Skip to content
Deedo home
Menu

Radha City

Lapsed

Walgaon, Amravati 444601 |Promoter: Ravi sahu, Rupesh sahu And Deepak sahu

18 Mar 2020Registered with MahaRERA
30 Mar 2023Promised completion
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Plotted
Status on MahaRERA
Lapsed
Land area for this project
11,030 sq m (1,18,726 sq ft)
Permissible built-up area
0 sq m (0 sq ft)
Sanctioned built-up area
0 sq m (0 sq ft)
Recreational open space
1,674 sq m (18,018 sq ft)
Address
Gat No 150 Survey No 280/2, Walgaon, WalgaonPIN 444601
Designated bank account
Icici Bank Limited
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
Radha City is at latitude 0.00000, longitude 0.00000.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Mar 2023

The latest completion date on record passed 3 years and 7 months ago.

Registered
18 Mar 2020
Promised
30 Mar 2023

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5030002507618 Mar 202030 Mar 2023—Ravi sahu, Rupesh sahu And Deepak sahuProject page

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Building

  • ExcavationNot applicable
  • Basement (if any)Not applicable
  • Podiums (if any)Not applicable
  • PlinthNot applicable
  • Stilt FloorNot applicable
  • Slabs of Super StructureNot applicable
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
  • Sanitary Fittings within the flats / premisesNot applicable
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Common areas and amenities

  • Internal Roads & FootpathsWBM100%
  • Water SupplyBorewell100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Not applicable
  • Storm Water DrainsKachi Nali100%
  • Landscaping & Tree PlantingTree Plantation100%
  • Street LightingStreet Light100%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingRain water harvesting100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationDP100%
  • Aggregate area of recreational Open SpaceAs per Sanction100%
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

16 documents held by Deedo, 20 filings listed on MahaRERA's project page

Title

Encumbrance

Form b

Form 1

Form 2

Allotment letters

Completions

Form 2a

Registration certificate

Other

Layout plan

Commencement certificate

Document library

  • Copy of the legal title reportTITLE SEARCH REPORT_0001.pdf · uploaded 13 Mar 2020View
  • Details of encumbrancesENCUMBRANCES CERTIFICATE_0001.pdf · uploaded 13 Mar 2020View
  • Building Plan Approval / NA Order for plotted developmentNA ORDER_0001.pdf · uploaded 13 Mar 2020View
  • Commencement Certificates / NA Order for plotted developmentNA ORDER_0001.pdf · uploaded 13 Mar 2020View
  • Proforma of Allotment letterALLOTMENT LATTER_0001.pdf · uploaded 13 Mar 2020View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Sahu Walgaon.pdf · uploaded 13 Mar 2020View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 sahu walgaon.pdf · uploaded 13 Mar 2020View
  • Declaration in FORM BForm B.pdf · uploaded 13 Mar 2020View
  • Proforma of Allotment letterATS.pdf · uploaded 13 Mar 2020View
  • Copy of Layout Approval (in case of layout)MAP.pdf · uploaded 13 Mar 2020View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentForm-4 sr no 150.pdf · uploaded 9 Mar 2021View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentCompletion 150.pdf · uploaded 9 Mar 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form-2A Sr no 150-1.pdf · uploaded 3 Aug 2021View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentForm 4_150.pdf · uploaded 3 Aug 2021View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentCompletion Certificate_150.pdf · uploaded 3 Aug 2021View

Promoter documents

  • Legal Title reportTITLE SEARCH REPORT_0001.pdf · uploaded 13 Mar 2020View
  • Declaration Form BForm B.pdf · uploaded 13 Mar 2020View

Technical documents

  • NA Order for Plotted DevelopmentNA ORDER_0001.pdfView
  • Layout ApprovalMAP.pdfView

Proforma allotment letter

  • Proforma allotment letterATS.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Walgaon, Amravati taluka

Survey, CTS, gat or plot numbers

150280/2Gat No 150 Survey No 280/2

As published on MahaRERA's project page

Gat No 150 Survey No 280/2

Boundaries

North
Govt Road
South
Field Of Bhagwantrao Tayde
East
Field Of Nirmala Gupta
West
Field Of Bandu Shirbhate

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectNitin Zade—
Chartered accountantCA Abhinav Welekar—
EngineerNitin Zade—
OtherBhojraj Nagarale—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology