Pyramid City 6

Completed

Pipla, Nagpur 440037 |Promoter: Pyramid Ashok Megastructures Pvt.Ltd

Residential / Group HousingRERAP50500004036
7 Aug 2017Registered with MahaRERA
30 Dec 2022Promised completion
6Buildings
256Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
6
Unit types
Row House, 2 BHK, Shop, 3 BHK256 units in all
Land area for this project
21,200 sq m (2,28,195 sq ft)
Permissible built-up area
23,157 sq m (2,49,260 sq ft)
Sanctioned built-up area
13,922 sq m (1,49,855 sq ft)
Recreational open space
2,086 sq m (22,453 sq ft)
Address
P.H No - 38PIN 440037
Designated bank account
State Bank Of India
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 21.08323, 79.10683
Pyramid City 6 is at latitude 21.08323, longitude 79.10683.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Dec 2022

The latest completion date on record passed 3 years and 10 months ago.

Registered
7 Aug 2017
Promised
30 Dec 2022

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P505000040367 Aug 201730 Dec 2022—Pyramid Ashok Megastructures Pvt.LtdProject page

6 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Block A27
Block B214
Block C310
Tower A and B1076
Tower C D1061
Tower E1388

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

256 units registered

Row House · 31 units2 BHK · 150 unitsShop · 14 units3 BHK · 61 units
BuildingTypeCarpet areaUnits
Block ARow House908.72 sq m · 9,781 sq ft7
Block BRow House932.16 sq m · 10,034 sq ft10
Block BRow House1,009.56 sq m · 10,867 sq ft4
Block CRow House126.36 sq m · 1,360 sq ft6
Block CRow House130.14 sq m · 1,401 sq ft2
Block CRow House136.76 sq m · 1,472 sq ft2
Tower A and B2 BHK70.1 sq m · 755 sq ft16
Tower A and B2 BHK70.46 sq m · 758 sq ft12
Tower A and B2 BHK70.7 sq m · 761 sq ft14
Tower A and B2 BHK70.74 sq m · 761 sq ft4
Tower A and B2 BHK70.98 sq m · 764 sq ft12
Tower A and B2 BHK71.27 sq m · 767 sq ft4
Tower A and BShop14.93 sq m · 161 sq ft3
Tower A and BShop16.79 sq m · 181 sq ft1
Tower A and BShop18.8 sq m · 202 sq ft2
Tower A and BShop22.79 sq m · 245 sq ft1
Tower A and BShop24.46 sq m · 263 sq ft1
Tower A and BShop25.71 sq m · 277 sq ft4
Tower A and BShop32.05 sq m · 345 sq ft2
Tower C D3 BHK85.37 sq m · 919 sq ft1
Tower C D3 BHK88.93 sq m · 957 sq ft16
Tower C D3 BHK89.4 sq m · 962 sq ft14
Tower C D3 BHK89.79 sq m · 966 sq ft8
Tower C D3 BHK89.82 sq m · 967 sq ft8
Tower C D3 BHK90.25 sq m · 971 sq ft8
Tower C D3 BHK90.28 sq m · 972 sq ft6
Tower E2 BHK44.12 sq m · 475 sq ft2
Tower E2 BHK66.25 sq m · 713 sq ft6
Tower E2 BHK66.4 sq m · 715 sq ft18
Tower E2 BHK66.65 sq m · 717 sq ft42
Tower E2 BHK66.79 sq m · 719 sq ft5
Tower E2 BHK66.94 sq m · 721 sq ft15

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
Block AClosed/Covered00000
Block AOpen Space00000
Block BClosed/Covered00000
Block BOpen Space00000
Block CClosed/Covered00000
Block COpen Space000010
Tower A and BClosed/Covered00001
Tower A and BOpen Space000063
Tower C DClosed/Covered00001
Tower C DOpen Space000033
Tower EClosed/Covered000020
Tower EOpen Space000068

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Block A

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Block B

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Block C

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
  • Sanitary Fittings within the flats / premises20%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.20%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Tower A and B

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Tower C D

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Tower E

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure65%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsR.C.C100%
  • Water SupplyHDPE & C PVC100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Pythroid STP100%
  • Storm Water DrainsEco Drain Pipe100%
  • Landscaping & Tree PlantingGulmohar100%
  • Street LightingLED Lights100%
  • Community BuildingsClub House100%
  • Treatment And Disposal Of Sewage And Sullage WaterRecycle water used for Flushing & gardening100%
  • Solid Waste Management And DisposalKanak Resources100%
  • Water conservation /Rain water harvestingHarvesting Chambers are Provided100%
  • Energy managemcntSolar Energy100%
  • Fire protection and fire safety requirementsStandard100%
  • Electrical meter room, sub-station, receiving stationTransformer & Meter Pannels100%
  • Aggregate area of recreational Open Space100%
  • Open ParkingPavers100%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

35 documents held by Deedo, 59 filings listed on MahaRERA's project page

Title

Encumbrance

Commencement certificates

Form 1

Form 2

Form b

Form 5

Form 4

Registration certificate

Others

Layout plan

Building plans

Allotment letter

Document library

  • Proforma of Allotment letterAllotment Letter.pdf · uploaded 27 Jul 2017View
  • Copy of the legal title reportPyramid City-VI Title Search-ilovepdf-compressed.pdf · uploaded 27 Jul 2017View
  • Copy of Layout Approval (in case of layout)layout plan.pdf · uploaded 28 Jul 2017View
  • Building Plan Approval (IOD)all pages_Part1 (2).pdf · uploaded 28 Jul 2017View
  • Building Plan Approval (IOD)all pages_Part2.pdf · uploaded 28 Jul 2017View
  • Building Plan Approval (IOD)all pages_Part3-ilovepdf-compressed (1).pdf · uploaded 28 Jul 2017View
  • Building Plan Approval (IOD)all pages_Part4-ilovepdf-compressed (1).pdf · uploaded 28 Jul 2017View
  • Building Plan Approval (IOD)all pages_Part5-ilovepdf-compressed (1).pdf · uploaded 28 Jul 2017View
  • Building Plan Approval (IOD)all pages_Part6-ilovepdf-compressed (1).pdf · uploaded 28 Jul 2017View
  • Building Plan Approval (IOD)all pages_Part7-ilovepdf-compressed (1).pdf · uploaded 28 Jul 2017View
  • Building Plan Approval (IOD)all pages_Part8-ilovepdf-compressed (1).pdf · uploaded 28 Jul 2017View
  • Commencement Certificates / NA Order for plotted developmentBuilding Permit Letter-ilovepdf-compressed.pdf · uploaded 28 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate.PDF · uploaded 28 Jul 2017View
  • Details of encumbrancesencumbrance certificate.PDF · uploaded 28 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)certificate of Architect.pdf · uploaded 28 Jul 2017View
  • Declaration in FORM BCity-6 Form B.pdf · uploaded 5 Aug 2017View
  • Otheroccupancy certificate.PDF · uploaded 14 Apr 2018View
  • Building Plan Approval (IOD)1.pdf · uploaded 15 May 2018View
  • Building Plan Approval (IOD)2.pdf · uploaded 15 May 2018View
  • Building Plan Approval (IOD)3.pdf · uploaded 15 May 2018View
  • Building Plan Approval (IOD)4.pdf · uploaded 15 May 2018View
  • Building Plan Approval (IOD)5.pdf · uploaded 15 May 2018View
  • Building Plan Approval (IOD)6.pdf · uploaded 15 May 2018View
  • Building Plan Approval (IOD)7.pdf · uploaded 15 May 2018View
  • Building Plan Approval (IOD)8.pdf · uploaded 15 May 2018View
  • Building Plan Approval (IOD)9.pdf · uploaded 15 May 2018View
  • Building Plan Approval (IOD)9.pdf · uploaded 15 May 2018View
  • Building Plan Approval (IOD)10.pdf · uploaded 15 May 2018View
  • Building Plan Approval (IOD)11.pdf · uploaded 15 May 2018View
  • Commencement Certificates / NA Order for plotted developmentbuilding permit.pdf · uploaded 15 May 2018View
  • Certificates of CA (Form 5)form 5 annual report.pdf · uploaded 30 Sep 2018View
  • OtherOccupancy certificate.pdf · uploaded 22 Jul 2019View
  • Certificates of Architect (Form 4)Form 4.PDF · uploaded 22 Jul 2019View

Promoter documents

  • Legal Title reportPyramid City-VI Title Search-ilovepdf-compressed.pdf · uploaded 27 Jul 2017View
  • Declaration Form BCity-6 Form B.pdf · uploaded 5 Aug 2017View

Technical documents

  • Building Plan Approval1.pdfView
  • Building Plan Approval2.pdfView
  • Building Plan Approval3.pdfView
  • Building Plan Approval4.pdfView
  • Building Plan Approval5.pdfView
  • Building Plan Approval6.pdfView
  • Building Plan Approval7.pdfView
  • Building Plan Approval8.pdfView
  • Building Plan Approval9.pdfView
  • Building Plan Approval9.pdfView
  • Building Plan Approval10.pdfView
  • Building Plan Approval11.pdfView
  • Layout Approvallayout plan.pdfView
  • Building Plan Approvalall pages_Part1 (2).pdfView
  • Building Plan Approvalall pages_Part2.pdfView
  • Building Plan Approvalall pages_Part3-ilovepdf-compressed (1).pdfView
  • Building Plan Approvalall pages_Part4-ilovepdf-compressed (1).pdfView
  • Building Plan Approvalall pages_Part5-ilovepdf-compressed (1).pdfView
  • Building Plan Approvalall pages_Part6-ilovepdf-compressed (1).pdfView
  • Building Plan Approvalall pages_Part7-ilovepdf-compressed (1).pdfView
  • Building Plan Approvalall pages_Part8-ilovepdf-compressed (1).pdfView

Other legal documents

  • Otheroccupancy certificate.PDFView
  • OtherOccupancy certificate.pdfView

Proforma allotment letter

  • Proforma allotment letterAllotment Letter.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Pipla, Nagpur (Rural) taluka

Survey, CTS, gat or plot numbers

P.H No 38

As published on MahaRERA's project page

P.H No - 38

Boundaries

North
Road
South
Other Layout
East
Pyramid city 3
West
Layout

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAr Sanjay Soni—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology