Vidarbha Premier Nagri Phase 3 Kalmeshwar

Completed

Kalmeshwar (Mcl), Nagpur 441501 |Promoter: Prakash Narayanrao Raole

Residential / Group HousingRERAP50500010477
31 Aug 2017Registered with MahaRERA
31 Dec 2018Promised completion
30 Oct 2020Revised completionPushed back 1 year and 10 months
8Buildings
48Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
8
Unit types
1 BHK48 units in all
Land area for this project
2,064 sq m (22,217 sq ft)
Permissible built-up area
1,872 sq m (20,150 sq ft)
Sanctioned built-up area
1,872 sq m (20,150 sq ft)
Address
812, Santra Market Road, KalmeshwarPIN 441501
Designated bank account
Maharashtra State Cooperative Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 18.56938, 73.83458
Vidarbha Premier Nagri Phase 3 Kalmeshwar is at latitude 18.56938, longitude 73.83458.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 1 year and 10 months

The latest completion date on record passed 6 years ago.

Registered
31 Aug 2017
Promised
31 Dec 2018
Revised
30 Oct 2020

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5050001047731 Aug 201731 Dec 201830 Oct 2020Prakash Narayanrao RaoleProject page

8 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
B 1036
B 1136
B 1236
B 1336
B 1436
B 1536
B 1636
B 936

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

48 units registered

1 BHK · 48 units
BuildingTypeCarpet areaUnits
B 101 BHK234 sq m · 2,519 sq ft6
B 111 BHK234 sq m · 2,519 sq ft6
B 121 BHK234 sq m · 2,519 sq ft6
B 131 BHK234 sq m · 2,519 sq ft6
B 141 BHK234 sq m · 2,519 sq ft6
B 151 BHK234 sq m · 2,519 sq ft6
B 161 BHK234 sq m · 2,519 sq ft6
B 91 BHK234 sq m · 2,519 sq ft6

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
B 10Closed/Covered00000
B 10Open Space00000
B 11Closed/Covered00000
B 11Open Space00000
B 12Closed/Covered00000
B 12Open Space00000
B 13Closed/Covered00000
B 13Open Space00000
B 14Closed/Covered00000
B 14Open Space00000
B 15Closed/Covered00000
B 15Open Space00000
B 16Closed/Covered00000
B 16Open Space00000
B 9Closed/Covered00000
B 9Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

B 10

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

B 11

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

B 12

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

B 13

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

B 14

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

B 15

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

B 16

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

B 9

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & Footpaths100100%
  • Water Supply100100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)100100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street Lighting100100%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingNot applicable
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving station100100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open Parking100100%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

29 documents held by Deedo, 73 filings listed on MahaRERA's project page

Form bs

Allotment letters

Form 1s

Form 5s

Registration certificate

Extension certificate

Form 2a

Other

Document library

  • Details of encumbrancesWill be Submitted Later.pdf · uploaded 31 Jul 2017View
  • Declaration in FORM BWill be Submitted Later.pdf · uploaded 31 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Will be Submitted Later.pdf · uploaded 31 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Will be Submitted Later.pdf · uploaded 31 Jul 2017View
  • Copy of the legal title reportLEGAL (2).pdf · uploaded 31 Jul 2017Source
  • Copy of Layout Approval (in case of layout)LAY_OUT.pdf · uploaded 31 Jul 2017Source
  • Proforma of Allotment letterALLOT.pdf · uploaded 31 Jul 2017View
  • Building Plan Approval (IOD)PLAN (2).pdf · uploaded 31 Jul 2017Source
  • Copy of Layout Approval (in case of layout)IMG_20170914_0001.pdf · uploaded 15 Sep 2017Source
  • Copy of the legal title reportIMG_20170914_0002.pdf · uploaded 15 Sep 2017Source
  • Copy of the legal title reportIMG_20170914_0003.pdf · uploaded 15 Sep 2017Source
  • Commencement Certificates / NA Order for plotted developmentIMG_20170914_0008.pdf · uploaded 18 Sep 2017Source
  • Commencement Certificates / NA Order for plotted developmentIMG_20170914_0009.pdf · uploaded 18 Sep 2017Source
  • Copy of the legal title reportIMG_20170914_0002.pdf · uploaded 18 Sep 2017Source
  • Declaration in FORM BIMG_20170916_0001.pdf · uploaded 18 Sep 2017View
  • Declaration in FORM BIMG_20170916_0002.pdf · uploaded 18 Sep 2017View
  • Declaration in FORM BIMG_20170916_0003.pdf · uploaded 18 Sep 2017View
  • Declaration in FORM BIMG_20170916_0004.pdf · uploaded 18 Sep 2017View
  • Declaration in FORM BIMG_20170916_0005.pdf · uploaded 18 Sep 2017View
  • Declaration in FORM BIMG_20170916_0006.pdf · uploaded 18 Sep 2017View
  • Declaration in FORM BIMG_20170916_0007.pdf · uploaded 18 Sep 2017View
  • Declaration in FORM BIMG_20170916_0008.pdf · uploaded 18 Sep 2017View
  • Building Plan Approval (IOD)IMG_20170914_0011.pdf · uploaded 18 Sep 2017Source
  • Building Plan Approval (IOD)IMG_20170914_0012.pdf · uploaded 18 Sep 2017Source
  • Building Plan Approval (IOD)IMG_20170914_0013.pdf · uploaded 18 Sep 2017Source
  • Building Plan Approval (IOD)IMG_20170914_0014.pdf · uploaded 18 Sep 2017Source
  • Building Plan Approval (IOD)IMG_20170914_0015.pdf · uploaded 18 Sep 2017Source
  • OtherIMG_20170914_0004.pdf · uploaded 18 Sep 2017Source
  • OtherIMG_20170914_0005.pdf · uploaded 18 Sep 2017Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)IMG_20170918_0001.pdf · uploaded 18 Sep 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)IMG_20170918_0002.pdf · uploaded 18 Sep 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)IMG_20170918_0003.pdf · uploaded 18 Sep 2017View
  • Proforma of Allotment letterNEW_20170918_0001.pdf · uploaded 18 Sep 2017View
  • Proforma of Allotment letterNEW_20170918_0002.pdf · uploaded 18 Sep 2017Source
  • Certificates of CA (Form 5)IMG_20171006_0001.pdf · uploaded 9 Oct 2017View
  • Certificates of CA (Form 5)IMG_20171006_0002.pdf · uploaded 9 Oct 2017View
  • Certificates of CA (Form 5)IMG_20171006_0003.pdf · uploaded 9 Oct 2017View
  • Certificates of CA (Form 5)IMG_20171006_0004.pdf · uploaded 9 Oct 2017View
  • Certificates of CA (Form 5)IMG_0001.pdf · uploaded 15 Jan 2019View
  • Certificates of CA (Form 5)IMG_0002.pdf · uploaded 15 Jan 2019View
  • Certificates of CA (Form 5)Kalmeshwar 07-02-19.pdf · uploaded 7 Feb 2019View
  • Certificates of CA (Form 5)IMG_0003 Kalmeshwar Phase III.pdf · uploaded 11 Mar 2019View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 5 For FY 19-20.pdf · uploaded 3 May 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5 For FY 20-21.pdf · uploaded 3 May 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Form 5 For FY 19-20.pdf · uploaded 3 May 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 For FY 21-22.pdf · uploaded 3 May 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Form 5 For FY 18-19.pdf · uploaded 3 May 2023View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOccupancy Certificate Along With Form 4.pdf · uploaded 3 May 2023Source
  • Architect’s Certificate on Completion of Project (Form 4)Occupancy Certificate Along With Form 4.pdf · uploaded 3 May 2023Source

Promoter documents

  • Declaration Form BWill be Submitted Later.pdf · uploaded 31 Jul 2017View
  • Legal Title reportLEGAL (2).pdf · uploaded 31 Jul 2017Source
  • Legal Title reportIMG_20170914_0002.pdf · uploaded 15 Sep 2017Source
  • Legal Title reportIMG_20170914_0003.pdf · uploaded 15 Sep 2017Source
  • Legal Title reportIMG_20170914_0002.pdf · uploaded 18 Sep 2017Source
  • Declaration Form BIMG_20170916_0001.pdf · uploaded 18 Sep 2017View
  • Declaration Form BIMG_20170916_0002.pdf · uploaded 18 Sep 2017View
  • Declaration Form BIMG_20170916_0003.pdf · uploaded 18 Sep 2017View
  • Declaration Form BIMG_20170916_0004.pdf · uploaded 18 Sep 2017View
  • Declaration Form BIMG_20170916_0005.pdf · uploaded 18 Sep 2017View
  • Declaration Form BIMG_20170916_0006.pdf · uploaded 18 Sep 2017View
  • Declaration Form BIMG_20170916_0007.pdf · uploaded 18 Sep 2017View
  • Declaration Form BIMG_20170916_0008.pdf · uploaded 18 Sep 2017View

Technical documents

  • Layout ApprovalLAY_OUT.pdfSource
  • Building Plan ApprovalPLAN (2).pdfSource
  • Layout ApprovalIMG_20170914_0001.pdfSource
  • Building Plan ApprovalIMG_20170914_0011.pdfSource
  • Building Plan ApprovalIMG_20170914_0012.pdfSource
  • Building Plan ApprovalIMG_20170914_0013.pdfSource
  • Building Plan ApprovalIMG_20170914_0014.pdfSource
  • Building Plan ApprovalIMG_20170914_0015.pdfSource

Other legal documents

Proforma allotment letter

  • Proforma allotment letterNEW_20170918_0002.pdfSource

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Kalmeshwar (MCL), Kalameshwar taluka

Survey, CTS, gat or plot numbers

812

As published on MahaRERA's project page

812

Boundaries

North
Survey No 811
South
Survey No 800 801
East
B C Type Building
West
Nalla

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectSunil Sawalkar—
EngineerMs Skyline Design—
OtherMs Suvichar Construction—

Source: MahaRERA project page. Contact details are not shown.