BLD_007094Completed9 floors
Venkatesh Dream Hub Wing A · Venkatesh Dream Hub
Dhule (M Corp.) · RERA P49800032033
9Sanctioned habitable floorsregistration certificate
30 Jun 2023Promised completion
Floors
9 sanctioned habitable floors, as registered. MahaRERA doesn't publish flat-by-flat records, so floors are shown without flats.
As registered
- Sanctioned habitable floors
- 9
Unit inventory
Apartments and other units by type, from MahaRERA's project page.
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| Office | 9.9 m² (107 sq.ft) | 5 | not published |
| Office | 12.7 m² (137 sq.ft) | 5 | not published |
| Office | 19.1 m² (206 sq.ft) | 5 | not published |
| Office | 23.8 m² (256 sq.ft) | 34 | not published |
| Office | 26.4 m² (284 sq.ft) | 5 | not published |
| Office | 33.9 m² (365 sq.ft) | 2 | not published |
| Office | 38.2 m² (411 sq.ft) | 2 | not published |
| Shop | 12.7 m² (137 sq.ft) | 1 | not published |
| Shop | 14.2 m² (153 sq.ft) | 1 | not published |
| Shop | 15.7 m² (169 sq.ft) | 1 | not published |
| Shop | 20.7 m² (223 sq.ft) | 6 | not published |
| Shop | 21.4 m² (230 sq.ft) | 1 | not published |
| Shop | 22.9 m² (246 sq.ft) | 2 | not published |
| Shop | 23 m² (248 sq.ft) | 1 | not published |
| Shop | 29 m² (313 sq.ft) | 1 | not published |
| Total | 72 |
Parking
Spaces as declared on MahaRERA's project page.
| Type | Two-wheeler | Four-wheeler | Visitor | Total |
|---|---|---|---|---|
| Closed/Covered | 0 | 0 | 0 | 32 |
| Open Space | 0 | 0 | 0 | 0 |
Construction progress
Work completed on this building, as the promoter reported it to MahaRERA (Form 1).
- Excavation100%
- Basement (if any)100%
- Podiums (if any)0%
- Plinth100%
- Stilt Floor0%
- Slabs of Super Structure100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
- Sanitary Fittings within the flats / premises100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Data through9 Oct 2026SourcesMahaRERA registration certificate · MahaRERA project pageFloors and units are as registered; a promoter can revise them in later filings.Methodology