Residential / Group Housing · 9 buildings · 96 unitsRERA P51500024894

Villo 67

Deedo IDDP-AUR-W1R8

Its promised completion date, Mar 2026, has passed and MahaRERA does not show it completed; no MahaRERA orders on record; 84% of its units are booked.

Itkheda, Aurangabad 431003 · Promoter: Choudhary Bhaishree Landmarks LLP

Delivery7 mo past duePromised Mar 2026 · no extension on record · not shown completedRegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales84% booked81 of 96 units · as the promoter reported to MahaRERA
Villo 67 project report cardPDF: delivery, regulatory orders, people on record, every tower and the registered deals — for your bank or lawyerSee what's inside · from ₹1,499

Its promised completion date, Mar 2026, has passed and MahaRERA does not show it completed

  • This projectRegistered 9 Mar 2020, completion promised 30 Mar 2026, and still not shown completed today.

1 extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales, rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

9 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page. Construction % is the average of the developer's own declared activity progress to MahaRERA, not an inspection.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP51500024894
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P515000248949 Mar 202030 Mar 2026—Choudhary Bhaishree Landmarks LLPProject page
Documents229

109 documents held by Deedo, 120 filings listed on MahaRERA's project page

Title report

Encumbrance details

Form B

Commencement certificate (2)

Form 2 (24)

Show all 229 documentsShow fewer documents

Form 2 (24)

Form 1 (24)

Form 5 (7)

Form 2A (16)

Other (27)

Extension certificate

Registration certificate

Layout plan

Building plan (2)

Allotment letter

Document library

  • Copy of the legal title reportSearch Report.pdf · uploaded 2 Mar 2020View
  • Details of encumbrancesCertificate of Encumbrance.pdf · uploaded 2 Mar 2020View
  • Proforma of Allotment letterAllottment Letter.pdf · uploaded 2 Mar 2020View
  • Declaration in FORM BForm B.pdf · uploaded 2 Mar 2020View
  • Building Plan Approval / NA Order for plotted developmentBulding Permission.pdf · uploaded 4 Mar 2020View
  • Copy of Layout Approval (in case of layout)Bulding Permission.pdf · uploaded 4 Mar 2020View
  • Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 4 Mar 2020View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate.pdf · uploaded 4 Mar 2020View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate.pdf · uploaded 4 Mar 2020View
  • Building Plan Approval / NA Order for plotted developmentBuilding Permission.pdf · uploaded 13 Mar 2020View
  • Commencement Certificates / NA Order for plotted developmentBuilding Permission.pdf · uploaded 13 Mar 2020View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT_CERTIFICATE.pdf · uploaded 16 Sep 2020View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER_CERTIFICATE.pdf · uploaded 16 Sep 2020View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Villo 67.pdf · uploaded 29 Sep 2020View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate 06_compressed.pdf · uploaded 21 Dec 2020View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate09_compressed.pdf · uploaded 21 Dec 2020View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate06_compressed.pdf · uploaded 21 Dec 2020View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate09_compressed.pdf · uploaded 21 Dec 2020View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate Villo.pdf · uploaded 15 May 2021View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate Villo.pdf · uploaded 15 May 2021View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)Villo_compressed.pdf · uploaded 13 Sep 2021View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Villo_compressed.pdf · uploaded 13 Sep 2021View
  • Declaration about Commencement CertificateDeclaration about commencement.pdf · uploaded 29 Sep 2021View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)fORM 5 2019-20.pdf · uploaded 7 Oct 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)March-2020.pdf · uploaded 11 Oct 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)June 2020.pdf · uploaded 11 Oct 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Sep-2020.pdf · uploaded 11 Oct 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)december-2020.pdf · uploaded 11 Oct 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)March-2021.pdf · uploaded 11 Oct 2021View
  • Disclosure of sold/ booked inventorydeclaration of sold units.pdf · uploaded 11 Oct 2021View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Villo June Ar Certificate_compressed.pdf · uploaded 28 Oct 2021View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Villo 67 June Er Certificate_compressed.pdf · uploaded 28 Oct 2021View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER'S CERTIFICATE.pdf · uploaded 25 Feb 2022View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)001.pdf · uploaded 25 Feb 2022View
  • Disclosure of sold/ booked inventory004.pdf · uploaded 25 Feb 2022View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Villo_Ar_Certificate_Sep_21 (1).pdf · uploaded 2 Mar 2022View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Villo_Er_Certificate_Sep_2021_1_.pdf · uploaded 2 Mar 2022View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)2A MAR22.pdf · uploaded 5 May 2022View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER'S CERTIFICATE.pdf · uploaded 22 Jun 2022View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT'S CERTIFICATE DEC21.pdf · uploaded 22 Jun 2022View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHI 31-12-21.pdf · uploaded 11 Oct 2022View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHI 31-03-2022.pdf · uploaded 11 Oct 2022View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHI 30-06-2022.pdf · uploaded 11 Oct 2022View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGI 31-12-21.pdf · uploaded 11 Oct 2022View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGI 31-03-2022.pdf · uploaded 11 Oct 2022View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGI 30-06-2022.pdf · uploaded 11 Oct 2022View
  • Disclosure of sold/ booked inventorySEP21.pdf · uploaded 11 Oct 2022View
  • Disclosure of sold/ booked inventoryDISC MAR22.pdf · uploaded 11 Oct 2022View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)001.pdf · uploaded 12 Oct 2022View
  • Disclosure of sold/ booked inventory001 (2).pdf · uploaded 12 Oct 2022View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)001 (1).pdf · uploaded 3 Nov 2022View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 18 Nov 2022View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 18 Nov 2022View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect certificate.pdf · uploaded 14 Jun 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer certiificate 001 (1).pdf · uploaded 14 Jun 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)004.pdf · uploaded 14 Jun 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)001.pdf · uploaded 14 Jun 2023View
  • Disclosure of sold/ booked inventory001.pdf · uploaded 14 Jun 2023View
  • Disclosure of sold/ booked inventory0012.pdf · uploaded 14 Jun 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)001.pdf · uploaded 13 Jul 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)engineer.pdf · uploaded 13 Jul 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)001.pdf · uploaded 15 Jul 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)CCI_000033.pdf · uploaded 20 Oct 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)arch-30-6-23.pdf · uploaded 27 Oct 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)engi 30-6-23.pdf · uploaded 27 Oct 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)001.pdf · uploaded 27 Oct 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)CCI_000060.pdf · uploaded 7 Nov 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)CCI_000061_removed.pdf · uploaded 7 Nov 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)CCI_000060.pdf · uploaded 7 Nov 2023View
  • Disclosure of sold/ booked inventoryCCI_000028.pdf · uploaded 7 Nov 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)form 2a.pdf · uploaded 13 Jan 2024View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)CCI_000111.pdf · uploaded 13 Jan 2024View
  • Disclosure of sold/ booked inventoryCCI_000104.pdf · uploaded 13 Jan 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)CCI_000121.pdf · uploaded 20 Jan 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)CCI_000122.pdf · uploaded 20 Jan 2024View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)CCI_000111.pdf · uploaded 20 Jan 2024View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)CCI_000196.pdf · uploaded 27 Apr 2024View
  • Disclosure of sold/ booked inventorysold unsold.pdf · uploaded 27 Apr 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect certificate - converted.pdf · uploaded 27 Apr 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers certificate - converted.pdf · uploaded 27 Apr 2024View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)CCI_000270.pdf · uploaded 14 Jul 2024View
  • Disclosure of sold/ booked inventoryCCI_000269.pdf · uploaded 14 Jul 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect 30-6-24 - converted.pdf · uploaded 18 Jul 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers 30-6-24 - converted.pdf · uploaded 18 Jul 2024View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)CCI_000342.pdf · uploaded 10 Oct 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect certificate SEP24.pdf · uploaded 10 Oct 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer certificate .pdf · uploaded 10 Oct 2024View
  • Disclosure of sold/ booked inventorysold unsold 30-9-24.pdf · uploaded 10 Oct 2024View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form2A.pdf · uploaded 10 Oct 2024View
  • Disclosure of sold/ booked inventorySold unsold.pdf · uploaded 14 Jan 2025View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FPRM 2A.pdf · uploaded 14 Jan 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect certifcate.pdf · uploaded 23 Jan 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEERS CERTIFICATE.pdf · uploaded 23 Jan 2025View
  • Form 1Document 54-1.pdf · uploaded 14 May 2025View
  • Form 2Document 55.pdf · uploaded 14 May 2025View
  • Disclosure of Sold and Booked InventoryCCI_000544.pdf · uploaded 14 May 2025View
  • Form 2A (FY 2024-2025)CCI_000616.pdf · uploaded 1 Jul 2025View
  • Withdrawal Update Form 1Form no 1 JUN 25.pdf · uploaded 31 Jul 2025View
  • Withdrawal Update Form 2Form no 2 JUN 25.pdf · uploaded 31 Jul 2025View
  • Form 5 (FY 2024-2025)Document 41.pdf · uploaded 3 Sep 2025View
  • Withdrawal Update Form 1Form no 1 JUN 25.pdf · uploaded 16 Oct 2025View
  • Withdrawal Update Form 2Form no 2 JUN 25.pdf · uploaded 16 Oct 2025View
  • Withdrawal Update Form 1form 1.pdf · uploaded 10 Dec 2025View
  • Withdrawal Update Form 2form 2.pdf · uploaded 10 Dec 2025View
  • Withdrawal Update Form 1Architects Certificate Dec 25.pdf · uploaded 13 Jan 2026View
  • Withdrawal Update Form 2Engineers Certificate Dec 25.pdf · uploaded 13 Jan 2026View
  • Withdrawal Update Form 1Form 1.pdf · uploaded 24 Apr 2026View
  • Withdrawal Update Form 2Form 2.pdf · uploaded 24 Apr 2026View
  • Form 2A (FY 2025-2026)organized-1.pdf · uploaded 29 Jun 2026View
  • Withdrawal Update Form 1Villo ARCHITECT FORM1.pdf · uploaded 24 Jul 2026View
  • Withdrawal Update Form 2Villo Enginners Form 2.pdf · uploaded 24 Jul 2026View
  • Form 5 (FY 2025-2026)VILLO FORM 5 2025-2026.pdf · uploaded 16 Sep 2026View

Promoter documents

  • Legal Title reportSearch Report.pdf · uploaded 2 Mar 2020View
  • Declaration Form BForm B.pdf · uploaded 2 Mar 2020View

Technical documents

  • Building Plan ApprovalBulding Permission.pdfView
  • Layout ApprovalBulding Permission.pdfView
  • Building Plan ApprovalBuilding Permission.pdfView
  • Building Plan Approvalrevised plans.pdfView

Commencement certificates and NA orders

  • Commencement certificate / NA orderSource

Proforma allotment letter

  • Proforma allotment letterAllottment Letter.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsGUT NO 44, GUT NO 44 · Aurangabad Mahanagarpalika

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Active
Address
Gut No 44, Ithkheda Road, ItkhedaPIN 431003
Village
Itkheda, Aurangabad taluka
Land area for this project
12,000 sq m (1,29,167 sq ft)
Permissible built-up area
11,389 sq m (1,22,588 sq ft)
Sanctioned built-up area
10,086 sq m (1,08,560 sq ft)
Recreational open space
1,100 sq m (11,840 sq ft)
Planning authority
Aurangabad Mahanagarpalika
Designated bank account
State Bank Of India
Developed in phases
No
Litigation declared by promoter
None declared
Financial encumbrance declared
Yes

Survey, CTS, gat or plot numbers

GUT NO 44GUT NO 44

Land as published on MahaRERA's project page

GUT NO 44

Boundaries

North
Itkheda Road
South
Land Of Gut No 37 38 And 45
East
Land Of Gut No 46
West
Part Land Of Gut No 44

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking136 parking spaces

0 units registered

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
Rh No A 1 To 9Closed/Covered0180018
Rh No A 1 To 9Garages00000
Rh No B 10 To 17Closed/Covered0180018
Rh No B 10 To 17Garages00000
Rh No C 18 To 24Closed/Covered0140014
Rh No C 18 To 24Garages00000
Rh No D 25 To 32Closed/Covered0160016
Rh No D 25 To 32Garages00000
Show all 16 parking rowsShow fewer parking rows
BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
Rh No E 33 To 40Closed/Covered0160016
Rh No E 33 To 40Garages00000
Rh No F 41 To 50Closed/Covered0200020
Rh No F 41 To 50Garages00000
Rh No G 51 To 59Closed/Covered0180018
Rh No G 51 To 59Garages00000
Rh No H 60 To 67Closed/Covered0160016
Rh No H 60 To 67Garages00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress9 buildings and areas

Work completed, as the promoter reported it to MahaRERA (Form 1)

Rh No A 1 To 9

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Rh No B 10 To 17

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises80%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Rh No C 18 To 24

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises75%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Show all 9 buildings and common areasShow fewer buildings and common areas

Rh No D 25 To 32

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Rh No E 33 To 40

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Rh No F 41 To 50

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises75%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Rh No G 51 To 59

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises50%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%

Rh No H 60 To 67

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsOnly Paved Surface in Trimix Cocrete98%
  • Water SupplyTHROUGH BOREWELL AND AMC water supply95%
  • Sewerage (Chamber, Lines, Septic Tank , STP)AS PER DRAWING95%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingAS PER DRAWING95%
  • Street LightingAS PER DRAWING92%
Show all 15 activitiesShow fewer activities
  • Community Buildings0%
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingAS PER DRAWING95%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationAS PER DRAWING95%
  • Aggregate area of recreational Open SpaceAS PER DRAWING100%
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Professionals7

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectSameer Ausekar—
ArchitectSameer Ausekar—
Chartered accountantBalaprasad Zanwar—
Chartered accountantNarendra Navandar—
Chartered accountantPrasad Harale And Associates—
EngineerMilind Wadekar—
EngineerNanasaheb Tayade—

Source: MahaRERA project page. Contact details are not shown.