Gokul Apartment

Completed

Dhule (M Corp.), Dhule 424001 |Promoter: Pundlik Gokul Sutar

1 Sep 2017Registered with MahaRERA
31 Mar 2018Promised completion
31 Mar 2019Revised completionPushed back 1 year
1Building
27Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Completed
Buildings
1
Unit types
1 BHK, 2 BHK, 2BHK, 3 BHK, Shop27 units in all
Land area for this project
921 sq m (9,918 sq ft)
Permissible built-up area
921 sq m (9,916 sq ft)
Sanctioned built-up area
921 sq m (9,916 sq ft)
Address
Cts No.9588 Survey No 488/2/4 Plot No 1 Plus 2PIN 424001
Designated bank account
Icici Bank Limited
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.02834, 73.03758
Gokul Apartment is at latitude 19.02834, longitude 73.03758.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 1 year

The latest completion date on record passed 7 years and 7 months ago.

Registered
1 Sep 2017
Promised
31 Mar 2018
Revised
31 Mar 2019

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P498000119691 Sep 201731 Mar 201831 Mar 2019Pundlik Gokul SutarProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Gokul Apartment527

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

27 units registered

1 BHK · 3 units2 BHK · 6 units2BHK · 12 units3 BHK · 2 unitsShop · 4 units
TypeCarpet areaUnits
1 BHK16 sq m · 172 sq ft1
1 BHK24.2 sq m · 260 sq ft2
2 BHK39.45 sq m · 425 sq ft6
2BHK39.13 sq m · 421 sq ft12
3 BHK58.45 sq m · 629 sq ft2
Shop9.6 sq m · 103 sq ft1
Shop13.65 sq m · 147 sq ft2
Shop17 sq m · 183 sq ft1

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00001
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Gokul Apartment

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyWORK DONE100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)WORK DONE100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingWORK DONE100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

13 documents held by Deedo, 15 filings listed on MahaRERA's project page

Title

Commencement certificate

Form b

Form 1

Form 2

Encumbrance

Registration certificate

Extension certificate

Form 4

Other

Layout plan

Building plan

Allotment letter

Document library

  • Copy of the legal title reportTitle Report.pdf · uploaded 14 Aug 2017View
  • Copy of Layout Approval (in case of layout)Layout.pdf · uploaded 14 Aug 2017View
  • Declaration in FORM BForm-B.pdf · uploaded 14 Aug 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate.pdf · uploaded 14 Aug 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate.pdf · uploaded 14 Aug 2017View
  • Proforma of Allotment letterAgreement For Sale.pdf · uploaded 14 Aug 2017View
  • Building Plan Approval (IOD)Building Plan.pdf · uploaded 14 Aug 2017View
  • Commencement Certificates / NA Order for plotted developmentCommencement certificate.pdf · uploaded 14 Aug 2017View
  • Details of encumbrancesEncumbrance Certificate.pdf · uploaded 15 Aug 2017View
  • Architect’s Certificate on Completion of Project (Form 4)Form-4.pdf · uploaded 24 Aug 2020View

Promoter documents

  • Legal Title reportTitle Report.pdf · uploaded 14 Aug 2017View
  • Declaration Form BForm-B.pdf · uploaded 14 Aug 2017View

Technical documents

  • Layout ApprovalLayout.pdfView
  • Building Plan ApprovalBuilding Plan.pdfView

Proforma allotment letter

  • Proforma allotment letterAgreement For Sale.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Dhule (M Corp.), Dhule taluka

Survey, CTS, gat or plot numbers

488/2/49588CTS NO.9588 SURVEY NO 488/2/4 PLOT NO 1 PLUS 2

As published on MahaRERA's project page

CTS NO.9588 SURVEY NO 488/2/4 PLOT NO 1 PLUS 2

Boundaries

North
Chakkarbardi Road
South
30 Mtr Road
East
S No 488 Oblick 2
West
S No 488 Oblick 1

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectMahesh S Bagul—
EngineerYogesh P Deore—

Source: MahaRERA project page. Contact details are not shown.