Mahavir Height

Completed

Pachora (M Cl), Jalgaon 424201 |Promoter: Sahyog Creations

31 Aug 2017Registered with MahaRERA
12 Dec 2020Promised completion
2Buildings
33Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Completed
Buildings
2
Unit types
2 BHK, 3 BHK, 3 BHK LARGE, Shop 1, Shop 10, Shop 11, Shop 12, Shop 2, Shop 3, Shop 4, Shop 5, Shop 6, Shop 7, Shop 8, Shop 9, Shop 13, Shop 14, Shop 15, Shop 16, Shop 1733 units in all
Land area for this project
1,115 sq m (12,000 sq ft)
Permissible built-up area
1,299 sq m (13,981 sq ft)
Sanctioned built-up area
1,299 sq m (13,981 sq ft)
Address
58/1/A/5PIN 424201
Designated bank account
The Jalgaon Peopels Cooperative Bank Limited
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 20.66551, 75.34799
Mahavir Height is at latitude 20.66551, longitude 75.34799.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 12 Dec 2020

The latest completion date on record passed 5 years and 10 months ago.

Registered
31 Aug 2017
Promised
12 Dec 2020

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P4990001100031 Aug 201712 Dec 2020—Sahyog CreationsProject page

2 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Wing A420
Wing B413

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

33 units registered

2 BHK · 4 units3 BHK · 8 units3 BHK LARGE · 4 unitsShop 1 · 1 unitShop 10 · 1 unitShop 11 · 1 unitShop 12 · 1 unitShop 2 · 1 unitShop 3 · 1 unitShop 4 · 1 unitShop 5 · 1 unitShop 6 · 1 unitShop 7 · 1 unitShop 8 · 1 unitShop 9 · 1 unitShop 13 · 1 unitShop 14 · 1 unitShop 15 · 1 unitShop 16 · 1 unitShop 17 · 1 unit
BuildingTypeCarpet areaUnits
Wing A2 BHK45.1 sq m · 485 sq ft2
Wing A3 BHK51 sq m · 549 sq ft4
Wing A3 BHK LARGE55.57 sq m · 598 sq ft2
Wing AShop 111.12 sq m · 120 sq ft1
Wing AShop 1014.5 sq m · 156 sq ft1
Wing AShop 1111.07 sq m · 119 sq ft1
Wing AShop 1215.37 sq m · 165 sq ft1
Wing AShop 28.66 sq m · 93 sq ft1
Wing AShop 314.07 sq m · 151 sq ft1
Wing AShop 414.83 sq m · 160 sq ft1
Wing AShop 510.7 sq m · 115 sq ft1
Wing AShop 610.71 sq m · 115 sq ft1
Wing AShop 714.77 sq m · 159 sq ft1
Wing AShop 814.05 sq m · 151 sq ft1
Wing AShop 911.29 sq m · 122 sq ft1
Wing B2 BHK45.1 sq m · 485 sq ft2
Wing B3 BHK51 sq m · 549 sq ft4
Wing B3 BHK LARGE55.57 sq m · 598 sq ft2
Wing BShop 1312.38 sq m · 133 sq ft1
Wing BShop 1411.08 sq m · 119 sq ft1
Wing BShop 1517.18 sq m · 185 sq ft1
Wing BShop 1613.64 sq m · 147 sq ft1
Wing BShop 1711.79 sq m · 127 sq ft1

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
Wing AClosed/Covered00001
Wing AOpen Space00001
Wing BClosed/Covered00001
Wing BOpen Space00001

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Wing A

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure3%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Wing B

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure3%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyCompleted100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Completed100%
  • Storm Water DrainsCompleted100%
  • Landscaping & Tree PlantingCompleted100%
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingCompleted100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationCompleted100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingCompleted100%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

12 documents held by Deedo, 15 filings listed on MahaRERA's project page

Title

Encumbrance

Form 1

Form 2

Form b

Commencement certificate

Registration certificate

Completion

Other

Layout plan

Allotment letter

Building plan

Document library

  • Copy of the legal title reportMH Search Report.pdf · uploaded 16 Aug 2017View
  • Details of encumbrancesDECLARATION ENCUMBARANCES.pdf · uploaded 16 Aug 2017View
  • Copy of Layout Approval (in case of layout)PLOT LAYOUT.pdf · uploaded 16 Aug 2017View
  • Proforma of Allotment letterDRAFT AGREEMENT TO SALE.pdf · uploaded 16 Aug 2017View
  • Declaration in FORM BFORM B.pdf · uploaded 16 Aug 2017View
  • Building Plan Approval (IOD)Buiding Plan Mahavir Height.pdf · uploaded 16 Aug 2017View
  • Commencement Certificates / NA Order for plotted developmentCONSTRUTION PERMISSION.pdf · uploaded 16 Aug 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)MH Eng Certificate.pdf · uploaded 16 Aug 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architecs Certificat MH.pdf · uploaded 16 Aug 2017View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentMahaveer Heights Occupancy Cert.pdf · uploaded 23 Jan 2023View

Promoter documents

  • Legal Title reportMH Search Report.pdf · uploaded 16 Aug 2017View
  • Declaration Form BFORM B.pdf · uploaded 16 Aug 2017View

Technical documents

  • Layout ApprovalPLOT LAYOUT.pdfView
  • Building Plan ApprovalBuiding Plan Mahavir Height.pdfView

Proforma allotment letter

  • Proforma allotment letterDRAFT AGREEMENT TO SALE.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Pachora (M Cl), Pachora taluka

Survey, CTS, gat or plot numbers

58/1/A/5

As published on MahaRERA's project page

58/1/A/5

Boundaries

North
9 Mtr Road
South
7 Mtr Road
East
Plot No 4 And 10
West
9 Mtr Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectNitin A Pargaonkar—
EngineerAv Consultants—

Source: MahaRERA project page. Contact details are not shown.