BLD_006336Not yet due6 floors

Samata Tower · Samata Tower

Dhule (M Corp.) · RERA P49800079214

6Sanctioned habitable floorsregistration certificate
30 Aug 2027Promised completion

Floors

6 sanctioned habitable floors, as registered. MahaRERA doesn't publish flat-by-flat records, so floors are shown without flats.

As registered

RERA registration
P49800079214 · registered 17 Feb 2025
Promised completion
30 Aug 2027
Sanctioned habitable floors
6

Unit inventory

Apartments and other units by type, from MahaRERA's project page.

TypeCarpet areaUnitsBooked
3BHK67 m² (721 sq.ft)1not published
3BHK67.1 m² (722 sq.ft)1not published
3BHK73.7 m² (794 sq.ft)1not published
3BHK73.8 m² (794 sq.ft)1not published
3BHK95.5 m² (1,028 sq.ft)2not published
3BHK96.8 m² (1,042 sq.ft)6not published
Office space35.7 m² (384 sq.ft)2not published
Office space35.7 m² (384 sq.ft)2not published
Office space44.3 m² (477 sq.ft)4not published
Office space52.6 m² (566 sq.ft)2not published
Office space63.4 m² (683 sq.ft)2not published
Office space63.6 m² (685 sq.ft)2not published
Shop17.9 m² (192 sq.ft)4not published
Shop20.5 m² (221 sq.ft)1not published
Shop20.9 m² (225 sq.ft)4not published
Shop21.8 m² (235 sq.ft)2not published
Shop24.1 m² (259 sq.ft)2not published
Shop24.1 m² (260 sq.ft)2not published
Shop24.9 m² (268 sq.ft)1not published
Shop26.3 m² (283 sq.ft)2not published
Shop26.4 m² (284 sq.ft)2not published
Shop26.7 m² (287 sq.ft)2not published
Shop27.7 m² (299 sq.ft)1not published
Shop29.9 m² (322 sq.ft)1not published
Shop30.3 m² (326 sq.ft)1not published
Shop30.7 m² (330 sq.ft)1not published
Shop33.2 m² (358 sq.ft)1not published
Shop33.6 m² (361 sq.ft)1not published
Total54

Parking

Spaces as declared on MahaRERA's project page.

TypeTwo-wheelerFour-wheelerVisitorTotal
Closed/Covered000126
Open Space0000

Construction progress

Work completed on this building, as the promoter reported it to MahaRERA (Form 1).

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Data through9 Oct 2026SourcesMahaRERA registration certificate · MahaRERA project pageFloors and units are as registered; a promoter can revise them in later filings.Methodology