Gotal Panjari, Nagpur 441108 |Promoter: Sky Developers And Promoters India Pvt. Ltd.

18 Aug 2017Registered with MahaRERA
31 Aug 2019Promised completion
5Buildings
141Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Completed
Buildings
5
Unit types
Shop 1, Shop 10, Shop 11, Shop 12, Shop 13, Shop 14, Shop 2, Shop 3, Shop 4, Shop 5, Shop 6, Shop 7, Shop 8, Shop 9, Type 1, Type 2, Type 3, Type 4, Type 5, Type 6, Type 7, Type 8141 units in all
Land area for this project
4,423 sq m (47,613 sq ft)
Permissible built-up area
6,109 sq m (65,753 sq ft)
Sanctioned built-up area
6,109 sq m (65,753 sq ft)
Recreational open space
601 sq m (6,464 sq ft)
Address
62/2PIN 441108
Designated bank account
Axis Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 21.03339, 78.95428
Kasturi Square is at latitude 21.03339, longitude 78.95428.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Aug 2019

The latest completion date on record passed 7 years and 2 months ago.

Registered
18 Aug 2017
Promised
31 Aug 2019

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5050000825518 Aug 201731 Aug 2019—Sky Developers And Promoters India Pvt. Ltd.Project page

5 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Shop214
Wing A534
Wing B532
Wing C534
Wing D527

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

141 units registered

Shop 1 · 1 unitShop 10 · 1 unitShop 11 · 1 unitShop 12 · 1 unitShop 13 · 1 unitShop 14 · 1 unitShop 2 · 1 unitShop 3 · 1 unitShop 4 · 1 unitShop 5 · 1 unitShop 6 · 1 unitShop 7 · 1 unitShop 8 · 1 unitShop 9 · 1 unitType 1 · 12 unitsType 2 · 10 unitsType 3 · 25 unitsType 4 · 16 unitsType 5 · 24 unitsType 6 · 16 unitsType 7 · 12 unitsType 8 · 12 units
BuildingTypeCarpet areaUnits
ShopShop 122.98 sq m · 247 sq ft1
ShopShop 1022.24 sq m · 239 sq ft1
ShopShop 1121.8 sq m · 235 sq ft1
ShopShop 1221.36 sq m · 230 sq ft1
ShopShop 1320.92 sq m · 225 sq ft1
ShopShop 1415.18 sq m · 163 sq ft1
ShopShop 222.55 sq m · 243 sq ft1
ShopShop 321.79 sq m · 235 sq ft1
ShopShop 421.35 sq m · 230 sq ft1
ShopShop 520.91 sq m · 225 sq ft1
ShopShop 620.46 sq m · 220 sq ft1
ShopShop 722.43 sq m · 241 sq ft1
ShopShop 824.53 sq m · 264 sq ft1
ShopShop 923.01 sq m · 248 sq ft1
Wing AType 146.32 sq m · 499 sq ft2
Wing AType 231.47 sq m · 339 sq ft4
Wing AType 338.19 sq m · 411 sq ft16
Wing AType 439.42 sq m · 424 sq ft4
Wing AType 539.85 sq m · 429 sq ft4
Wing AType 635.27 sq m · 380 sq ft4
Wing BType 129.86 sq m · 321 sq ft4
Wing BType 230.36 sq m · 327 sq ft4
Wing BType 329.8 sq m · 321 sq ft4
Wing BType 430 sq m · 323 sq ft4
Wing BType 529.13 sq m · 314 sq ft4
Wing BType 629.68 sq m · 319 sq ft4
Wing BType 735.34 sq m · 380 sq ft4
Wing BType 830.49 sq m · 328 sq ft4
Wing CType 137.92 sq m · 408 sq ft1
Wing CType 251.02 sq m · 549 sq ft1
Wing CType 331.47 sq m · 339 sq ft4
Wing CType 443.19 sq m · 465 sq ft4
Wing CType 538.2 sq m · 411 sq ft12
Wing CType 634.43 sq m · 371 sq ft4
Wing CType 734.85 sq m · 375 sq ft4
Wing CType 835.27 sq m · 380 sq ft4
Wing DType 131.47 sq m · 339 sq ft5
Wing DType 246.47 sq m · 500 sq ft1
Wing DType 350.52 sq m · 544 sq ft1
Wing DType 427.21 sq m · 293 sq ft4
Wing DType 534.85 sq m · 375 sq ft4
Wing DType 638.2 sq m · 411 sq ft4
Wing DType 743.19 sq m · 465 sq ft4
Wing DType 840.26 sq m · 433 sq ft4

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
ShopClosed/Covered00000
ShopOpen Space00002
Wing AClosed/Covered00000
Wing AOpen Space00000
Wing BClosed/Covered00000
Wing BOpen Space00000
Wing CClosed/Covered00000
Wing COpen Space00000
Wing DClosed/Covered00000
Wing DOpen Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Shop

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
  • Sanitary Fittings within the flats / premises30%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%

Wing A

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor70%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
  • Sanitary Fittings within the flats / premises10%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Wing B

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor50%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
  • Sanitary Fittings within the flats / premises70%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Wing C

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor50%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
  • Sanitary Fittings within the flats / premises80%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Wing D

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor50%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
  • Sanitary Fittings within the flats / premises20%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.20%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsINTERNAL ROADS ONLY0%
  • Water SupplyWELL AND BORING0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)STP0%
  • Storm Water DrainsWILL BE DONE0%
  • Landscaping & Tree PlantingGARDEN AND LAWN0%
  • Street LightingSTREET LIGHT POLES0%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterTREATMENT OF SEWERAGE WATER0%
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingRAIN WATER HARVESTING0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open Space600.57SQMT0%
  • Open Parking2 PARKING0%
  • LIFT WITH POWER BACKUP1 LIFT EACH IN RESIDENTIAL BUILDING20%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

2 documents held by Deedo, 18 filings listed on MahaRERA's project page

Registration certificate

Other

Document library

  • Copy of Layout Approval (in case of layout)LAYOUT MAP.pdf · uploaded 28 Jul 2017Source
  • Proforma of Allotment letterAGREEMENT-AS PER RERA.pdf · uploaded 28 Jul 2017Source
  • Proforma of Allotment letterAllotment.pdf · uploaded 28 Jul 2017Source
  • Building Plan Approval (IOD)BLDG-PERMIT.pdf · uploaded 28 Jul 2017Source
  • Commencement Certificates / NA Order for plotted developmentBLDG-PERMIT.pdf · uploaded 28 Jul 2017Source
  • Copy of the legal title reportlegal title report.pdf · uploaded 28 Jul 2017Source
  • Details of encumbranceslegal title report.pdf · uploaded 28 Jul 2017Source
  • Declaration in FORM BFORM B.pdf · uploaded 28 Jul 2017Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)form 1 architect.pdf · uploaded 28 Jul 2017Source
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 ENGINEER.pdf · uploaded 28 Jul 2017Source
  • Certificates of CA (Form 5)ks.pdf · uploaded 6 Oct 2018Source
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentscquare OC.pdf · uploaded 14 Jan 2020Source
  • Architect’s Certificate on Completion of Project (Form 4)FORM 4 SQR.pdf · uploaded 16 Jan 2020Source

Promoter documents

  • Legal Title reportlegal title report.pdf · uploaded 28 Jul 2017Source
  • Declaration Form BFORM B.pdf · uploaded 28 Jul 2017Source

Technical documents

  • Layout ApprovalLAYOUT MAP.pdfSource
  • Building Plan ApprovalBLDG-PERMIT.pdfSource

Proforma allotment letter

  • Proforma allotment letterAllotment.pdfSource

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Gotal Panjari, Nagpur (Rural) taluka

Survey, CTS, gat or plot numbers

62/2

As published on MahaRERA's project page

62/2

Boundaries

North
By Kh No 61
South
By Kh No 63 And Road
East
By Road And Remaining Portion Of Kh No 62-2
West
By Remaining Land Of Kh No 62

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAlok Lunia—
ArchitectRajendra R Sulke—
EngineerR & G Associates—
Real Estate AgentAdiva Corporation—
Registered real estate agentAdiva CorporationA50500005958

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology