Gokuldham City Part A
ActiveNanded Waghala (M Corp.), Nanded 431602 |Promoter: Rama Developers
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Active
- Buildings
- 35
- Land area for this project
- 4,189 sq m (45,093 sq ft)
- Permissible built-up area
- 3,356 sq m (36,126 sq ft)
- Sanctioned built-up area
- 3,356 sq m (36,121 sq ft)
- Recreational open space
- 1,277 sq m (13,741 sq ft)
- Planning authority
- Nnaded Waghala City Muncipalty
- Address
- Gut No 4, Kautha, Near Ravi NagarPIN 431602
- Designated bank account
- Union Bank Of India
- Litigation declared by promoter
- None declared
- Financial encumbrance declared
- None declared
Location
Coordinates as published by MahaRERA
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion promised for 30 Dec 2030
- Registered
- 18 Apr 2019
- Promised
- 30 Dec 2030
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51100020534 | 18 Apr 2019 | 30 Dec 2030 | — | Rama Developers | Project page |
35 buildings
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| Row House An 1 | 2 | — |
| Row House Bn 2 | 2 | — |
| Row House Bn 3 | 2 | — |
| Row House Bn 4 | 2 | — |
| Row House Bn 5 | 2 | — |
| Row House Cw 6 | 2 | — |
| Row House Dw 10 | 2 | — |
| Row House Dw 11 | 2 | — |
Show all 35 buildingsShow fewer buildings
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
0 units registered
Parking
| Building | Type | Two-wheeler | Four-wheeler | Bus | Visitor | Total |
|---|---|---|---|---|---|---|
| Row House An 1 | Closed/Covered | 0 | 1 | 0 | 0 | 1 |
| Row House An 1 | Open Space | 0 | 0 | 0 | 0 | 0 |
| Row House Bn 2 | Closed/Covered | 0 | 1 | 0 | 0 | 1 |
| Row House Bn 2 | Open Space | 0 | 0 | 0 | 0 | 0 |
| Row House Bn 3 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| Row House Bn 3 | Open Space | 0 | 0 | 0 | 0 | 0 |
| Row House Bn 4 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| Row House Bn 4 | Open Space | 0 | 0 | 0 | 0 | 0 |
Show all 70 parking rowsShow fewer parking rows
| Building | Type | Two-wheeler | Four-wheeler | Bus | Visitor | Total |
|---|---|---|---|---|---|---|
| Row House Bn 5 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| Row House Bn 5 | Open Space | 0 | 0 | 0 | 0 | 0 |
| Row House Cw 6 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| Row House Cw 6 | Open Space | 0 | 0 | 0 | 0 | 0 |
| Row House Dw 10 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| Row House Dw 10 | Open Space | 0 | 0 | 0 | 0 | 0 |
| Row House Dw 11 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| Row House Dw 11 | Open Space | 0 | 0 | 0 | 0 | 0 |
| Row House Dw 12 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| Row House Dw 12 | Open Space | 0 | 0 | 0 | 0 | 0 |
| Row House Dw 13 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| Row House Dw 13 | Open Space | 0 | 0 | 0 | 0 | 0 |
| Row House Dw 7 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| Row House Dw 7 | Open Space | 0 | 0 | 0 | 0 | 0 |
| Row House Dw 8 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| Row House Dw 8 | Open Space | 0 | 0 | 0 | 0 | 0 |
| Row House Dw 9 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| Row House Dw 9 | Open Space | 0 | 0 | 0 | 0 | 0 |
| Row House Ew 14 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| Row House Ew 14 | Open Space | 0 | 0 | 0 | 0 | 0 |
| Row House Fw 15 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| Row House Fw 15 | Open Space | 0 | 0 | 0 | 0 | 0 |
| Row House Ge 34 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| Row House Ge 34 | Open Space | 0 | 0 | 0 | 0 | 0 |
| Row House He 35 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| Row House He 35 | Open Space | 0 | 0 | 0 | 0 | 0 |
| Row House Ie 36 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| Row House Ie 36 | Open Space | 0 | 0 | 0 | 0 | 0 |
| Row House Ie 37 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| Row House Ie 37 | Open Space | 0 | 0 | 0 | 0 | 0 |
| Row House Ie 38 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| Row House Ie 38 | Open Space | 0 | 0 | 0 | 0 | 0 |
| Row House Ie 39 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| Row House Ie 39 | Open Space | 0 | 0 | 0 | 0 | 0 |
| Row House Ie 40 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| Row House Ie 40 | Open Space | 0 | 0 | 0 | 0 | 0 |
| Row House Ie 41 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| Row House Ie 41 | Open Space | 0 | 1 | 0 | 0 | 1 |
| Row House Ie 42 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| Row House Ie 42 | Open Space | 0 | 0 | 0 | 0 | 0 |
| Row House Je 43 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| Row House Je 43 | Open Space | 0 | 0 | 0 | 0 | 0 |
| Row House Kw 44 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| Row House Kw 44 | Open Space | 0 | 0 | 0 | 0 | 0 |
| Row House Lw 45 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| Row House Lw 45 | Open Space | 0 | 0 | 0 | 0 | 0 |
| Row House Lw 46 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| Row House Lw 46 | Open Space | 0 | 0 | 0 | 0 | 0 |
| Row House Lw 47 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| Row House Lw 47 | Open Space | 0 | 0 | 0 | 0 | 0 |
| Row House Lw 48 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| Row House Lw 48 | Open Space | 0 | 0 | 0 | 0 | 0 |
| Row House Mw 49 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| Row House Mw 49 | Open Space | 0 | 0 | 0 | 0 | 0 |
| Row House Mw 50 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| Row House Mw 50 | Open Space | 0 | 0 | 0 | 0 | 1 |
| Row House Mw 51 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| Row House Mw 51 | Open Space | 0 | 0 | 0 | 0 | 0 |
| Row House Nw 52 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| Row House Nw 52 | Open Space | 0 | 0 | 0 | 0 | 0 |
| Row House Ow 53 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| Row House Ow 53 | Open Space | 0 | 0 | 0 | 0 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Construction progress
Work completed, as the promoter reported it to MahaRERA (Form 1)
Row House An 1
Show all 11 activitiesShow fewer activities
Row House Bn 2
Show all 11 activitiesShow fewer activities
Row House Bn 3
Show all 11 activitiesShow fewer activities
Show all 36 buildings and common areasShow fewer buildings and common areas
Row House Bn 4
Show all 11 activitiesShow fewer activities
Row House Bn 5
Show all 11 activitiesShow fewer activities
Row House Cw 6
Show all 11 activitiesShow fewer activities
Row House Dw 10
Show all 11 activitiesShow fewer activities
Row House Dw 11
Show all 11 activitiesShow fewer activities
Row House Dw 12
Show all 11 activitiesShow fewer activities
Row House Dw 13
Show all 11 activitiesShow fewer activities
Row House Dw 7
Show all 11 activitiesShow fewer activities
Row House Dw 8
Show all 11 activitiesShow fewer activities
Row House Dw 9
Show all 11 activitiesShow fewer activities
Row House Ew 14
Show all 11 activitiesShow fewer activities
Row House Fw 15
Show all 11 activitiesShow fewer activities
Row House Ge 34
Show all 11 activitiesShow fewer activities
Row House He 35
Show all 11 activitiesShow fewer activities
Row House Ie 36
Show all 11 activitiesShow fewer activities
Row House Ie 37
Show all 11 activitiesShow fewer activities
Row House Ie 38
Show all 11 activitiesShow fewer activities
Row House Ie 39
Show all 11 activitiesShow fewer activities
Row House Ie 40
Show all 11 activitiesShow fewer activities
Row House Ie 41
Show all 11 activitiesShow fewer activities
Row House Ie 42
Show all 11 activitiesShow fewer activities
Row House Je 43
Show all 11 activitiesShow fewer activities
Row House Kw 44
Show all 11 activitiesShow fewer activities
Row House Lw 45
Show all 11 activitiesShow fewer activities
Row House Lw 46
Show all 11 activitiesShow fewer activities
Row House Lw 47
Show all 11 activitiesShow fewer activities
Row House Lw 48
Show all 11 activitiesShow fewer activities
Row House Mw 49
Show all 11 activitiesShow fewer activities
Row House Mw 50
Show all 11 activitiesShow fewer activities
Row House Mw 51
Show all 11 activitiesShow fewer activities
Row House Nw 52
Show all 11 activitiesShow fewer activities
Row House Ow 53
Show all 11 activitiesShow fewer activities
Common areas and amenities
Show all 15 activitiesShow fewer activities
Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.
Documents
52 documents held by Deedo, 58 filings listed on MahaRERA's project page
Show all 110 documentsShow fewer documents
Form 1 (11)
- Form 110 Feb 2023ViewSource
- Form 118 Feb 2023ViewSource
- Form 119 May 2023ViewSource
- Form 122 Jul 2023ViewSource
- Form 128 Apr 2024ViewSource
- Form 114 Jun 2024ViewSource
- Form 13 Aug 2024ViewSource
- Form 116 Dec 2024ViewSource
- Form 116 Dec 2024ViewSource
- Form 118 Jul 2025ViewSource
- Form 118 Jul 2025ViewSource
Form 2 (11)
- Form 210 Feb 2023ViewSource
- Form 219 May 2023ViewSource
- Form 222 Jul 2023ViewSource
- Form 228 Apr 2024ViewSource
- Form 228 Apr 2024ViewSource
- Form 214 Jun 2024ViewSource
- Form 23 Aug 2024ViewSource
- Form 23 Aug 2024ViewSource
- Form 216 Dec 2024ViewSource
- Form 218 Jul 2025ViewSource
- Form 218 Jul 2025ViewSource
Form 2A (8)
Other (6)
Building plan (3)
Document library
- Declaration in FORM BForm B.pdf · uploaded 9 Apr 2019View
- Details of encumbrancesDeclaration.pdf · uploaded 9 Apr 2019View
- Commencement Certificates / NA Order for plotted developmentBild Permission.pdf · uploaded 9 Apr 2019View
- Certificates of CA (Form 5)CA Certificate.pdf · uploaded 9 Apr 2019View
- Building Plan Approval (IOD)3-3.pdf · uploaded 9 Apr 2019View
- Copy of Layout Approval (in case of layout)lay out map.pdf · uploaded 9 Apr 2019View
- Building Plan Approval (IOD)2-3.pdf · uploaded 9 Apr 2019View
- Building Plan Approval (IOD)1-3.pdf · uploaded 9 Apr 2019View
- Proforma of Allotment letterविक्री करारनामा.pdf · uploaded 11 Apr 2019View
- Copy of the legal title reportKautha Search Report.pdf · uploaded 12 Apr 2019View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)Gokuldham City Part A , Form 1.pdf · uploaded 10 Feb 2023View
- Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Gokuldham City Part A , Form 2A.pdf · uploaded 10 Feb 2023View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)Gokuldham City Part A Engg.pdf · uploaded 10 Feb 2023View
- Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5 2020-21.pdf · uploaded 10 Feb 2023View
- Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 2021-22.pdf · uploaded 10 Feb 2023View
- Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Form 5 2019-20.pdf · uploaded 10 Feb 2023View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)Gokuldham_City_Form_-_1_Architect;s_Certificate[1].pdf · uploaded 18 Feb 2023View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGG CIRTIFICATE PART-A.pdf · uploaded 19 May 2023View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CIRTIFICATE PART-A.pdf · uploaded 19 May 2023View
- Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)FORM 2A PART-A.pdf · uploaded 19 May 2023View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1 Certificate Gokuldham City A.pdf · uploaded 22 Jul 2023View
- Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form - 2A - Engineer's Certificate (Quality Assurance) Q4 Part-A.pdf · uploaded 22 Jul 2023View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer cetificate Q1 Part A 23-24.pdf · uploaded 22 Jul 2023View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1 Certificate Gokuldham City A Q2 23-24.pdf · uploaded 28 Apr 2024View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)Egineer cetificate Q2 Part A 23-24.pdf · uploaded 28 Apr 2024View
- Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form - 2A - Engineer's Certificate (Quality Assurance) Q2 A.pdf · uploaded 28 Apr 2024View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1 Certificate Gokuldham City A Q2 23-24.pdf · uploaded 28 Apr 2024View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)Egineer cetificate Q3 Part A 23-24.pdf · uploaded 28 Apr 2024View
- Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form - 2A - Engineer's Certificate (Quality Assurance) Q3 A.pdf · uploaded 28 Apr 2024View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1 Certificate Gokuldham City A Q3 23-24.pdf · uploaded 12 Jun 2024View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects Certificate Part A Q4-23-24.pdf · uploaded 14 Jun 2024View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate Q4 23-24.pdf · uploaded 14 Jun 2024View
- Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form - 2A - Engineer's Certificate (Quality Assurance) Gokuldham City A Q4 23-24.pdf · uploaded 18 Jun 2024View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architects Certificate Par A.pdf · uploaded 3 Aug 2024View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2A Part A.pdf · uploaded 3 Aug 2024View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate Par A.pdf · uploaded 3 Aug 2024View
- Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A Part A.pdf · uploaded 3 Aug 2024View
- Declaration about all RERA Designated Bank Accounts (Format A)Gokuldham City Part A Format A.pdf · uploaded 13 Nov 2024View
- Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)Gokuldham City Part A Format B (3).pdf · uploaded 13 Nov 2024View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1 Certificate Gokuldham City B Q2.pdf · uploaded 16 Dec 2024View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1 Certificate Gokuldham City A Q2 FY 24-25.pdf · uploaded 16 Dec 2024View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer cetificate Q2 Part A 24-25.pdf · uploaded 16 Dec 2024View
- Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)form 5 part FY 22 23.pdf · uploaded 16 Dec 2024View
- Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 23 24.pdf · uploaded 16 Dec 2024View
- Declaration about all RERA Designated Bank Accounts (Format A)format A Part A.pdf · uploaded 16 Dec 2024View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1 Certificate Gokuldham City A Q4 FY 24-25.pdf · uploaded 18 Jul 2025View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer cetificate Q4 Part A 24-25.pdf · uploaded 18 Jul 2025View
- Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form - 2A - Engineer's Certificate (Quality Assurance) Gokuldham City A Q4 24-25.pdf · uploaded 18 Jul 2025View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1 Certificate Gokuldham City A Q1 FY 25-26.pdf · uploaded 18 Jul 2025View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer cetificate Q1 Part A 25-26.pdf · uploaded 18 Jul 2025View
- Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form - 2A - Engineer's Certificate (Quality Assurance) Gokuldham City A Q1 25-26.pdf · uploaded 18 Jul 2025View
Promoter documents
Technical documents
Proforma allotment letter
- Proforma allotment letterविक्री करारनामा.pdfView
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Nanded Waghala (M Corp.), Nanded taluka
Survey, CTS, gat or plot numbers
As published on MahaRERA's project page
GUT NO 4
Boundaries
- North
- Remaining Part Of Gut No 4 Lay Out
- South
- Gut No 12
- East
- Gut No 05 Lay Out
- West
- Over Bridge
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Shirish Purohit | — |
| Chartered accountant | Shailesh Partani | — |
| Engineer | Chaitanya Farkande | — |
Source: MahaRERA project page. Contact details are not shown.