BLD_009001Completed2 floors
Shop · Kasturi Square
Gotal Panjari · RERA P50500008255
2Sanctioned habitable floorsregistration certificate
31 Aug 2019Promised completion
Floors
2 sanctioned habitable floors, as registered. MahaRERA doesn't publish flat-by-flat records, so floors are shown without flats.
As registered
- Sanctioned habitable floors
- 2
Unit inventory
Apartments and other units by type, from MahaRERA's project page.
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| SHOP 1 | 23 m² (247 sq.ft) | 1 | not published |
| SHOP 10 | 22.2 m² (239 sq.ft) | 1 | not published |
| SHOP 11 | 21.8 m² (235 sq.ft) | 1 | not published |
| SHOP 12 | 21.4 m² (230 sq.ft) | 1 | not published |
| SHOP 13 | 20.9 m² (225 sq.ft) | 1 | not published |
| SHOP 14 | 15.2 m² (163 sq.ft) | 1 | not published |
| SHOP 2 | 22.6 m² (243 sq.ft) | 1 | not published |
| SHOP 3 | 21.8 m² (235 sq.ft) | 1 | not published |
| SHOP 4 | 21.4 m² (230 sq.ft) | 1 | not published |
| SHOP 5 | 20.9 m² (225 sq.ft) | 1 | not published |
| SHOP 6 | 20.5 m² (220 sq.ft) | 1 | not published |
| SHOP 7 | 22.4 m² (241 sq.ft) | 1 | not published |
| SHOP 8 | 24.5 m² (264 sq.ft) | 1 | not published |
| SHOP 9 | 23 m² (248 sq.ft) | 1 | not published |
| Total | 14 |
Parking
Spaces as declared on MahaRERA's project page.
| Type | Two-wheeler | Four-wheeler | Visitor | Total |
|---|---|---|---|---|
| Closed/Covered | 0 | 0 | 0 | 0 |
| Open Space | 0 | 0 | 0 | 2 |
Construction progress
Work completed on this building, as the promoter reported it to MahaRERA (Form 1).
- Excavation100%
- Basement (if any)100%
- Podiums (if any)0%
- Plinth100%
- Stilt Floor0%
- Slabs of Super Structure100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
- Sanitary Fittings within the flats / premises30%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%
Data through9 Oct 2026SourcesMahaRERA registration certificate · MahaRERA project pageFloors and units are as registered; a promoter can revise them in later filings.Methodology