BLD_006527Completed4 floors

Wing A · Mahavir Height

Pachora (M Cl) · RERA P49900011000

4Sanctioned habitable floorsregistration certificate
12 Dec 2020Promised completion

Floors

4 sanctioned habitable floors, as registered. MahaRERA doesn't publish flat-by-flat records, so floors are shown without flats.

As registered

RERA registration
P49900011000 · registered 31 Aug 2017
Promised completion
12 Dec 2020
Sanctioned habitable floors
4

Unit inventory

Apartments and other units by type, from MahaRERA's project page.

TypeCarpet areaUnitsBooked
2 BHK45.1 m² (485 sq.ft)2not published
3 BHK51 m² (549 sq.ft)4not published
3 BHK LARGE55.6 m² (598 sq.ft)2not published
SHOP 111.1 m² (120 sq.ft)1not published
SHOP 1014.5 m² (156 sq.ft)1not published
SHOP 1111.1 m² (119 sq.ft)1not published
SHOP 1215.4 m² (165 sq.ft)1not published
SHOP 28.7 m² (93 sq.ft)1not published
SHOP 314.1 m² (151 sq.ft)1not published
SHOP 414.8 m² (160 sq.ft)1not published
SHOP 510.7 m² (115 sq.ft)1not published
SHOP 610.7 m² (115 sq.ft)1not published
SHOP 714.8 m² (159 sq.ft)1not published
SHOP 814.1 m² (151 sq.ft)1not published
SHOP 911.3 m² (122 sq.ft)1not published
Total20

Parking

Spaces as declared on MahaRERA's project page.

TypeTwo-wheelerFour-wheelerVisitorTotal
Closed/Covered0001
Open Space0001

Construction progress

Work completed on this building, as the promoter reported it to MahaRERA (Form 1).

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure3%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Data through9 Oct 2026SourcesMahaRERA registration certificate · MahaRERA project pageFloors and units are as registered; a promoter can revise them in later filings.Methodology