16Buildings2 phases
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
RERA registrations
2
Phases
2
Buildings
16
Land area for this project
2,736 sq m (29,453 sq ft)
Permissible built-up area
2,469 sq m (26,579 sq ft)
Sanctioned built-up area
2,469 sq m (26,579 sq ft)
Address
Gut No 228 Village Kauthatq And Dist Nanded, Off Road No 10 Behind Rambagh Residency, KauthaPIN 431603
Designated bank account
Tjsb Sahakari Bank Ltd
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.13758, 77.29912
Gvc Shagun City is at latitude 19.13758, longitude 77.29912.

Also registered as

Gvc Shagun City Phase IIGvc Shagun City Phase III

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Dec 2022

P51100017950

The latest completion date on record passed 3 years and 10 months ago.

Registered
28 Sep 2018
Promised
30 Dec 2022

Completion promised for 30 Jun 2024

P51100026123

The latest completion date on record passed 2 years and 4 months ago.

Registered
20 Aug 2020
Promised
30 Jun 2024

2 RERA registrations

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5110001795028 Sep 201830 Dec 2022—Shagun AssociatesProject page
P5110002612320 Aug 202030 Jun 2024—Shagun AssociatesProject page

16 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
A-12—
A-22—
A-32—
A-42—
A-402—
A-52—
L-12—
L-102—
L-22—
L-32—
L-42—
L-52—
L-62—
L-72—
L-82—
L-92—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
A-1Closed/Covered00000
A-1Open Space00001
A-2Closed/Covered00000
A-2Open Space00001
A-3Closed/Covered00000
A-3Open Space00001
A-4Closed/Covered00000
A-4Open Space00001
A-40Closed/Covered00000
A-40Open Space00001
A-5Closed/Covered00000
A-5Open Space00001
L-1Closed/Covered00000
L-1Open Space00001
L-10Closed/Covered00000
L-10Open Space00001
L-2Closed/Covered00000
L-2Open Space00001
L-3Closed/Covered00000
L-3Open Space00001
L-4Closed/Covered00000
L-4Open Space00001
L-5Closed/Covered00000
L-5Open Space00001
L-6Closed/Covered00000
L-6Open Space00001
L-7Closed/Covered00000
L-7Open Space00001
L-8Closed/Covered00000
L-8Open Space00001
L-9Closed/Covered00000
L-9Open Space00001

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

A-1

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

A-2

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

A-3

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

A-4

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

A-40

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

A-5

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

L-1

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

L-10

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

L-2

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

L-3

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

L-4

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

L-5

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

L-6

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

L-7

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

L-8

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

L-9

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsALL WEATHER ROADS100%
  • Water SupplyNWCMC WATER SUPPLY100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)NWCMC DRAINAGE SYSTEM100%
  • Storm Water DrainsRCC DRAINS100%
  • Landscaping & Tree PlantingLANDSCAPING IN OPEN SPACE100%
  • Street LightingON ROADS100%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingNot applicable
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

32 documents held by Deedo, 36 filings listed on MahaRERA's project page

Others

Registration certificates

  • Registration certificateP51100026123 · 8 Sep 2021ViewSource
  • Registration certificateP51100017950 · 9 Sep 2021ViewSource

Document library

  • Details of encumbrancesP51100017950 · legal.pdf · uploaded 22 Sep 2018View
  • Declaration in FORM BP51100017950 · form b.pdf · uploaded 22 Sep 2018View
  • Copy of the legal title reportP51100017950 · legal.pdf · uploaded 22 Sep 2018View
  • Proforma of Allotment letterP51100017950 · agreement.pdf · uploaded 22 Sep 2018View
  • Copy of Layout Approval (in case of layout)P51100017950 · layout.pdf · uploaded 22 Sep 2018View
  • Building Plan Approval (IOD)P51100017950 · TYPE A.pdf · uploaded 22 Sep 2018View
  • Commencement Certificates / NA Order for plotted developmentP51100017950 · COVER PAGE 1.pdf · uploaded 22 Sep 2018View
  • Building Plan Approval (IOD)P51100017950 · TYPE L 01.pdf · uploaded 22 Sep 2018View
  • Building Plan Approval (IOD)P51100017950 · TYPE L 02.pdf · uploaded 22 Sep 2018View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentP51100017950 · TYPE L OC COVER LETTER.pdf · uploaded 29 May 2021View
  • Status of Formation of Legal Entity (Society/Co Op etc.)P51100017950 · Shagun City Cooperative society certificate.pdf · uploaded 22 Feb 2023View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentP51100017950 · OC COVER LETTER A 1 TO 5.pdf · uploaded 17 Apr 2023View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentP51100017950 · A 40 OC_compressed.pdf · uploaded 17 Apr 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)P51100017950 · FORM 1 SHAGUN 2 2018-19.pdf · uploaded 19 Apr 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)P51100017950 · FORM 1 SHAGUN 2 2019-20.pdf · uploaded 19 Apr 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)P51100017950 · FORM 1 SHAGUN 2 2020-21.pdf · uploaded 19 Apr 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)P51100017950 · FORM 1 SHAGUN 2 2021-22.pdf · uploaded 19 Apr 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)P51100017950 · FORM 2 SHAGUN 2 2018-19.pdf · uploaded 22 Apr 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)P51100017950 · FORM 2 SHAGUN 2 2019-20.pdf · uploaded 22 Apr 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)P51100017950 · FORM 2 SHAGUN 2 2020-21.pdf · uploaded 22 Apr 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)P51100017950 · FORM 2 SHAGUN 2 2021-22.pdf · uploaded 22 Apr 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)P51100017950 · SHAGUN 2 FORM 3 2018-19.pdf · uploaded 22 Apr 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)P51100017950 · SHAGUN 2 FORM 5 2018-19.pdf · uploaded 22 Apr 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)P51100017950 · SHAGUN 2 FORM 5 2019-20.pdf · uploaded 22 Apr 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P51100017950 · SHAGUN 2 FORM 5 2020-21.pdf · uploaded 22 Apr 2023View
  • Architect’s Certificate on Completion of Project (Form 4)P51100017950 · FORM 4 SHAGUN 2.pdf · uploaded 9 May 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P51100017950 · FORM 2A SHAGUN 2 2019-20.pdf · uploaded 10 May 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P51100017950 · FORM 2A SHAGUN 2 2020-21.pdf · uploaded 10 May 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)P51100017950 · FORM 2A SHAGUN 2 2021-22.pdf · uploaded 10 May 2023View

Promoter documents

  • Declaration Form BP51100017950 · form b.pdf · uploaded 22 Sep 2018View
  • Legal Title reportP51100017950 · legal.pdf · uploaded 22 Sep 2018View

Technical documents

  • Layout ApprovalP51100017950 · layout.pdfView
  • Building Plan ApprovalP51100017950 · TYPE A.pdfView
  • Building Plan ApprovalP51100017950 · TYPE L 01.pdfView
  • Building Plan ApprovalP51100017950 · TYPE L 02.pdfView

Proforma allotment letter

  • Proforma allotment letterP51100017950 · agreement.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nanded Waghala (M Corp.), Nanded taluka

Survey, CTS, gat or plot numbers

GUT NO 228

As published on MahaRERA's project page

GUT NO 228 VILLAGE KAUTHATQ AND DIST NANDED

Boundaries

North
Gut No 228 Land Of Shivaji Kale And Others
South
Gut No 228 Land Of K Sontakke And Others
East
Land Gut No 108
West
Land Gut No 174

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.RERA
ArchitectSourabh Shirish Karandikar—P51100017950
ArchitectSourabh Shirish Karandikar—P51100017950
ArchitectSourabh Shirish Karandikar—P51100017950
ArchitectSourabh Shirish Karandikar—P51100017950
EngineerSandesh Chavgonda Patil—P51100017950
EngineerSandesh Chavgonda Patil—P51100017950
EngineerSandesh Chavgonda Patil—P51100017950
EngineerSandesh Chavgonda Patil—P51100017950

Source: MahaRERA project page. Contact details are not shown.

Data through10 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology