Swami Pushpa Apartment

Completed

Chalisgaon, Jalgaon 424101 |Promoter: Poonam Ramesh Deore

8 Jun 2020Registered with MahaRERA
30 Dec 2022Promised completion
1Building
15Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Completed
Buildings
1
Unit types
1BHK, Shop15 units in all
Land area for this project
444 sq m (4,775 sq ft)
Permissible built-up area
497 sq m (5,348 sq ft)
Sanctioned built-up area
497 sq m (5,348 sq ft)
Address
Final Plot No 25/1, Hirapur Road, Dhoodh Sagar MargPIN 424101
Designated bank account
Hdfc Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
Swami Pushpa Apartment is at latitude 0.00000, longitude 0.00000.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Dec 2022

The latest completion date on record passed 3 years and 10 months ago.

Registered
8 Jun 2020
Promised
30 Dec 2022

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P499000255098 Jun 202030 Dec 2022—Poonam Ramesh DeoreProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Swami Pushpa Apartment415

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

15 units registered

1BHK · 10 unitsShop · 5 units
TypeCarpet areaUnits
1BHK47.67 sq m · 513 sq ft1
1BHK47.71 sq m · 514 sq ft1
1BHK50.92 sq m · 548 sq ft1
1BHK50.93 sq m · 548 sq ft1
1BHK50.96 sq m · 549 sq ft2
1BHK50.97 sq m · 549 sq ft1
1BHK56.28 sq m · 606 sq ft1
1BHK56.32 sq m · 606 sq ft2
Shop12.97 sq m · 140 sq ft5

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00000
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Swami Pushpa Apartment

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure50%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyBOREWELL AND CMC CONNECTION0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)NO STP0%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingONLY TREE PLANTING0%
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingONLY RAIN WATER HARVESTING0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationONLY ELECTRICAL METER BOARD0%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

10 documents held by Deedo, 15 filings listed on MahaRERA's project page

Title

Encumbrance

Form b

Registration certificate

Others

Layout plan

Allotment letter

Document library

  • Copy of the legal title reportTitle Report.pdf · uploaded 29 May 2020View
  • OtherGST Certificate.pdf · uploaded 29 May 2020View
  • Details of encumbrances3 Encumbrance Certificate.pdf · uploaded 31 May 2020View
  • Copy of Layout Approval (in case of layout)5 Building Plan.pdf · uploaded 31 May 2020View
  • Building Plan Approval / NA Order for plotted development5 Building Plan.pdf · uploaded 31 May 2020View
  • Commencement Certificates / NA Order for plotted development6 Commencement Certificate.pdf · uploaded 31 May 2020Source
  • Proforma of Allotment letter14 Allotment Letter.pdf · uploaded 1 Jun 2020Source
  • Declaration in FORM B7 Promoter FORM-B.pdf · uploaded 2 Jun 2020View
  • Proforma of Allotment letterAgreement Draft.pdf · uploaded 2 Jun 2020View

Promoter documents

  • Legal Title reportTitle Report.pdf · uploaded 29 May 2020View
  • Declaration Form B7 Promoter FORM-B.pdf · uploaded 2 Jun 2020View

Technical documents

  • Layout Approval5 Building Plan.pdfView
  • Building Plan Approval5 Building Plan.pdfView

Other legal documents

  • OtherGST Certificate.pdfView

Proforma allotment letter

  • Proforma allotment letterAgreement Draft.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Chalisgaon, Chalisgaon taluka

Survey, CTS, gat or plot numbers

25/1FINAL PLOT NO 25/1

As published on MahaRERA's project page

FINAL PLOT NO 25/1

Boundaries

North
Open Plot
South
Road
East
Plot No 2 And Colony Road
West
Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectPrashant R Deshmiukh—
Chartered accountantCa Yogesh Tatar—
EngineerAshitosh P Tidake—
OtherJayesh Arun Wagh—
OtherYogesh Rajendra Beldar—

Source: MahaRERA project page. Contact details are not shown.