BLD_006181Promised date passed7 floors

Padmashree Residency V · Padmashree Residency V

Dhule (M Corp.) · RERA P49800024259

7Sanctioned habitable floorsregistration certificate
30 Dec 2023Promised completion

Floors

7 sanctioned habitable floors, as registered. MahaRERA doesn't publish flat-by-flat records, so floors are shown without flats.

As registered

RERA registration
P49800024259 · registered 29 Jan 2020
Promised completion
30 Dec 2023
Sanctioned habitable floors
7

Unit inventory

Apartments and other units by type, from MahaRERA's project page.

TypeCarpet areaUnitsBooked
2BHK33.8 m² (364 sq.ft)16not published
Shop6.1 m² (66 sq.ft)1not published
Shop6.2 m² (67 sq.ft)1not published
Shop6.2 m² (67 sq.ft)1not published
Shop6.3 m² (68 sq.ft)2not published
STORAGE6.1 m² (66 sq.ft)1not published
STORAGE6.2 m² (67 sq.ft)1not published
STORAGE6.2 m² (67 sq.ft)1not published
STORAGE6.3 m² (68 sq.ft)2not published
Total26

Parking

Spaces as declared on MahaRERA's project page.

TypeTwo-wheelerFour-wheelerVisitorTotal
Closed/Covered0001
Open Space0000

Construction progress

Work completed on this building, as the promoter reported it to MahaRERA (Form 1).

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Data through8 Oct 2026SourcesMahaRERA registration certificate · MahaRERA project pageFloors and units are as registered; a promoter can revise them in later filings.Methodology