Mangalmurti Residency

Lapsed

Dhule (M Corp.), Dhule 424001 |Promoter: Sumit Sanjay Korake

Residential / Group HousingRERAP49800022364
16 Sep 2019Registered with MahaRERA
1 Oct 2020Promised completion
5 Apr 2021Revised completionPushed back 6 months
1Building
14Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Lapsed
Buildings
1
Unit types
1BHK14 units in all
Land area for this project
457 sq m (4,919 sq ft)
Permissible built-up area
639 sq m (6,874 sq ft)
Sanctioned built-up area
639 sq m (6,874 sq ft)
Address
Cts No 8260, Survey No 483/2, Plot No 34, 100 Ft Road, Korake Nagar, Malegaon Road, Near Vishwakarma Bhavan, DhulePIN 424001
Designated bank account
Jalgaon Janata Sahakari Bank Limited
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.21833, 72.97809
Mangalmurti Residency is at latitude 19.21833, longitude 72.97809.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 6 months

The latest completion date on record passed 5 years and 6 months ago.

Registered
16 Sep 2019
Promised
1 Oct 2020
Revised
5 Apr 2021

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P4980002236416 Sep 20191 Oct 20205 Apr 2021Sumit Sanjay KorakeProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Mangalmurti Residency814

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

14 units registered

1BHK · 14 units
TypeCarpet areaUnits
1BHK40.01 sq m · 431 sq ft7
1BHK44.75 sq m · 482 sq ft7

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00003
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Mangalmurti Residency

  • Excavation10%
  • Basement (if any)20%
  • Podiums (if any)0%
  • Plinth20%
  • Stilt Floor15%
  • Slabs of Super Structure15%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises5%
  • Sanitary Fittings within the flats / premises5%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.15%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyCORORATION DRINKING WATER APPROVED & PIPE LINE RE25%
  • Sewerage (Chamber, Lines, Septic Tank , STP)WORK DONE100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingWORK IN PROGRESS20%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingOPEN PARKING WORK IN PROGRESS60%
  • LIFT CCTV CAMERA FACILITYWORK IN PROGRESS0%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

15 documents held by Deedo, 18 filings listed on MahaRERA's project page

Commencement certificates

Title

Allotment letters

Encumbrance

Form b

Extension certificate

Registration certificate

Others

Layout plan

Building plans

Document library

  • Commencement Certificates / NA Order for plotted developmentPLINTH COMPLITION CERTIFCATE CORPN.pdf · uploaded 5 Apr 2019View
  • Commencement Certificates / NA Order for plotted developmentPERIOD EXTENSION CERTIFICATE.pdf · uploaded 26 Jun 2019View
  • Copy of the legal title reportTITLE REPORT.pdf · uploaded 26 Jun 2019View
  • Proforma of Agreement for saleALLOTMENT LETTER.pdf · uploaded 26 Jun 2019View
  • Proforma of Allotment letterALLOTMENT LETTER.pdf · uploaded 26 Jun 2019View
  • Proforma of Allotment letterANNEXURE A AFS.pdf · uploaded 26 Jun 2019View
  • Building Plan Approval (IOD)BAP2.pdf · uploaded 26 Jun 2019View
  • Building Plan Approval (IOD)BAP3.pdf · uploaded 26 Jun 2019View
  • Details of encumbrancesNO ENCUMNBARANCE CERT.pdf · uploaded 8 Jul 2019View
  • Declaration in FORM BFORM B SIGN.pdf · uploaded 8 Jul 2019View
  • Copy of Layout Approval (in case of layout)LAYOUT.pdf · uploaded 8 Jul 2019View
  • Commencement Certificates / NA Order for plotted developmentBandhkam mudatvadh.pdf · uploaded 16 Oct 2020View

Promoter documents

  • Legal Title reportTITLE REPORT.pdf · uploaded 26 Jun 2019View
  • Declaration Form BFORM B SIGN.pdf · uploaded 8 Jul 2019View

Technical documents

  • Layout ApprovalLAYOUT.pdfView
  • Building Plan ApprovalBAP2.pdfView
  • Building Plan ApprovalBAP3.pdfView

Proforma allotment letter

  • Proforma allotment letterANNEXURE A AFS.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Dhule (M Corp.), Dhule taluka

Survey, CTS, gat or plot numbers

34483/28260CTS NO 8260PLOT NO 34SURVEY NO 483/2

As published on MahaRERA's project page

CTS NO 8260, SURVEY NO 483/2, PLOT NO 34

Boundaries

North
Road
South
Open Space
East
Plot No 35
West
Plot No 33

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectEr Jayesh P Shinde—
Chartered accountantDarshan Ramesh Jain—
EngineerEr Jayesh P Shinde—
OtherChagan Gugul Shelar—
OtherManish Sonar—
OtherManjur Mistry—

Source: MahaRERA project page. Contact details are not shown.