Vrundawan by Govinda Group

Completed

Amravati (M Corp.), Amravati 444601 |Promoter: Vijay Nanakram Talda

Residential / Group HousingRERAP50300016945
22 Jun 2018Registered with MahaRERA
30 Mar 2023Promised completion
1Building
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Land area for this project
5,723 sq m (61,596 sq ft)
Permissible built-up area
8,004 sq m (86,152 sq ft)
Sanctioned built-up area
7,837 sq m (84,355 sq ft)
Address
Plot No 1 S No. 83/2a, National Highway No. 6, RahatgaonPIN 444601
Designated bank account
Hdfc Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
Vrundawan by Govinda Group is at latitude 0.00000, longitude 0.00000.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Mar 2023

The latest completion date on record passed 3 years and 7 months ago.

Registered
22 Jun 2018
Promised
30 Mar 2023

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5030001694522 Jun 201830 Mar 2023—Vijay Nanakram TaldaProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Vrundawan By Govinda Group13—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00001
Open Space00001

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Vrundawan By Govinda Group

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)50%
  • Plinth100%
  • Stilt Floor90%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyWATER SUPPLY SHALL BE APPLIED AFTER RECEIPT OF OC0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)NO STP0%
  • Storm Water DrainsAS PER PLAN0%
  • Landscaping & Tree PlantingAS PER BUILDING PERMIT0%
  • Street LightingONLY IN PROJECTED PREMISES0%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterSEPTIC TANK WILL BE PROVIDED AS PER DEVELOPMENT PL0%
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingAS PER PLAN0%
  • Energy managemcntSOLAR WATER HEATERS ONLY SHALL BE PROVIDED ON ROOF0%
  • Fire protection and fire safety requirementsAS PER PLAN0%
  • Electrical meter room, sub-station, receiving stationNO SUBSTATION ONLY. ELECTRIC PANEL BOARD0%
  • Aggregate area of recreational Open SpaceGARDEN SPACE FOR CHILDREN0%
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

24 documents held by Deedo, 31 filings listed on MahaRERA's project page

Title

Encumbrances

Commencement certificate

Form b

Form 5s

Completion

Form 4

Form 1

Form 2

Form 2a

Registration certificate

Others

Layout plan

Building plans

Allotment letter

Document library

  • Copy of the legal title reportR83_Search.pdf · uploaded 18 Jun 2018View
  • Details of encumbrancesR83_EC.pdf · uploaded 18 Jun 2018View
  • Building Plan Approval (IOD)R83_IOD.pdf · uploaded 18 Jun 2018View
  • Building Plan Approval (IOD)R83_IOD 1.pdf · uploaded 18 Jun 2018View
  • Commencement Certificates / NA Order for plotted developmentR83_CC.pdf · uploaded 18 Jun 2018View
  • Declaration in FORM BR83_Form B.pdf · uploaded 18 Jun 2018View
  • Proforma of Allotment letterR83_ATS.pdf · uploaded 18 Jun 2018View
  • Building Plan Approval (IOD)R83_IOD 2.pdf · uploaded 18 Jun 2018View
  • OtherR83_Flat List.pdf · uploaded 18 Jun 2018View
  • Copy of Layout Approval (in case of layout)R83_NA Order.pdf · uploaded 18 Jun 2018View
  • Details of encumbrancesSD909.pdf · uploaded 28 Oct 2020View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)F5 Vrundawan 1819.pdf · uploaded 21 May 2021View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)F5 Vrundawan 1920.pdf · uploaded 21 May 2021View
  • Disclosure of sold/ booked inventoryvrundawan.pdf · uploaded 23 Jun 2021View
  • Architect’s Certificate on Completion of Project (Form 4)IMG_20210702_0002.pdf · uploaded 7 Jul 2021View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentcc vrundawan.pdf · uploaded 7 Jul 2021View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 VRUNDAWAN.pdf · uploaded 15 Aug 2021View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 VRUNDAWAN.pdf · uploaded 15 Aug 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)FORM 2A VRUNDAWAN.pdf · uploaded 15 Aug 2021View
  • Disclosure of sold/ booked inventoryVrundawan.pdf · uploaded 20 Aug 2021View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Vrundawan.pdf · uploaded 28 Sep 2021View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Vrundawan.pdf · uploaded 20 Sep 2022View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Vrundawan FY 2021-22.pdf · uploaded 18 Jan 2023View

Promoter documents

  • Legal Title reportR83_Search.pdf · uploaded 18 Jun 2018View
  • Declaration Form BR83_Form B.pdf · uploaded 18 Jun 2018View

Technical documents

  • Building Plan ApprovalR83_IOD.pdfView
  • Building Plan ApprovalR83_IOD 1.pdfView
  • Building Plan ApprovalR83_IOD 2.pdfView
  • Layout ApprovalR83_NA Order.pdfView

Other legal documents

  • OtherR83_Flat List.pdfView

Proforma allotment letter

  • Proforma allotment letterR83_ATS.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Amravati (M Corp.), Amravati taluka

Survey, CTS, gat or plot numbers

183/2APLOT NO 1 S NO. 83/2A

As published on MahaRERA's project page

PLOT NO 1 S NO. 83/2A

Boundaries

North
Other Field
South
Other Field
East
Other Field
West
Amravati Nagpur Highway

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectLokesh Kadu—
EngineerPankaj Bajaj—

Source: MahaRERA project page. Contact details are not shown.