Geetaban Residency Phase-2

Lapsed

Sawangi, Aurangabad 423702 |Promoter: Bhaishree Ventures LLP

Residential / Group HousingRERAP51500025486
8 Jun 2020Registered with MahaRERA
30 Sep 2023Promised completion
31 Mar 2024Revised completionPushed back 6 months
2Buildings
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Lapsed
Buildings
2
Land area for this project
1,043 sq m (11,231 sq ft)
Permissible built-up area
1,292 sq m (13,910 sq ft)
Sanctioned built-up area
1,292 sq m (13,910 sq ft)
Planning authority
ASST DIRECTOR TOWN PLANNONG CHHATRAPATI SAMBHAJI NGAR
Address
Plot No 2/65 And 2/70, Lasur Station Road, Lasur StationPIN 423702
Designated bank account
Icici Bank Limited
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.92361, 75.01630
Geetaban Residency Phase-2 is at latitude 19.92361, longitude 75.01630.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 6 months

The latest completion date on record passed 2 years and 7 months ago.

Registered
8 Jun 2020
Promised
30 Sep 2023
Revised
31 Mar 2024

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P515000254868 Jun 202030 Sep 202331 Mar 2024Bhaishree Ventures LLPProject page

2 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
R H No C-1 To C-84—
R H No D-1 To D-83—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
R H No C-1 To C-8Closed/Covered00101
R H No C-1 To C-8Open Space00000
R H No D-1 To D-8Closed/Covered00000
R H No D-1 To D-8Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

R H No C-1 To C-8

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

R H No D-1 To D-8

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Common areas and amenities

  • Internal Roads & FootpathsAS PER DRAWING100%
  • Water SupplyAS PER DRAWING100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)NO STP0%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingONLY TREE PLANTING100%
  • Street LightingAS PER DRAWING100%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingONLY RAIN WATER HARVESTING100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationAS PER DRAWING0%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable
  • COMPOUND WALLCOMPLTED100%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

64 documents held by Deedo, 72 filings listed on MahaRERA's project page

Others

Registration certificate

Extension certificate

Document library

  • Copy of the legal title reportSerch Report.pdf · uploaded 16 Mar 2020View
  • Copy of Layout Approval (in case of layout)Revised Layout.pdf · uploaded 16 Mar 2020View
  • Building Plan Approval / NA Order for plotted developmentBuilding Permission.pdf · uploaded 16 Mar 2020View
  • Details of encumbrancesCertificate of Encumbrance.pdf · uploaded 16 Mar 2020View
  • Proforma of Allotment letterAllotment Letter.pdf · uploaded 16 Mar 2020View
  • Commencement Certificates / NA Order for plotted developmentNA Order.pdf · uploaded 16 Mar 2020View
  • Declaration in FORM BForm-B_compressed.pdf · uploaded 16 Mar 2020View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate.pdf · uploaded 20 Mar 2020View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate_compressed.pdf · uploaded 20 Mar 2020View
  • Proforma of Allotment letterATS RERA Draft.pdf · uploaded 29 May 2020View
  • Declaration about Commencement CertificateCOMMENCEMENT DECLARATION.pdf · uploaded 9 Feb 2022View
  • Disclosure of sold/ booked inventorySOLD UNSOLD JUN-21.pdf · uploaded 9 Feb 2022View
  • Disclosure of sold/ booked inventorySOLD UNSOLD SEPT-21.pdf · uploaded 9 Feb 2022View
  • Disclosure of sold/ booked inventorySOLD UNSOLD DEC-21.pdf · uploaded 9 Feb 2022View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)NA.pdf · uploaded 9 Feb 2022View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)NA.pdf · uploaded 9 Feb 2022View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)NA.pdf · uploaded 9 Feb 2022View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)NA.pdf · uploaded 9 Feb 2022View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)F-2 07-07-21_Compressed.pdf · uploaded 12 Feb 2022View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)F-2 07-10-21_Compressed.pdf · uploaded 12 Feb 2022View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)F-2 07-01-22_Compressed.pdf · uploaded 12 Feb 2022View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)F-1 JUN-21 GB-2.pdf · uploaded 11 Mar 2022View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)F-1 SEPT 21 GB-2.pdf · uploaded 11 Mar 2022View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)F-1 DEC-21 GB-2.pdf · uploaded 11 Mar 2022View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form5_2021_GeetabanResidency P-ll.pdf · uploaded 12 Mar 2022View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)F-2 GB-2.pdf · uploaded 30 May 2022View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form5_2122_Geetaban_P-ll.pdf · uploaded 5 Oct 2022View
  • Disclosure of sold/ booked inventoryGeetaban -II Q-4 21-22.pdf · uploaded 31 Dec 2022View
  • Disclosure of sold/ booked inventoryGeetaban -II Q-1 22-23.pdf · uploaded 31 Dec 2022View
  • Disclosure of sold/ booked inventoryGeetaban -II Q-2 22-23.pdf · uploaded 31 Dec 2022View
  • Declaration in FORM BFORM B UPDATED.pdf · uploaded 15 Sep 2023View
  • Disclosure of sold/ booked inventorySold Unsold GB JUNE-23.pdf · uploaded 15 Sep 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)SCAN ENGG CERTIFICATE GB-2 Q1 JUNE -22.pdf · uploaded 18 Sep 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)SCAN ENGG CERTIFICATE GB-2 Q2 SEP -22.pdf · uploaded 18 Sep 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)SCAN ENGG CERTIFICATE GB-2 Q3 DEC-22.pdf · uploaded 18 Sep 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)SCAN ENGG CERTIFICATE GB-2 Q4 MAR-23.pdf · uploaded 18 Sep 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)SCAN ENGG CERTIFICATE GB-2 Q1 JUNE -23.pdf · uploaded 18 Sep 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)SCAN FORM 2A 22-23.pdf · uploaded 20 Sep 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)FORM 2A 20-21.pdf · uploaded 20 Sep 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)FORM 2A 21-22.pdf · uploaded 20 Sep 2023View
  • Disclosure of sold/ booked inventorySEPTEMBER-23.pdf · uploaded 27 Nov 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)F-2 SEPT-23.pdf · uploaded 27 Nov 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)architect cert F-1 GB-2 FOR June-22.pdf · uploaded 27 Nov 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)architect cert F-1 GB-2 FOR Sep-22.pdf · uploaded 27 Nov 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)architect cert F-1 GB-2 FOR Dec-22.pdf · uploaded 27 Nov 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)architect cert F-1 GB-2 FOR Dec-22.pdf · uploaded 27 Nov 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)architect cert F-1 GB-2 FOR March-23.pdf · uploaded 27 Nov 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)architect cert F-1 GB-2 FOR March-23.pdf · uploaded 27 Nov 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)SCAN GB -2 Q1JUNE-23 2023-24.pdf · uploaded 27 Nov 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)SCAN GB -2 Q1JUNE-23 2023-24.pdf · uploaded 27 Nov 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)10 F-1 SEP-23.pdf · uploaded 24 Jan 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)11 F-1 DEC-23.pdf · uploaded 24 Jan 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)12 F-2 Q-3 23-24.pdf · uploaded 24 Jan 2024View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Geetaban Phase -2 Form-5 2022-23.pdf · uploaded 9 Feb 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)12 F-1 MAR-24.pdf · uploaded 3 May 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)13 F-2 Q-4 23-24.pdf · uploaded 3 May 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)13 F-1 JUNE-24.pdf · uploaded 29 Nov 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)14 F-1 SEP-24.pdf · uploaded 29 Nov 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)14 F-1 SEP-24.pdf · uploaded 29 Nov 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)15 F-1 DEC-24.pdf · uploaded 29 Jan 2025View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)04 FORM 2A 23-24.pdf · uploaded 29 Jan 2025View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form5_2324_BhaishreeVenturesLLPGeetabanPhase2.pdf · uploaded 29 Jan 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)14 F-2 Q-1 24-25.pdf · uploaded 29 Jan 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)15 F-2 Q-2 24-25.pdf · uploaded 29 Jan 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)16 F-2 Q-3 24-25.pdf · uploaded 29 Jan 2025View
  • Disclosure of sold/ booked inventorySOLD UNSOLD Q-3 FY 24-25.pdf · uploaded 29 Jan 2025View

Promoter documents

  • Legal Title reportSerch Report.pdf · uploaded 16 Mar 2020View
  • Declaration Form BForm-B_compressed.pdf · uploaded 16 Mar 2020View
  • Declaration Form BFORM B UPDATED.pdf · uploaded 15 Sep 2023View

Technical documents

  • Layout ApprovalRevised Layout.pdfView
  • Building Plan ApprovalBuilding Permission.pdfView

Proforma allotment letter

  • Proforma allotment letterATS RERA Draft.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Sawangi, Gangapur taluka

Survey, CTS, gat or plot numbers

2/652/702/70PLOT NO 2/65

As published on MahaRERA's project page

PLOT NO 2/65 AND 2/70

Boundaries

North
Plot No 2-62
South
Plot No 2-75
East
12 Meter Wide Road
West
Plot No 2-47 To 2-58

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectParas M Magar—
Chartered accountantP S Mundada—
EngineerPiyush S Bhavsar—
OtherAnil P Malani—

Source: MahaRERA project page. Contact details are not shown.