BLD_006604Completed4 floors
Megh Malhar Phase 2 Wing 3 · Megh Malhar Phase 2
Kandari · RERA P49900020742
4Sanctioned habitable floorsregistration certificate
31 Dec 2027Revised completionpromised 30 Dec 2023
Floors
4 sanctioned habitable floors, as registered. MahaRERA doesn't publish flat-by-flat records, so floors are shown without flats.
As registered
- RERA registration
- P49900020742 · registered 8 May 2019
- Promised completion
- 30 Dec 2023
- Revised completion
- 31 Dec 2027
- Sanctioned habitable floors
- 4
Unit inventory
Apartments and other units by type, from MahaRERA's project page.
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 2BHK | 57.7 m² (621 sq.ft) | 4 | not published |
| 2BHK | 57.7 m² (621 sq.ft) | 4 | not published |
| 2BHK | 64 m² (689 sq.ft) | 8 | not published |
| Total | 16 |
Parking
Spaces as declared on MahaRERA's project page.
| Type | Two-wheeler | Four-wheeler | Visitor | Total |
|---|---|---|---|---|
| Closed/Covered | 0 | 0 | 0 | 0 |
| Open Space | 0 | 0 | 0 | 32 |
Construction progress
Work completed on this building, as the promoter reported it to MahaRERA (Form 1).
- Excavationn/a
- Basement (if any)n/a
- Podiums (if any)n/a
- Plinthn/a
- Stilt Floorn/a
- Slabs of Super Structuren/a
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premisesn/a
- Sanitary Fittings within the flats / premisesn/a
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanksn/a
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.n/a
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.n/a
Data through9 Oct 2026SourcesMahaRERA registration certificate · MahaRERA project pageFloors and units are as registered; a promoter can revise them in later filings.Methodology