Vasudeo Apartment

Completed

Amravati (M Corp.), Amravati 444607 |Promoter: Saurabh Raju Ingole

8 Mar 2022Registered with MahaRERA
31 Mar 2027Promised completion
1Building
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Completed
Buildings
1
Land area for this project
511 sq m (5,502 sq ft)
Permissible built-up area
1,751 sq m (18,851 sq ft)
Sanctioned built-up area
1,751 sq m (18,851 sq ft)
Address
61 And 62 Survey No. 23 Mouje Akoli, Plot No. 61 and 62 Survey no 23 Mouje Akoli, Akoli Road, Vasudeo NagriPIN 444607
Designated bank account
State Bank Of India
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Mar 2027

Registered
8 Mar 2022
Promised
31 Mar 2027

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P503000338008 Mar 202231 Mar 2027—Saurabh Raju IngoleProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Vasudeo Apartment8—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00000
Open Space00009

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Vasudeo Apartment

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyAS PER MAP100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)AS PER MAP100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingAS PER MAP100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingAS PER MAP100%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

18 documents held by Deedo, 21 filings listed on MahaRERA's project page

Title report

Encumbrance details

Commencement certificate (2)

Form B

Other (2)

Allotment letter (2)

Show all 39 documentsShow fewer documents

Allotment letter (2)

Registration certificate

Form 2A

Form 5 (3)

Occupancy / completion certificate

  • Occupancy / completion certificate6 Mar 2024ViewSource

Form 4

Layout plan

Building plan

Document library

  • Copy of the legal title reportSEARCH_compressed.pdf · uploaded 20 Feb 2022View
  • Declaration in FORM Bform b_compressed.pdf · uploaded 20 Feb 2022View
  • Details of encumbrancesNon Encum.pdf · uploaded 20 Feb 2022View
  • Declaration about Commencement CertificateDECLARATION.pdf · uploaded 20 Feb 2022View
  • Proforma of Allotment letterallotment.pdf · uploaded 20 Feb 2022View
  • Commencement Certificates / NA Order for plotted developmentSanction LATTER_11zon.pdf · uploaded 20 Feb 2022View
  • Copy of Layout Approval (in case of layout)PLOT_11zon.pdf · uploaded 20 Feb 2022View
  • CERSAI detailsCERSAI_Search_Report_200230700983_For_Asset_Based_Search_21_02_2022_00_02_20_358.pdf · uploaded 20 Feb 2022View
  • Building Plan Approval / NA Order for plotted developmentSanction Drawing (2)_page-0001.pdf · uploaded 2 Mar 2022View
  • Proforma of Allotment letterAgreement to Sell Vasudeo Apartment.pdf · uploaded 2 Mar 2022View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Adobe Scan 06 Feb 2023 (1)_compressed.pdf · uploaded 13 Feb 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A (2).pdf · uploaded 13 Feb 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)NSC 2021-22.pdf · uploaded 6 Mar 2024View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)NSC 2022-23.pdf · uploaded 6 Mar 2024View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentNSC OC.pdf · uploaded 6 Mar 2024View
  • Architect’s Certificate on Completion of Project (Form 4)Form 4 Architect Certificate (1).pdf · uploaded 12 Mar 2024View

Promoter documents

  • Declaration Form Bform b_compressed.pdf · uploaded 20 Feb 2022View
  • Legal Title reportSEARCH_compressed.pdf · uploaded 20 Feb 2022View

Technical documents

  • Layout ApprovalPLOT_11zon.pdfView
  • Building Plan ApprovalSanction Drawing (2)_page-0001.pdfView

Proforma allotment letter

  • Proforma allotment letterallotment.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Amravati (M Corp.), Amravati taluka

Survey, CTS, gat or plot numbers

6162 Survey No. 23 Mouje Akoli

As published on MahaRERA's project page

61 And 62 Survey No. 23 Mouje Akoli

Boundaries

North
Road
South
Road
East
Road
West
Plot 60

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectRushikesh Ingole—
Chartered accountantCa Tapesh Mundada—
EngineerEr Saurabh Ingole—
OtherRishabh Khandelwal—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology