BLD_009004Completed5 floors

Wing C · Kasturi Square

Gotal Panjari · RERA P50500008255

5Sanctioned habitable floorsregistration certificate
31 Aug 2019Promised completion

Floors

5 sanctioned habitable floors, as registered. MahaRERA doesn't publish flat-by-flat records, so floors are shown without flats.

As registered

RERA registration
P50500008255 · registered 18 Aug 2017
Promised completion
31 Aug 2019
Sanctioned habitable floors
5

Unit inventory

Apartments and other units by type, from MahaRERA's project page.

TypeCarpet areaUnitsBooked
TYPE 137.9 m² (408 sq.ft)1not published
TYPE 251 m² (549 sq.ft)1not published
TYPE 331.5 m² (339 sq.ft)4not published
TYPE 443.2 m² (465 sq.ft)4not published
TYPE 538.2 m² (411 sq.ft)12not published
TYPE 634.4 m² (371 sq.ft)4not published
TYPE 734.9 m² (375 sq.ft)4not published
TYPE 835.3 m² (380 sq.ft)4not published
Total34

Parking

Spaces as declared on MahaRERA's project page.

TypeTwo-wheelerFour-wheelerVisitorTotal
Closed/Covered0000
Open Space0000

Construction progress

Work completed on this building, as the promoter reported it to MahaRERA (Form 1).

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor50%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
  • Sanitary Fittings within the flats / premises80%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Data through9 Oct 2026SourcesMahaRERA registration certificate · MahaRERA project pageFloors and units are as registered; a promoter can revise them in later filings.Methodology