Chalisgaon, Maharashtra 424101 |Promoter: M/S Shree Swami Samarth Traders Builders And Developers

14 Jan 2020Registered with MahaRERA
30 Dec 2022Promised completion
1Building
22Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Completed
Buildings
1
Unit types
1BHK, 2BHK, Shop22 units in all
Land area for this project
575 sq m (6,189 sq ft)
Permissible built-up area
748 sq m (8,051 sq ft)
Sanctioned built-up area
748 sq m (8,051 sq ft)
Address
431/3b Plot No 70, Cts No.431/3b Plot No 70, ChalisgaonPIN 424101
Designated bank account
Kotak Mahindra Bank Limited
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
R D Tower is at latitude 0.00000, longitude 0.00000.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Dec 2022

The latest completion date on record passed 3 years and 10 months ago.

Registered
14 Jan 2020
Promised
30 Dec 2022

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P4990002394514 Jan 202030 Dec 2022—M/S Shree Swami Samarth Traders Builders And DevelopersProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
R D Tower622

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

22 units registered

1BHK · 8 units2BHK · 8 unitsShop · 6 units
TypeCarpet areaUnits
1BHK37.11 sq m · 399 sq ft2
1BHK37.68 sq m · 406 sq ft2
1BHK41.63 sq m · 448 sq ft2
1BHK43.44 sq m · 468 sq ft2
2BHK46.12 sq m · 496 sq ft2
2BHK46.88 sq m · 505 sq ft2
2BHK49.12 sq m · 529 sq ft2
2BHK52.85 sq m · 569 sq ft2
Show all 11 unit rowsShow fewer unit rows
TypeCarpet areaUnits
Shop8.07 sq m · 87 sq ft1
Shop10.94 sq m · 118 sq ft4
Shop11.39 sq m · 123 sq ft1

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00001
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

R D Tower

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyAS PER PERMISSION100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)AS PER PERMISSION100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingAS PER PERMISSION100%
  • Street LightingNot applicable
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingAS PER PERMISSION100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

21 documents held by Deedo, 33 filings listed on MahaRERA's project page

Title report

Commencement certificate

Form B (2)

Allotment letter (3)

Encumbrance details (3)

Show all 54 documentsShow fewer documents

Encumbrance details (3)

Registration certificate

Form 1

Form 2

Occupancy / completion certificate

  • Occupancy / completion certificate16 Sep 2022ViewSource

Other (4)

Form 2A

Layout plan

Building plan

Document library

  • Copy of the legal title reportSearch Report.pdf · uploaded 2 Dec 2019View
  • Copy of Layout Approval (in case of layout)Layout-converted.pdf · uploaded 2 Dec 2019View
  • Commencement Certificates / NA Order for plotted developmentCommencement Cert-converted.pdf · uploaded 2 Dec 2019View
  • Declaration in FORM BForm B LAnd Owner.pdf · uploaded 4 Dec 2019View
  • Proforma of Allotment letterProforma_allotment_letter.pdf · uploaded 13 Dec 2019View
  • Proforma of Allotment letterAgreement_for_Sale_Format.pdf · uploaded 13 Dec 2019View
  • Declaration in FORM BFORM B SCAN-converted.pdf · uploaded 17 Dec 2019View
  • Building Plan Approval / NA Order for plotted developmentBuilding plan.pdf · uploaded 8 Jan 2020View
  • Details of encumbrances1 Enc Certificate-converted.pdf · uploaded 8 Jan 2020View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOccupation Cert.pdf · uploaded 16 Sep 2022View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate_compressed.pdf · uploaded 16 Sep 2022View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate_compressed.pdf · uploaded 16 Sep 2022View
  • a Details of encumbrances concerned to FinanceEncumbrance.pdf · uploaded 3 Dec 2024View
  • b Details of encumbrances concerned to LegalEncumbrance.pdf · uploaded 3 Dec 2024View
  • Disclosure of sold/ booked inventorySold Unsold Inventory RD.pdf · uploaded 3 Dec 2024Source
  • Declaration about Commencement CertificateDeclaration about Commencement RD.pdf · uploaded 3 Dec 2024Source
  • Deviation Report with respect to Allotment letterDeviation Report Allotment.pdf · uploaded 3 Dec 2024View
  • Deviation Report with respect to model copy of AgreementDeviation Report RD.pdf · uploaded 3 Dec 2024View
  • Declaration about all RERA Designated Bank Accounts (Format A)Bank Account Declaration.pdf · uploaded 3 Dec 2024View
  • a Details of encumbrances concerned to FinanceDetails of Encumerances.pdf · uploaded 5 Dec 2024View
  • b Details of encumbrances concerned to LegalDetails of Encumerances.pdf · uploaded 5 Dec 2024View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2A_2020.pdf · uploaded 5 Dec 2024Source
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A_2021.pdf · uploaded 5 Dec 2024Source
  • Disclosure of sold/ booked inventorySold Unsold Inv.pdf · uploaded 5 Dec 2024Source
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A_2022.pdf · uploaded 5 Dec 2024View
  • Architect’s Certificate on Completion of Project (Form 4)Form 4-R D Tower.pdf · uploaded 30 Jan 2025Source

Promoter documents

  • Legal Title reportSearch Report.pdf · uploaded 2 Dec 2019View
  • Declaration Form BForm B LAnd Owner.pdf · uploaded 4 Dec 2019View
  • Declaration Form BFORM B SCAN-converted.pdf · uploaded 17 Dec 2019View

Technical documents

  • Layout ApprovalLayout-converted.pdfView
  • Building Plan ApprovalBuilding plan.pdfView

Proforma allotment letter

  • Proforma allotment letterProforma_allotment_letter.pdfView
  • Proforma allotment letterSource

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

Survey, CTS, gat or plot numbers

431/3B PLOT NO 70431/3B PLOT NO 70at Chalisgaon

As published on MahaRERA's project page

431/3B PLOT NO 70

Boundaries

North
18 Meter Wide Road
South
Plot No 56 And 57
East
Adjacentsurvey No 430
West
Plot No 69

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectBhavsar And Associates—
Chartered accountantYash Nagar—
EngineerAhmad Wafa Ansari—
OtherRajendra Kumawat—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology