Krushnaworld City

Completed

Chalisgaon, Jalgaon 424101 |Promoter: Global Builders And Developers

Residential / Group HousingRERAP49900014135
9 Nov 2017Registered with MahaRERA
31 Dec 2017Promised completion
10Buildings
10Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
10
Unit types
Residential10 units in all
Land area for this project
726 sq m (7,813 sq ft)
Permissible built-up area
726 sq m (7,813 sq ft)
Sanctioned built-up area
726 sq m (7,813 sq ft)
Address
Plot No.19/22/1 To19/22/08, S.no.421/1PIN 424101
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 15.68081, 73.97713
Krushnaworld City is at latitude 15.68081, longitude 73.97713.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2017

The latest completion date on record passed 8 years and 10 months ago.

Registered
9 Nov 2017
Promised
31 Dec 2017

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P499000141359 Nov 201731 Dec 2017—Global Builders And DevelopersProject page

10 buildings

Buildings and wings named in the registration

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

10 units registered

Residential · 10 units
BuildingTypeCarpet areaUnits
Row House 1Residential53.69 sq m · 578 sq ft1
Row House 10Residential53.69 sq m · 578 sq ft1
Row House 2Residential53.69 sq m · 578 sq ft1
Row House 3Residential58.84 sq m · 633 sq ft1
Row House 4Residential58.84 sq m · 633 sq ft1
Row House 5Residential58.84 sq m · 633 sq ft1
Row House 6Residential58.84 sq m · 633 sq ft1
Row House 7Residential58.84 sq m · 633 sq ft1
Row House 8Residential58.84 sq m · 633 sq ft1
Row House 9Residential53.69 sq m · 578 sq ft1

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
Row House 1Closed/Covered00000
Row House 1Open Space00000
Row House 10Closed/Covered00000
Row House 10Open Space00000
Row House 2Closed/Covered00000
Row House 2Open Space00000
Row House 3Closed/Covered00000
Row House 3Open Space00000
Row House 4Closed/Covered00000
Row House 4Open Space00000
Row House 5Closed/Covered00000
Row House 5Open Space00000
Row House 6Closed/Covered00000
Row House 6Open Space00000
Row House 7Closed/Covered00000
Row House 7Open Space00000
Row House 8Closed/Covered00000
Row House 8Open Space00000
Row House 9Closed/Covered00000
Row House 9Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Row House 1

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
  • Sanitary Fittings within the flats / premises70%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%

Row House 10

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
  • Sanitary Fittings within the flats / premises70%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%

Row House 2

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
  • Sanitary Fittings within the flats / premises70%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%

Row House 3

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
  • Sanitary Fittings within the flats / premises70%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%

Row House 4

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
  • Sanitary Fittings within the flats / premises70%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%

Row House 5

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
  • Sanitary Fittings within the flats / premises70%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%

Row House 6

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
  • Sanitary Fittings within the flats / premises70%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%

Row House 7

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
  • Sanitary Fittings within the flats / premises70%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%

Row House 8

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
  • Sanitary Fittings within the flats / premises70%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%

Row House 9

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
  • Sanitary Fittings within the flats / premises70%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%

Common areas and amenities

  • Internal Roads & FootpathsIN PROGRESS50%
  • Water SupplyIN PROGRESS0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)IN PROGRESS80%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingIN PROGRESS50%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationIN PROGRESS70%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

20 documents held by Deedo, 23 filings listed on MahaRERA's project page

Title

Form bs

Form 1

Form 2

Registration certificate

Form 5s

Completions

Form 4

Others

Layout plan

Building plan

Allotment letter

Document library

  • Copy of the legal title reportTITLE [SEARCH] REPORT1.pdf · uploaded 8 Sep 2017View
  • Declaration in FORM BFORM -B.pdf · uploaded 8 Sep 2017View
  • Building Plan Approval (IOD)BUILDING PLAN.pdf · uploaded 8 Sep 2017View
  • Details of encumbrancesFORM -B.pdf · uploaded 8 Sep 2017View
  • Proforma of Allotment letterALLOTMENT LETTER (1).pdf · uploaded 30 Sep 2017View
  • Declaration in FORM BAFFIDAVIT.pdf · uploaded 30 Sep 2017View
  • Copy of Layout Approval (in case of layout)LAY OUT PLAN (1).pdf · uploaded 30 Sep 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCHITECT'S CERTIFICATE1.pdf · uploaded 3 Oct 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENGINEER'SCERTIFICATE 1.pdf · uploaded 3 Oct 2017View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)ANNUAL REPORT.pdf · uploaded 16 Dec 2019View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOCCUPANCY CERTIFICATE.pdf · uploaded 16 Dec 2019View
  • Architect’s Certificate on Completion of Project (Form 4)FORM 4.pdf · uploaded 16 Dec 2019View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)RERA AUDIT REPORT 1718.pdf · uploaded 16 Dec 2019View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentCOMPLETION CERTIFICATE.pdf · uploaded 16 Dec 2019View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)MAHA RERA AUDIT REPORT.pdf · uploaded 18 May 2020View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Notes to RERA Report.pdf · uploaded 18 May 2020View
  • Status of Formation of Legal Entity (Society/Co Op etc.)FORMATION OF LEGAL ENTITY_compressed.pdf · uploaded 3 Sep 2021View

Promoter documents

  • Legal Title reportTITLE [SEARCH] REPORT1.pdf · uploaded 8 Sep 2017View
  • Declaration Form BFORM -B.pdf · uploaded 8 Sep 2017View
  • Declaration Form BAFFIDAVIT.pdf · uploaded 30 Sep 2017View

Technical documents

  • Building Plan ApprovalBUILDING PLAN.pdfView
  • Layout ApprovalLAY OUT PLAN (1).pdfView

Proforma allotment letter

  • Proforma allotment letterALLOTMENT LETTER (1).pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Chalisgaon, Chalisgaon taluka

Survey, CTS, gat or plot numbers

421/1PLOT NO.19/22/1 TO19/22/08S.NO.421/1

As published on MahaRERA's project page

PLOT NO.19/22/1 TO19/22/08,S.NO.421/1

Boundaries

North
Road
South
Road
East
Open Space
West
Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectNiraj R Mantri—
EngineerNilesh S Kankariya—
OtherPrasad Laxman Beldar—

Source: MahaRERA project page. Contact details are not shown.