MahaRERA's project page

PLOT 5 , S NO 297/1B PATHARDI SHIVAR , NASHIK

Boundaries

North
12 Mt Road
South
Survey No 298
East
Plot No 6
West
Plot No 4

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectVijaykumar Kisan Sanap—
Chartered accountantSandeep Chavanke—
EngineerAnil Kadbhane—
OtherBhausaheb Ramnath Awari—
OtherDeepak Hiraman Bacchav—
OtherDevendra Shivajibhai Chabaiya—
OtherRamesh Pandit—

Source: MahaRERA project page. Contact details are not shown.

Data through11 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology