Akshad Super City Phase 1

Lapsed

Gangapur Jahagir, Aurangabad 431154 |Promoter: Vansh Infrastructure

Residential / Group HousingRERAP51500015197
7 Feb 2018Registered with MahaRERA
19 Feb 2022Promised completion
7Buildings
172Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Lapsed
Buildings
7
Unit types
Shop, 1BHK, 1RK, 2BHK172 units in all
Land area for this project
8,890 sq m (95,691 sq ft)
Permissible built-up area
10,514 sq m (1,13,168 sq ft)
Sanctioned built-up area
10,514 sq m (1,13,168 sq ft)
Recreational open space
583 sq m (6,275 sq ft)
Address
129, Near Shendra Midc, Near Shendra MidcPIN 431154
Designated bank account
The Shamrao Vithal Cooperative Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.02835, 73.33108
Akshad Super City Phase 1 is at latitude 19.02835, longitude 73.33108.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 19 Feb 2022

The latest completion date on record passed 4 years and 8 months ago.

Registered
7 Feb 2018
Promised
19 Feb 2022

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P515000151977 Feb 201819 Feb 2022—Vansh InfrastructureProject page

7 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
A Block216
Amenities Shops220
Apartment Tower 2672
B Block116
C Block116
L Type Block216
M Block116

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

172 units registered

Shop · 36 units1BHK · 28 units1RK · 100 units2BHK · 8 units
BuildingTypeCarpet areaUnits
A BlockShop53.3 sq m · 574 sq ft16
Amenities ShopsShop12 sq m · 129 sq ft20
Apartment Tower 21BHK36 sq m · 388 sq ft4
Apartment Tower 21RK12.28 sq m · 132 sq ft4
Apartment Tower 21RK15.93 sq m · 171 sq ft64
B Block1RK21.18 sq m · 228 sq ft16
C Block1RK21.18 sq m · 228 sq ft16
L Type Block1BHK32.54 sq m · 350 sq ft12
L Type Block2BHK60.26 sq m · 649 sq ft4
M Block1BHK32.54 sq m · 350 sq ft12
M Block2BHK60.26 sq m · 649 sq ft4

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
A BlockClosed/Covered00000
A BlockOpen Space00000
Amenities ShopsClosed/Covered00000
Amenities ShopsOpen Space00000
Apartment Tower 2Closed/Covered00001
Apartment Tower 2Open Space00000
B BlockClosed/Covered00000
B BlockOpen Space00000
C BlockClosed/Covered00000
C BlockOpen Space00000
L Type BlockClosed/Covered00000
L Type BlockOpen Space00000
M BlockClosed/Covered00000
M BlockOpen Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

A Block

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Amenities Shops

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Apartment Tower 2

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

B Block

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

C Block

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

L Type Block

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

M Block

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsAS PER CONSULTANT100%
  • Water SupplyBOREWELL100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)AS PER CONSULTANT100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingAS PER CONSULTANT100%
  • Street LightingAS PER CONSULTANT100%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingAS PER CONSULTANT100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationAS PER CONSULTANT100%
  • Aggregate area of recreational Open SpaceAS PER CONSULTANT100%
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

19 documents held by Deedo, 28 filings listed on MahaRERA's project page

Others

Registration certificate

Document library

  • Copy of the legal title reportjpg2pdf.pdf · uploaded 1 Feb 2018View
  • Building Plan Approval (IOD)1.PDF · uploaded 1 Feb 2018View
  • Building Plan Approval (IOD)2.PDF · uploaded 1 Feb 2018View
  • Building Plan Approval (IOD)3.PDF · uploaded 1 Feb 2018View
  • Building Plan Approval (IOD)4.PDF · uploaded 1 Feb 2018View
  • Building Plan Approval (IOD)6.PDF · uploaded 1 Feb 2018View
  • Building Plan Approval (IOD)7.PDF · uploaded 1 Feb 2018View
  • Building Plan Approval (IOD)8.PDF · uploaded 1 Feb 2018View
  • Copy of Layout Approval (in case of layout)Layout plan super city.PDF · uploaded 1 Feb 2018View
  • Commencement Certificates / NA Order for plotted developmentjpg2pdf (1).pdf · uploaded 1 Feb 2018View
  • Declaration in FORM Bjpg2pdf (2).pdf · uploaded 1 Feb 2018View
  • Proforma of Allotment lettercombinepdf.pdf · uploaded 1 Feb 2018View
  • Details of encumbrancesjpg2pdf (4).pdf · uploaded 1 Feb 2018View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Architech Certificate.pdf · uploaded 26 Mar 2022View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer s Certificate.pdf · uploaded 26 Mar 2022View
  • CERSAI detailsCERSAIREPORTPHASEI.pdf · uploaded 26 Mar 2022View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)CHARTERED ACCOUNTANTS CERTIFICATE.pdf · uploaded 26 Mar 2022View

Promoter documents

  • Legal Title reportjpg2pdf.pdf · uploaded 1 Feb 2018View
  • Declaration Form Bjpg2pdf (2).pdf · uploaded 1 Feb 2018View

Technical documents

  • Building Plan Approval1.PDFView
  • Building Plan Approval2.PDFView
  • Building Plan Approval3.PDFView
  • Building Plan Approval4.PDFView
  • Building Plan Approval6.PDFView
  • Building Plan Approval7.PDFView
  • Building Plan Approval8.PDFView
  • Layout ApprovalLayout plan super city.PDFView

Proforma allotment letter

  • Proforma allotment lettercombinepdf.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Gangapur Jahagir, Aurangabad taluka

Survey, CTS, gat or plot numbers

129

As published on MahaRERA's project page

129

Boundaries

North
Remaining Land Gut No 129
South
Land Gut No 130
East
Nala
West
Gairan

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectPiyush S Bhavsar—
Chartered accountantEkta Kuthiala And Associates—
EngineerIzhar Ahmed—
OtherPiyush Rameshbhai Makwana—

Source: MahaRERA project page. Contact details are not shown.

Data through10 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology