COnstruction of 256EWS T/s and 64 Shops under PMAY scheme no S.No.471,477,478 Chalisgaon Road,Dhule

Completed

Dhule (M Corp.), Dhule 424001 |Promoter: Nashik Housing & Area Development Board

Residential / Group HousingRERAP49800019755
5 Mar 2019Registered with MahaRERA
30 Mar 2025Promised completion
4Buildings
320Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
4
Unit types
Ews, Shop, Shops320 units in all
Land area for this project
7,476 sq m (80,471 sq ft)
Permissible built-up area
12,863 sq m (1,38,453 sq ft)
Sanctioned built-up area
12,863 sq m (1,38,453 sq ft)
Address
47, 477, 478, Chalisgaon Road, Pawan nagarPIN 424001
Designated bank account
Bank Of Maharashtra
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 20.90422, 74.77490
COnstruction of 256EWS T/s and 64 Shops under PMAY scheme no S.No.471,477,478 Chalisgaon Road,Dhule is at latitude 20.90422, longitude 74.77490.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Mar 2025

The latest completion date on record passed 1 year and 7 months ago.

Registered
5 Mar 2019
Promised
30 Mar 2025

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P498000197555 Mar 201930 Mar 2025—Nashik Housing & Area Development BoardProject page

4 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Type A6100
Type B680
Type Ci670
Type Cii670

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

320 units registered

Ews · 256 unitsShop · 36 unitsShops · 28 units
BuildingTypeCarpet areaUnits
Type AEws29.13 sq m · 314 sq ft80
Type AShop13.02 sq m · 140 sq ft20
Type BEws29.13 sq m · 314 sq ft64
Type BShop13.02 sq m · 140 sq ft16
Type CiEws29.13 sq m · 314 sq ft56
Type CiShops13.02 sq m · 140 sq ft14
Type CiiEws29.13 sq m · 314 sq ft56
Type CiiShops13.02 sq m · 140 sq ft14

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
Type AClosed/Covered00001
Type AOpen Space000015
Type BClosed/Covered00001
Type BOpen Space00000
Type CiClosed/Covered00001
Type CiOpen Space00000
Type CiiClosed/Covered00001
Type CiiOpen Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Type A

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Type B

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Type Ci

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Type Cii

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water Supplywork not yet started0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Work not yet started0%
  • Storm Water DrainsWork not yet started0%
  • Landscaping & Tree PlantingWork not yet started0%
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingWork not yet started0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationWork not yet started0%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingWork not yet started0%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

13 documents held by Deedo, 25 filings listed on MahaRERA's project page

Title

Encumbrance

Commencement certificate

Form b

Form 5

Registration certificate

Others

Layout plan

Building plans

Allotment letter

Document library

  • Copy of the legal title reportTitel Clearance.pdf · uploaded 6 Feb 2019View
  • Details of encumbrancesNonEncumbarance.pdf · uploaded 6 Feb 2019View
  • Proforma of Allotment letterAllotment letter.pdf · uploaded 6 Feb 2019View
  • Commencement Certificates / NA Order for plotted developmentCommesment.pdf · uploaded 6 Feb 2019View
  • Copy of Layout Approval (in case of layout)Layout.pdf · uploaded 7 Feb 2019View
  • Building Plan Approval (IOD)S NO 471 477 AND 478 CHALISGAON ROAD DHULE.pdf · uploaded 16 Feb 2019View
  • Building Plan Approval (IOD)S NO 471 477 CHALISGAON ROAD DHULE.pdf · uploaded 16 Feb 2019View
  • Building Plan Approval (IOD)CCChalisgaonRoad.pdf · uploaded 16 Feb 2019View
  • Declaration in FORM BForm B_Noterized.pdf · uploaded 25 Feb 2019View
  • Declaration about Commencement CertificateDeclaration.pdf · uploaded 29 Jul 2021View
  • Architect’s Certificate on Completion of Project (Form 4)Declaration.pdf · uploaded 29 Jul 2021View
  • Status of Formation of Legal Entity (Society/Co Op etc.)Declaration.pdf · uploaded 29 Jul 2021View
  • Architect’s Certificate on Completion of Project (Form 4)Declaration.pdf · uploaded 29 Jul 2021View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Declaration.pdf · uploaded 29 Jul 2021View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Declaration.pdf · uploaded 29 Jul 2021View
  • Status of ConveyanceDeclaration.pdf · uploaded 29 Jul 2021View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Declaration.pdf · uploaded 29 Jul 2021View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Declaration.pdf · uploaded 29 Jul 2021View

Promoter documents

  • Legal Title reportTitel Clearance.pdf · uploaded 6 Feb 2019View
  • Declaration Form BForm B_Noterized.pdf · uploaded 25 Feb 2019View

Technical documents

  • Layout ApprovalLayout.pdfView
  • Building Plan ApprovalS NO 471 477 AND 478 CHALISGAON ROAD DHULE.pdfView
  • Building Plan ApprovalS NO 471 477 CHALISGAON ROAD DHULE.pdfView
  • Building Plan ApprovalCCChalisgaonRoad.pdfView

Proforma allotment letter

  • Proforma allotment letterAllotment letter.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Dhule (M Corp.), Dhule taluka

Survey, CTS, gat or plot numbers

47477478

As published on MahaRERA's project page

47,477,478

Boundaries

North
MHADAplot
South
Temple
East
Chalisgaon Road
West
MHADA colony

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectShriprakash Vitthal Bhandari—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology