Amravati (M Corp.), Amravati 444601 |Promoter: Sumangal Associates

Residential / Group HousingRERAP50300017220
23 Jul 2018Registered with MahaRERA
30 Dec 2022Promised completion
1Building
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Land area for this project
570 sq m (6,135 sq ft)
Permissible built-up area
625 sq m (6,728 sq ft)
Sanctioned built-up area
625 sq m (6,728 sq ft)
Address
Plot No. 29a, 29b, 30a, Mauje - Shegaon, Survey No. 52-PartPIN 444601
Designated bank account
Hdfc Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
Varad Enclave is at latitude 0.00000, longitude 0.00000.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Dec 2022

The latest completion date on record passed 3 years and 10 months ago.

Registered
23 Jul 2018
Promised
30 Dec 2022

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5030001722023 Jul 201830 Dec 2022—Sumangal AssociatesProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Varad Enclave5—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00000
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Varad Enclave

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor30%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyAS PER PLAN0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)AS PER PLAN0%
  • Storm Water DrainsAS PER PLAN0%
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterAS PER PLAN0%
  • Solid Waste Management And DisposalAS PER PLAN0%
  • Water conservation /Rain water harvestingAS PER PLAN0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationAS PER PLAN0%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

13 documents held by Deedo, 18 filings listed on MahaRERA's project page

Title

Form b

Commencement certificate

Form 1s

Form 2s

Allotment letters

Completion

Registration certificate

Other

Layout plan

Document library

  • Copy of the legal title reportSEARCH REPORT.pdf · uploaded 13 Jul 2018View
  • Details of encumbrancesFORM B.pdf · uploaded 13 Jul 2018View
  • Declaration in FORM BFORM B.pdf · uploaded 13 Jul 2018View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCHITECT CERTIFICATE.pdf · uploaded 13 Jul 2018View
  • Proforma of Allotment letterALLOTMENT LETTER.pdf · uploaded 13 Jul 2018View
  • Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT CERTIFICATE.pdf · uploaded 13 Jul 2018View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENGINEER CERTIFICATE.pdf · uploaded 13 Jul 2018View
  • Proforma of Allotment letterReduced Agreement to Sales.pdf · uploaded 13 Jul 2018View
  • Copy of Layout Approval (in case of layout)SCAN MAP REDUCED.pdf · uploaded 13 Jul 2018View
  • Building Plan Approval (IOD)SCAN MAP REDUCED.pdf · uploaded 13 Jul 2018View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 NEW.pdf · uploaded 15 Feb 2019View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 NEW.pdf · uploaded 15 Feb 2019View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOC.pdf · uploaded 11 Nov 2019View

Promoter documents

  • Legal Title reportSEARCH REPORT.pdf · uploaded 13 Jul 2018View
  • Declaration Form BFORM B.pdf · uploaded 13 Jul 2018View

Technical documents

  • Layout ApprovalSCAN MAP REDUCED.pdfView
  • Building Plan ApprovalSCAN MAP REDUCED.pdfView

Proforma allotment letter

  • Proforma allotment letterReduced Agreement to Sales.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Amravati (M Corp.), Amravati taluka

Survey, CTS, gat or plot numbers

29B30APLOT NO. 29A

As published on MahaRERA's project page

PLOT NO. 29A, 29B, 30A

Boundaries

North
Plot No 30b
South
Plot No 28a 28b
East
Other Layout
West
Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectPradnya Nagpure—
EngineerPankaj Deshmukh And Associates—
OtherSanjay Nagpure—